What this case type is and when it shows up
A cost-cutting case asks how to reduce cost, often to a target such as "10 percent in two years." The discipline is to size the cost buckets first and go after the biggest ones that can be cut, while protecting anything that quietly drives revenue or quality.
The underlying theory, in plain language
Costs split into a few big buckets (for a manufacturer: materials, labor, overhead, distribution). Size them before touching anything, because a small percent cut on the biggest bucket usually beats a deep cut on a small one.
Each bucket has its own levers. Materials and bought-in services: pay less (renegotiate, combine suppliers, run tenders), buy less (reduce waste and over-ordering), or specify smarter (simpler designs, standard parts). Labor: automation, better shift planning, and fewer management layers where teams are small. Overhead: zero-based budgeting (building each budget from zero rather than from last year's figure), shared services, and closing underused sites.
Most cuts need one-time spending first (severance, new machines, IT), so count it and show the payback. Then judge each cut on what breaks if you make it: cutting the sales force or quality checks can reduce cost and revenue at the same time.
What the prompts sound like, from simple to hard
- Simple: a bakery chain in the UK has costs that are too high; where to cut.
- Medium: a manufacturer in the Czech Republic must cut 10 percent of cost in two years.
- Hard: cut deeply in a downturn without losing the ability to recover.
Build the structure from the goal
Three moves that give you the structure
- Start from the decision. How much cost must come out, by when, and without hurting what (quality, safety, growth)?
- Write the maths of the goal. Total cost = the sum of the cost buckets. Each bought item costs price x quantity, and the specification drives both. Savings = the sum of the realistic saving each bucket can give, compared with the target.
- Let the business pick the branches. The cost shape of the industry tells you where the money is. A manufacturer spends most on materials, so start with buying and specification. A services firm or a hospital spends most on people, so start with how work is organised, while protecting the front line. An airline's fuel and aircraft costs dwarf its office costs.
- Savings by cost bucket versus the 8 percent target
- Key: Fuel: price hedging and fuel used per flight
- Aircraft: lease cost and hours flown per day
- Airport and handling fees
- Crew: rosters and productivity
This comes from total cost = the sum of the buckets. Fuel and aircraft are the biggest buckets in an airline, so they come before offices.
- Savings by cost bucket versus the 10 percent target
- Key: People: share of paid hours billed to clients
- Office space after hybrid working
- Travel and outside contractors
- Support teams: shared services
Same maths, a different cost shape. In services, people are most of the cost, so how many paid hours are billed decides the saving.
Why a generic structure scores lower
Starting with travel and perks because they are visible sizes nothing that matters. Interviewers score the candidate who sizes the biggest buckets first.
Crack any case in five movesFinding and narrowing the real problem
Size the cost buckets, estimate a realistic saving for each from benchmarks, add them up against the target, and rank by size, ease, and risk rather than cutting the most visible expense.
Names you may hear, kept as questions that fall out of the goal maths
- Cost-bucket tree: Which buckets make up total cost, and how big is each? This is the goal maths itself. Where it stops helping: Buckets vary by business; build the tree for this one, not a generic one.
- Price, quantity, specification: For any bought item, can we pay less, use less, or buy something simpler? Where it stops helping: Specification changes need quality checks before they go ahead.
- Cut versus consequence: How big is each saving, and what could it damage (revenue, quality, safety, skills)? Where it stops helping: Consequences are easy to underestimate.
Methods for solving this type
- Build a cost tree and size each bucket
- Estimate a realistic saving per bucket from benchmarks
- Add the savings up against the target
- Count one-time costs and payback
- Check each cut for damage to revenue or quality
The math patterns it relies on
- Each bucket as a share of total cost
- Savings = bucket size x percent cut
- Sum of savings versus the target
- Payback on one-time costs
Worked cases
Worked case
Finding EUR 10 million of savings
Case
A car-parts maker in the Czech Republic has total costs of EUR 100 million a year: materials EUR 60 million, labor EUR 30 million and overhead EUR 10 million. Its owner wants EUR 10 million of yearly savings within two years, without hurting quality or delivery. Benchmark gaps for each cost bucket are in the table. The owner asks where the savings should come from.
Interviewer-led: the interviewer shows the cost table and asks whether overhead alone can reach the target, then for the savings by bucket, then for the one-time cost.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the plant make, and for whom?
What the interviewer says
Metal brackets and pressed parts for three European carmakers, from one plant near Brno.
History
Why is the owner asking now?
What the interviewer says
Two carmakers asked for price cuts of about 3 percent a year in new contracts, and profit has fallen for two years.
Objective
Is the target a yearly saving or a total?
What the interviewer says
A yearly saving, fully in place by year two.
Financials
What are revenue and profit today?
What the interviewer says
Revenue is about EUR 108 million, so operating profit is about EUR 8 million.
What do benchmarks suggest?
What the interviewer says
Similar plants pay about 8 percent less for materials and have about 10 percent lower labor cost. Overhead could fall about 20 percent. The gaps are in the table.
Market
How is demand for the parts?
What the interviewer says
Volumes are flat. Carmakers are moving some models to electric drive, which changes which parts they buy.
Customers
How concentrated are the customers?
What the interviewer says
The three carmakers buy about 85 percent of output, on contracts that last the life of a car model.
Competitors
Who are the rivals?
What the interviewer says
Larger suppliers in Poland, Slovakia and Romania, with similar wages and newer presses.
Operations
What makes up the materials bill?
What the interviewer says
Steel is EUR 40 million of the EUR 60 million. The split and the number of suppliers are in the second exhibit.
How much material is wasted?
What the interviewer says
About 6 percent of the steel bought ends up as pressing scrap, sold back to the mills at a low price.
What would the labor saving need?
What the interviewer says
Automating two manual steps and better shift planning, with about EUR 6 million of one-time spending on machines and severance.
How old is the plant?
What the interviewer says
About 25 years. The main presses were replaced eight years ago.
Constraints
Are there limits on what we can do?
What the interviewer says
No plant closures, and quality and delivery must not suffer. Any change to a part's specification needs the carmaker's approval, which takes about six months.
Exhibits
Exhibit 1
| Cost bucket | Cost (EUR m a year) | Benchmark gap or possible cut (%) |
|---|---|---|
| Materials | 60 | 8 |
| Labor | 30 | 10 |
| Overhead | 10 | 20 |
Exhibit 2
| Material | Spend (EUR m a year) | Number of suppliers |
|---|---|---|
| Steel coil | 40 | 2 |
| Aluminum | 8 | 3 |
| Fasteners and bought-in parts | 7 | 25 |
| Paint and coatings | 5 | 4 |
Source: illustrative client purchasing data.
Solution
Show the solutionHide the solution
Hypothesis
Materials are 60 percent of cost, so my hypothesis is that most of the saving must come from materials, with labor second, and that overhead alone cannot reach the target.
Structure
- Savings by bucket versus the EUR 10 million targetThis comes from total cost = materials + labor + overhead; savings = what each bucket can realistically give, added up against EUR 10 million.
- Key: Materials: price, quantity, specification
- Labor: automation and shift planning
- Overhead: zero-based budgeting
- One-time costs and quality checks
Analysis
1. Can overhead alone do it?
Even a deep 20 percent cut in overhead saves only EUR 2 million, a fifth of the target.
Overhead saving (EUR): 10,000,000 × 0.2 = 2,000,000
2. Materials
Close the 8 percent gap to similar plants through supplier tenders and simpler specifications.
Materials saving (EUR): 60,000,000 × 0.08 = 4,800,000
3. Labor
Close the 10 percent gap through automation of two manual steps and better shift planning.
Labor saving (EUR): 30,000,000 × 0.1 = 3,000,000
4. Add it up
Materials plus labor plus overhead.
Total saving (EUR): 4,800,000 + 3,000,000 + 2,000,000 = 9,800,000
5. One-time cost
Interviewer: "The labor saving needs about EUR 6 million of one-time spending on machines and severance; the materials and overhead savings need little upfront spending."
Payback on labor saving (years): 6,000,000 ÷ 3,000,000 = 2
6. Close the last gap with scrap
The plant buys EUR 40 million of steel a year and scraps about 6 percent of it in pressing. Cutting scrap to 5.5 percent, half a point, closes the last EUR 0.2 million.
Saving from half a point less scrap (EUR): 40,000,000 × 0.005 = 200,000
- Exhibit 1: Materials are 60 percent of cost, so even a modest cut there is worth more than a deep cut in overhead.
- Exhibit 2: Steel is two thirds of the materials bill, and fasteners are spread across 25 suppliers, so both are worth a tender.
Recommendation
The target is reachable, but only with materials at the center. First, an 8 percent materials saving gives EUR 4.8 million and needs little upfront spending, so start there, with steel, which is EUR 40 million of the EUR 60 million. Second, a 10 percent labor saving gives EUR 3 million but needs about EUR 6 million of one-time spending, paid back in about two years. Third, a 20 percent overhead cut gives EUR 2 million, bringing the total to EUR 9.8 million, close to the EUR 10 million target. The last EUR 0.2 million needs only about a third of a point more off materials (0.2 of 60 is about 0.3 percent). Cutting pressing scrap from 6 to 5.5 percent of steel would close it. The move in play is a cost transformation driven by procurement. A car-parts supplier spends most of its cost on materials and faces yearly price cuts from carmakers, so buying better is the lever that keeps margins. Check every specification change with the quality team and the carmaker before it goes ahead.
Risks
- Suppliers may resist price cuts or cut service
- Specification changes could hurt quality if not tested
Next steps
- Run tenders on the ten largest purchased items
- Plan the automation project and its timeline
Strong and weak answers
A strong candidate
Sized the buckets, used benchmarks per bucket, added the savings up against the target, and counted the one-time cost.
A weak candidate
Proposed cutting travel and office costs, which are tiny, and never showed a path to EUR 10 million.
Worked case
Cutting non-medical cost at an Indian hospital group
Case
A private hospital group runs twelve hospitals across India. Rising costs have squeezed its margin, and the board wants INR 40 crore a year of cost out within 18 months (1 crore is 10 million). Doctors, nurses and patient safety are off limits. The chief executive asks where the savings should come from.
Candidate-led: you build the cost tree and ask for the size of each bucket; the interviewer answers and pushes back.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
How big is the group?
What the interviewer says
Twelve multi-specialty hospitals in six cities, with about 3,000 beds in all.
History
Why is the board asking now?
What the interviewer says
Operating margin fell from 18 to 14 percent over two years, as wages and supply prices rose faster than the prices insurers pay.
Objective
Is the target yearly, and by when?
What the interviewer says
INR 40 crore a year, fully in place within 18 months.
Financials
How big is the non-medical cost base?
What the interviewer says
About INR 500 crore a year: consumables and supplies 250, non-clinical staff 180, facilities 70. Total revenue is about INR 2,000 crore.
Market
Can the group raise prices instead?
What the interviewer says
Not much. About 60 percent of revenue comes from insurers and government schemes that pay fixed package prices.
Customers
Would patients notice any of these changes?
What the interviewer says
Not if a clinical committee approves each standard item before it is used.
Competitors
How do rival groups organize this?
What the interviewer says
The two largest national chains buy centrally and run shared billing centers.
Operations
Do the hospitals buy together today?
What the interviewer says
No. Each buys its own supplies, and prices for the same item differ a lot; examples are in the exhibit. Buying as one group could cut prices by about 6 percent.
Could doctors agree on fewer versions of common items?
What the interviewer says
A clinical committee thinks about 4 percent of consumables spend is possible without any effect on care.
What about energy and service contracts?
What the interviewer says
Energy audits and new service contracts could save about 10 percent of facilities cost.
How are billing, HR and IT run?
What the interviewer says
Separately in each hospital. One shared center could save about 5 percent of non-clinical staff cost through natural turnover, and needs about INR 12 crore of new IT.
Is the group building new hospitals?
What the interviewer says
One is under construction and opens in two years. Its costs are outside this exercise.
Constraints
Which costs are in scope?
What the interviewer says
Non-medical costs only. Doctors, nurses and patient safety are out of scope, and there are to be no layoffs this year.
Exhibit
Exhibit 1
| Item | Lowest price paid (INR) | Highest price paid (INR) |
|---|---|---|
| Surgical gloves, box of 100 | 450 | 540 |
| Urinary catheter | 120 | 144 |
| IV cannula | 60 | 72 |
| Wound dressing pack | 85 | 102 |
Source: illustrative client purchasing records, last quarter.
Solution
Show the solutionHide the solution
Hypothesis
Twelve hospitals buying separately usually pay different prices for the same items, so my hypothesis is that purchasing is the biggest lever, with shared back-office services second.
Structure
- Non-medical cost buckets, sized, against the INR 40 crore targetThis comes from total cost = the sum of the cost buckets, with patient care kept out of reach; savings are added up against the INR 40 crore target.
- Key: Consumables and supplies: price and specification
- Non-clinical staff: shared services for billing, HR, and IT
- Facilities: energy and service contracts
- Protected: doctors, nurses, patient safety
Analysis
1. Size the target
Candidate: "How big is the non-medical cost base?" Interviewer: "About INR 500 crore a year: consumables and supplies 250, non-clinical staff 180, facilities 70." Candidate: "So the target is 8 percent of it."
Target as a share of non-medical cost (%): 40 ÷ (250 + 180 + 70) × 100 = 8
2. Consumables: pay less
Candidate: "Do the hospitals pay different prices for the same items?" Interviewer: "Yes. Buying as one group could cut prices by about 6 percent."
Group purchasing saving (INR crore): 250 × 0.06 = 15
3. Consumables: specify smarter
Candidate: "Could the doctors agree on fewer versions of common items, such as gloves and catheters?" Interviewer: "A clinical committee thinks about 4 percent is possible without any effect on care."
Standardization saving (INR crore): 250 × 0.04 = 10
4. Facilities
Interviewer: "Energy audits and new service contracts could save about 10 percent."
Facilities saving (INR crore): 70 × 0.1 = 7
5. Non-clinical staff
Interviewer: "Nurses are our biggest cost. Should we look at them after all?" Candidate: "You put clinical staff out of scope, and I agree with that: nurses drive patient safety and revenue, so I would protect them. For billing, HR, and IT, one shared center for all twelve hospitals could save about 5 percent through natural turnover rather than layoffs."
Shared-services saving (INR crore): 180 × 0.05 = 9
6. Add it up
The four levers together, against the target of 40.
Total saving (INR crore a year): 250 × 0.06 + 250 × 0.04 + 70 × 0.1 + 180 × 0.05 = 41
7. One-time cost
Interviewer: "The shared center needs about INR 12 crore of new IT." Candidate: "That pays back in about 16 months from its own savings."
Payback on shared services (years): 12 ÷ (180 × 0.05) = 1.33
- The exhibit: The dearest hospital pays about 20 percent more than the cheapest for the same item, so buying as one group would cut prices.
Recommendation
The group can save about INR 41 crore a year, just above the target, without touching clinical staff. First, consumables are half the non-medical cost, and buying as one group plus standardizing common items gives INR 25 crore, more than half the target. Second, a shared center for billing, HR, and IT saves about INR 9 crore and pays back its INR 12 crore of IT in about 16 months. Third, energy and service contracts add about INR 7 crore with little risk. The move in play is using the group's scale. Twelve hospitals that buy and bill separately pay for their size without getting its benefits, while insurers' fixed package prices mean the margin must come from cost. Start with group purchasing, which needs no investment, and have every specification change approved by the clinical committee.
Risks
- Doctors may resist standard items they did not choose
- Suppliers may cut service levels when prices fall
- The shared center may disrupt billing during the move
Next steps
- Compare prices for the 100 highest-spend items across the twelve hospitals
- Set up a clinical committee to approve standard items
- Plan the shared center in two waves, billing first
Strong and weak answers
A strong candidate
Sized the cost base first, protected clinical staff with a clear reason, built four levers that add up to the target, and counted the one-time cost.
A weak candidate
Proposed cutting nursing staff by 5 percent because it is the largest cost line, which risks patient safety and revenue.
Prompt: "We need to cut costs; where?"
Weaker answer
Jumps to cutting travel and office perks, which are tiny, and never sizes the real cost drivers.
Stronger answer
Builds a cost tree, sizes the buckets, estimates a saving per bucket from benchmarks, shows a path that adds up to the target, and counts one-time costs.
Why the stronger answer wins: The strong answer goes where the money is and proves the target is reachable. The weak one cuts visible but small costs.
Common mistakes, traps, and curveballs
- Cutting a small bucket for show while the big one is untouched
- Cutting costs that quietly drive revenue
- Across-the-board cuts instead of targeted ones
- Ignoring the one-time cost of making the cut
- Stopping before the savings add up to the target
How firms often vary on this type
Turnaround and private-equity contexts push cost cases hardest, often asking what you would protect even under pressure, to test judgment as well as arithmetic. Formats differ by office and change over time, so check the current process for your target office.
Practice
A company's costs are INR 500 million a year: materials 300, labor 150, overhead 50 (all INR millions). It could cut materials by 5 percent or overhead by 20 percent. How much does the materials cut save, in INR millions?
A UK bakery chain spends GBP 8 million a year on flour. A supplier tender cuts the price by 5 percent, and better planning means it buys 2 percent less flour. What is the yearly saving, in GBP?
Closing a regional office in Dubai costs AED 3 million one time and saves AED 2 million a year. What is the payback, in months?
Quick check
Overhead is 5 percent of total cost. The chief executive wants a 10 percent cut in total cost from overhead alone. What do you say?
Quick check
Cutting the sales team by 10 percent would save money. What must you check before recommending it?
Quick check
The chief executive asks every department to cut 10 percent. What is the main weakness of this approach?
The one thing to remember
Size the buckets, build a path of savings that adds up to the target, and count the one-time cost of every cut.
Next module: Capacity, supply chain, and footprint
Sources
Math checked, facts checked against sources on 16 June 2026.
- Recognized public explanations of case-interview concepts and terms
Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.