Why a Johannesburg car-service workshop runs out of time
Worked case with 13 questions and 1 exhibit
Case
A chain of eight car-service workshops in Johannesburg is losing customers. Cars booked for a same-day service are often not ready by closing time, and the workshops turn bookings away when the day is full. The owner thinks each workshop needs more service bays. He asks whether to build them, or what else to do.
Candidate-led: you map the process and ask for the numbers; the interviewer answers only what you ask.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does a typical workshop look like?
What the interviewer says
Six service bays, open nine hours a day, doing routine services and minor repairs for most car brands. Start with one typical workshop; the others are similar.
History
When did the problem start?
What the interviewer says
About a year ago, when the main parts supplier moved its warehouse further from the city.
Objective
What does the owner want?
What the interviewer says
To stop losing customers and to add profit. He has set aside about ZAR 2 million per workshop for new bays.
Financials
What does one service earn?
What the interviewer says
About ZAR 1,200 of contribution. The workshops open about 300 days a year.
Customers
How many cars want a service each day?
What the interviewer says
About 24 cars a day at a typical workshop.
What exactly do customers complain about?
What the interviewer says
Long waits, and cars not finished the same day. When the day is full, callers are told to come another day, and many go to a rival.
Competitors
Who are the rivals?
What the interviewer says
Franchised dealer workshops, which charge about 40 percent more, and many small independent garages.
Operations
How long does a service take?
What the interviewer says
About two hours of work.
Do cars ever sit in a bay without being worked on?
What the interviewer says
Yes. Two weeks of bay records are in the exhibit.
Is there space to park cars outside the bays?
What the interviewer says
Yes. A yard behind each workshop holds about ten cars.
What would it cost to move waiting cars and stock more parts?
What the interviewer says
A driver to move cars costs ZAR 180,000 a year. A stock of the 40 most-used parts needs ZAR 250,000 one time.
Are the mechanics well trained?
What the interviewer says
Yes. Staff turnover is low, and all mechanics hold trade certificates.
Constraints
Is there anything the owner will not change?
What the interviewer says
He will not raise prices this year, and any change must work in all eight workshops.
Exhibit
Exhibit 1
| Group of cars | Share of cars (%) | Work time in the bay (hours) | Time waiting for parts in the bay (hours) |
|---|---|---|---|
| Parts already in stock | 70 | 2 | 0 |
| Parts ordered after the car arrives | 30 | 2 | 4 |
Source: illustrative workshop records.
Solution
Show the solutionHide the solution
Hypothesis
A workshop is limited by its service bays, so my hypothesis is that bays are the bottleneck, and that something other than the repair work itself, such as waiting for parts, is using up bay time.
Structure
- Bay capacity versus demand, and what uses up bay timeThis comes from cars served = bays x hours open / hours each car holds a bay, compared with cars arriving.
- Demand: cars arriving per day
- Key: Capacity: bays x hours / hours each car holds a bay
- Repair work
- Key: Waiting for parts in the bay
- Value of recovered capacity and cost of the fix
Analysis
1. Capacity in theory
Candidate: "How many bays, how long is the day, and how long does a service take?" Interviewer: "Six bays, open nine hours, and a service is about two hours of work."
Cars per day in theory: 6 × 9 ÷ 2 = 27
2. Compare with demand
Interviewer: "About 24 cars a day want a service." Candidate: "In theory the bays should cope, at about 89 percent use. So something else is using bay time."
Required utilization in theory (%): 24 ÷ 27 × 100 = 88.89
3. Find the hidden bay time
Candidate: "Do cars ever sit in a bay without being worked on?" Interviewer: "Yes. About 30 percent of cars wait for parts, on average for four hours, and they stay in the bay while they wait."
Average bay hours per car: 2 + 0.3 × 4 = 3.2
4. Real capacity
With each car holding a bay for 3.2 hours on average, the workshop can finish far fewer cars than demand.
Cars per day in practice: 6 × 9 ÷ (2 + 0.3 × 4) = 16.88
5. Cars lost each day
Demand the workshop cannot serve.
Cars turned away per day: 24 - 6 × 9 ÷ (2 + 0.3 × 4) = 7.13
6. Value of the lost work
Interviewer: "Each service earns about ZAR 1,200 of contribution, and we open about 300 days a year."
Lost contribution (ZAR a year): (24 - 16.875) × 1,200 × 300 = 2,565,000
7. Cost of the fix
Candidate: "Instead of building bays, move cars that wait for parts to a parking area and keep the 40 most-used parts in stock." Interviewer: "A driver to move cars costs ZAR 180,000 a year, and the parts stock needs ZAR 250,000 one time."
Net gain in year one (ZAR): 2,565,000 - 180,000 - 250,000 = 2,135,000
- The exhibit: Three cars in ten hold a bay for six hours instead of two, while nobody works on them for four of those hours.
Recommendation
Do not build more bays; free the bays that already exist. First, in theory six bays can service 27 cars a day against demand of 24, so the bays are not too few. Second, cars waiting for parts hold a bay for four hours, which raises average bay time from 2 to 3.2 hours. That cuts real capacity to about 17 cars a day, so about 7 cars a day are turned away. Third, moving waiting cars out of the bays and stocking common parts recovers that capacity for about ZAR 430,000 in year one. Today that lost capacity costs about ZAR 2.6 million a year of contribution. The move in play is freeing existing capacity before buying new capacity. In a workshop the scarce resource is bay hours, so any hour a car sits idle in a bay is lost revenue. New bays would fill with waiting cars too. Pilot the change in one workshop for a month, then roll it out.
Risks
- Moving cars in and out of bays adds some handling time
- Parts that are not stocked will still cause delays
- At about 89 percent use, the bays will still build queues on busy days
Next steps
- Record for two weeks how long each car holds a bay and why
- Agree faster delivery times with the two main parts suppliers
- Pilot the parking area and parts stock in one workshop
Strong and weak answers
A strong candidate
Compared capacity in theory with demand, noticed they did not explain the problem, found the hidden bay time, and valued a cheap fix against an expensive one.
A weak candidate
Agreed with the owner to add two bays at each workshop, which costs far more and leaves cars still waiting for parts in the new bays.
Sources
Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.