Finding EUR 10 million of savings
Worked case with 13 questions and 2 exhibits
Case
A car-parts maker in the Czech Republic has total costs of EUR 100 million a year: materials EUR 60 million, labor EUR 30 million and overhead EUR 10 million. Its owner wants EUR 10 million of yearly savings within two years, without hurting quality or delivery. Benchmark gaps for each cost bucket are in the table. The owner asks where the savings should come from.
Interviewer-led: the interviewer shows the cost table and asks whether overhead alone can reach the target, then for the savings by bucket, then for the one-time cost.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the plant make, and for whom?
What the interviewer says
Metal brackets and pressed parts for three European carmakers, from one plant near Brno.
History
Why is the owner asking now?
What the interviewer says
Two carmakers asked for price cuts of about 3 percent a year in new contracts, and profit has fallen for two years.
Objective
Is the target a yearly saving or a total?
What the interviewer says
A yearly saving, fully in place by year two.
Financials
What are revenue and profit today?
What the interviewer says
Revenue is about EUR 108 million, so operating profit is about EUR 8 million.
What do benchmarks suggest?
What the interviewer says
Similar plants pay about 8 percent less for materials and have about 10 percent lower labor cost. Overhead could fall about 20 percent. The gaps are in the table.
Market
How is demand for the parts?
What the interviewer says
Volumes are flat. Carmakers are moving some models to electric drive, which changes which parts they buy.
Customers
How concentrated are the customers?
What the interviewer says
The three carmakers buy about 85 percent of output, on contracts that last the life of a car model.
Competitors
Who are the rivals?
What the interviewer says
Larger suppliers in Poland, Slovakia and Romania, with similar wages and newer presses.
Operations
What makes up the materials bill?
What the interviewer says
Steel is EUR 40 million of the EUR 60 million. The split and the number of suppliers are in the second exhibit.
How much material is wasted?
What the interviewer says
About 6 percent of the steel bought ends up as pressing scrap, sold back to the mills at a low price.
What would the labor saving need?
What the interviewer says
Automating two manual steps and better shift planning, with about EUR 6 million of one-time spending on machines and severance.
How old is the plant?
What the interviewer says
About 25 years. The main presses were replaced eight years ago.
Constraints
Are there limits on what we can do?
What the interviewer says
No plant closures, and quality and delivery must not suffer. Any change to a part's specification needs the carmaker's approval, which takes about six months.
Exhibits
Exhibit 1
| Cost bucket | Cost (EUR m a year) | Benchmark gap or possible cut (%) |
|---|---|---|
| Materials | 60 | 8 |
| Labor | 30 | 10 |
| Overhead | 10 | 20 |
Exhibit 2
| Material | Spend (EUR m a year) | Number of suppliers |
|---|---|---|
| Steel coil | 40 | 2 |
| Aluminum | 8 | 3 |
| Fasteners and bought-in parts | 7 | 25 |
| Paint and coatings | 5 | 4 |
Source: illustrative client purchasing data.
Solution
Show the solutionHide the solution
Hypothesis
Materials are 60 percent of cost, so my hypothesis is that most of the saving must come from materials, with labor second, and that overhead alone cannot reach the target.
Structure
- Savings by bucket versus the EUR 10 million targetThis comes from total cost = materials + labor + overhead; savings = what each bucket can realistically give, added up against EUR 10 million.
- Key: Materials: price, quantity, specification
- Labor: automation and shift planning
- Overhead: zero-based budgeting
- One-time costs and quality checks
Analysis
1. Can overhead alone do it?
Even a deep 20 percent cut in overhead saves only EUR 2 million, a fifth of the target.
Overhead saving (EUR): 10,000,000 × 0.2 = 2,000,000
2. Materials
Close the 8 percent gap to similar plants through supplier tenders and simpler specifications.
Materials saving (EUR): 60,000,000 × 0.08 = 4,800,000
3. Labor
Close the 10 percent gap through automation of two manual steps and better shift planning.
Labor saving (EUR): 30,000,000 × 0.1 = 3,000,000
4. Add it up
Materials plus labor plus overhead.
Total saving (EUR): 4,800,000 + 3,000,000 + 2,000,000 = 9,800,000
5. One-time cost
Interviewer: "The labor saving needs about EUR 6 million of one-time spending on machines and severance; the materials and overhead savings need little upfront spending."
Payback on labor saving (years): 6,000,000 ÷ 3,000,000 = 2
6. Close the last gap with scrap
The plant buys EUR 40 million of steel a year and scraps about 6 percent of it in pressing. Cutting scrap to 5.5 percent, half a point, closes the last EUR 0.2 million.
Saving from half a point less scrap (EUR): 40,000,000 × 0.005 = 200,000
- Exhibit 1: Materials are 60 percent of cost, so even a modest cut there is worth more than a deep cut in overhead.
- Exhibit 2: Steel is two thirds of the materials bill, and fasteners are spread across 25 suppliers, so both are worth a tender.
Recommendation
The target is reachable, but only with materials at the center. First, an 8 percent materials saving gives EUR 4.8 million and needs little upfront spending, so start there, with steel, which is EUR 40 million of the EUR 60 million. Second, a 10 percent labor saving gives EUR 3 million but needs about EUR 6 million of one-time spending, paid back in about two years. Third, a 20 percent overhead cut gives EUR 2 million, bringing the total to EUR 9.8 million, close to the EUR 10 million target. The last EUR 0.2 million needs only about a third of a point more off materials (0.2 of 60 is about 0.3 percent). Cutting pressing scrap from 6 to 5.5 percent of steel would close it. The move in play is a cost transformation driven by procurement. A car-parts supplier spends most of its cost on materials and faces yearly price cuts from carmakers, so buying better is the lever that keeps margins. Check every specification change with the quality team and the carmaker before it goes ahead.
Risks
- Suppliers may resist price cuts or cut service
- Specification changes could hurt quality if not tested
Next steps
- Run tenders on the ten largest purchased items
- Plan the automation project and its timeline
Strong and weak answers
A strong candidate
Sized the buckets, used benchmarks per bucket, added the savings up against the target, and counted the one-time cost.
A weak candidate
Proposed cutting travel and office costs, which are tiny, and never showed a path to EUR 10 million.
Sources
Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.