Operations and process improvement
Something runs slow or costly; walk the process, compare it with demand, find the real bottleneck, and put a value on fixing it.
17 min
What this case type is and when it shows up
An operations case has a process that is too slow, too costly, or makes too many errors. The skill is to walk the process end to end, find the one step that limits the whole thing (the bottleneck), check that demand is higher than what the process makes today, and fix that step rather than one that only looks broken.
The underlying theory, in plain language
A process can produce no more per hour than its slowest step, the bottleneck. Adding capacity anywhere else does nothing for total output. But first check demand: if customers want fewer units than the bottleneck can make, the limit is demand, not the process.
Once found, you speed up the bottleneck, reduce the work reaching it, or rebalance the steps around it. Then a new bottleneck appears, and you repeat.
Utilization is the work a step does divided by its capacity. Steps close to 100 percent utilization build long queues. Little's Law links queues and time: the average number of items waiting equals the rate at which items leave the queue (in a stable system, the arrival rate) multiplied by the average wait. Turned around, the average wait equals the number of items in the queue divided by the rate at which items leave it.
What the prompts sound like, from simple to hard
- Simple: a coffee shop in Singapore has long lunchtime queues; why.
- Medium: a factory line in Poland runs below target; find the constraint.
- Hard: a hospital discharge process in the UK is slow across several handoffs.
Build the structure from the goal
Three moves that give you the structure
- Start from the decision. What limits output, speed, or quality in this process, and is fixing it worth the cost?
- Write the maths of the goal. Output = the lower of demand and the capacity of the slowest step. Waiting time = items waiting / rate at which they are served. The value of a fix = extra output x contribution per unit (or time saved x its value), minus the cost of the fix.
- Let the business pick the branches. The industry tells you what the steps are and what an hour is worth. In a kitchen or a factory, follow the product from step to step. In a hospital, follow the patient, and safety rules limit what you can change. In a call centre or a bank, follow the request, and staff time is the main cost.
- Wait = people queuing / people screened per hour
- Arrivals per hour at the peak
- Key: Lanes open x people per lane per hour
- Slow steps: trays, bag checks, body scanner
- Fixes: more lanes at the peak, faster tray return
This comes from wait = queue / service rate. Airports know their flight times, so the peak is predictable and the capacity branch gets the detail.
- Appointments a week versus requests a week
- Requests: new patients and follow-ups
- Key: Doctor hours x appointments per hour
- Lost slots: missed appointments
- Follow-ups a nurse or a video call could handle
Same maths, a different process. In a clinic, doctor time is the slowest step, so the branch that frees doctor time leads.
Why a generic structure scores lower
A generic list of people, process, and technology misses the one step that limits output. Interviewers score whether you found that step with numbers.
Crack any case in five movesFinding and narrowing the real problem
Map the steps and their capacities, compare with demand, find the step that limits output, and put a money value on fixing it before proposing any spend.
Names you may hear, kept as questions that fall out of the goal maths
- Process walk: What are the steps, and what is the capacity of each? It falls out of output = the lower of demand and the slowest step. Where it stops helping: Needs the step capacities; without them you are guessing.
- Throughput thinking: Is output limited by demand or by the slowest step? Where it stops helping: Real processes have variation and queues that this simple view ignores.
- Little's Law: Wait time = items in the queue / rate at which items leave it (in a stable system, the arrival rate). Where it stops helping: It gives averages; peaks can be much worse.
Methods for solving this type
- Map the steps and their rates
- Compare with demand
- Identify the slowest step
- Value the lost output and compare with the cost of the fix
- Recheck for the next constraint
The math patterns it relies on
- Units per hour at each step
- Output = lower of demand and the slowest step
- Lost units x contribution x hours x days
- Wait = number waiting / service rate
Bar chart: Steps and capacity on a sandwich line. Values in sandwiches per hour. Prep: 120; Assemble: 60; Wrap: 100; Checkout: 90.
So-what
The whole line can make only 60 an hour because Assemble is the bottleneck. Speeding up Prep or Wrap changes nothing until Assemble improves.
Worked cases
Worked case
Lifting a London sandwich line's output
Case
A sandwich kitchen in London makes fresh sandwiches for its own shops and for office catering. At lunch, demand is about 85 sandwiches an hour over a three-hour peak, and each sandwich earns GBP 3 of contribution. The capacity of each step on the line is in the chart. A second assembly worker would raise the Assemble step to 100 an hour and cost GBP 30,000 a year, and the owner asks whether it is worth it.
Interviewer-led: the interviewer shows the capacity chart and asks for the bottleneck, the value of fixing it, and what limits the line next.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the kitchen make, and for whom?
What the interviewer says
Fresh sandwiches for its own five shops nearby and for office catering orders.
History
When did output become a problem?
What the interviewer says
Last year, when two new office buildings opened nearby. Lunch demand rose from about 60 to about 85 sandwiches an hour.
Objective
What does the owner want?
What the interviewer says
More profit from the lunch peak, without lowering quality.
Financials
What does each sandwich earn?
What the interviewer says
About GBP 3 of contribution.
What would the second assembler cost, and what would it change?
What the interviewer says
GBP 30,000 a year including employer costs. Assemble would rise to 100 sandwiches an hour.
Customers
Is demand higher than what we make today?
What the interviewer says
Yes, about 85 sandwiches an hour at lunch. Customers leave when the queue is long. Demand by hour is in the second exhibit.
Do customers who leave come back later?
What the interviewer says
Mostly not. They buy from the sandwich chains on the same street.
Competitors
Who else serves the area?
What the interviewer says
Two national sandwich chains and a supermarket meal-deal counter, all within 200 meters.
Operations
How long is the peak, and on how many days?
What the interviewer says
About three hours a day, on about 250 working days a year.
What does each step on the line do?
What the interviewer says
Prep slices and portions fillings, Assemble builds the sandwich, Wrap seals and labels it, and Checkout serves the shop customer.
Is there room for a second assembler?
What the interviewer says
Yes. The bench has space for one more person.
Are there any food-safety concerns?
What the interviewer says
No. The kitchen has the top hygiene rating, and the Wrap step checks allergen labels.
Constraints
Is there anything we cannot change?
What the interviewer says
The lease does not allow longer opening hours, and the owner will not shorten the menu.
Exhibit
Exhibit 1
Bar chart: Lunch demand by hour (sandwiches an hour). Values in sandwiches an hour. 11:00 to 12:00: 80; 12:00 to 13:00: 90; 13:00 to 14:00: 85.
Source: illustrative till and order data, average weekday.
Solution
Show the solutionHide the solution
Hypothesis
Assemble is the slowest step, so my hypothesis is that it caps output below demand, and that adding capacity there, and only there, pays for itself.
Structure
- Output equals the lower of demand and the slowest stepThis comes from output = the lower of demand and the slowest step; the value of the fix = the lost sales it recovers minus its cost.
- Find the bottleneck and compare with demand
- Key: Value of the lost sales
- Cost of the fix and the next constraint
Analysis
1. Find the bottleneck
The slowest step is Assemble at 60 an hour, so the line makes 60 an hour, below lunch demand of 85.
Slowest step (sandwiches per hour): min(120; 60; 100; 90) = 60
2. Lost sales per hour
Demand the line cannot serve at peak.
Lost sandwiches per peak hour: 85 - 60 = 25
3. After the fix
With Assemble at 100, the slowest step becomes Checkout at 90, which is above demand of 85. The line can now serve all lunch demand.
Slowest step after the fix (sandwiches per hour): min(120; 100; 100; 90) = 90
4. Value of the fix
25 extra sandwiches an hour at GBP 3 each, for 3 peak hours on 250 days.
Extra contribution (GBP a year): 25 × 3 × 3 × 250 = 56,250
5. Net gain
Minus the GBP 30,000 cost of the second worker.
Net gain (GBP a year): 56,250 - 30,000 = 26,250
- The exhibit: Demand averages 85 an hour across the peak, and the busiest hour reaches 90, the capacity of Checkout.
Recommendation
Add the second assembly worker. First, Assemble caps output at 60 an hour, so about 25 sandwiches an hour of lunch demand are lost. Second, the fix serves all 85 an hour and adds about GBP 56,250 of contribution a year for GBP 30,000 of cost, a net gain of about GBP 26,250. Third, spending on Prep or Wrap would change nothing, because they already have spare capacity. The move in play is removing the bottleneck, and food-service economics make it pay. Lunch demand comes in a short peak, and a customer who leaves the queue buys elsewhere, so lost peak sales never come back. Checkout, at 90 an hour, becomes the next limit if lunch demand grows above 90, which the busiest lunch hour already reaches.
Risks
- Lunch demand may be lower on some days, reducing the gain
- Two assemblers may get in each other's way in a small kitchen
- If demand keeps rising, the 12:00 to 13:00 hour will hit the Checkout limit first
Next steps
- Trial the second assembler for four weeks and measure output at peak
- Plan a second till or pre-paid catering pickup before demand passes 90 an hour
Strong and weak answers
A strong candidate
Checked demand, found the bottleneck, valued the lost sales, compared with the cost of the fix, and named the next constraint.
A weak candidate
Suggested faster prep equipment, which was never the limit, and never put a money value on anything.
Worked case
Why a Johannesburg car-service workshop runs out of time
Case
A chain of eight car-service workshops in Johannesburg is losing customers. Cars booked for a same-day service are often not ready by closing time, and the workshops turn bookings away when the day is full. The owner thinks each workshop needs more service bays. He asks whether to build them, or what else to do.
Candidate-led: you map the process and ask for the numbers; the interviewer answers only what you ask.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does a typical workshop look like?
What the interviewer says
Six service bays, open nine hours a day, doing routine services and minor repairs for most car brands. Start with one typical workshop; the others are similar.
History
When did the problem start?
What the interviewer says
About a year ago, when the main parts supplier moved its warehouse further from the city.
Objective
What does the owner want?
What the interviewer says
To stop losing customers and to add profit. He has set aside about ZAR 2 million per workshop for new bays.
Financials
What does one service earn?
What the interviewer says
About ZAR 1,200 of contribution. The workshops open about 300 days a year.
Customers
How many cars want a service each day?
What the interviewer says
About 24 cars a day at a typical workshop.
What exactly do customers complain about?
What the interviewer says
Long waits, and cars not finished the same day. When the day is full, callers are told to come another day, and many go to a rival.
Competitors
Who are the rivals?
What the interviewer says
Franchised dealer workshops, which charge about 40 percent more, and many small independent garages.
Operations
How long does a service take?
What the interviewer says
About two hours of work.
Do cars ever sit in a bay without being worked on?
What the interviewer says
Yes. Two weeks of bay records are in the exhibit.
Is there space to park cars outside the bays?
What the interviewer says
Yes. A yard behind each workshop holds about ten cars.
What would it cost to move waiting cars and stock more parts?
What the interviewer says
A driver to move cars costs ZAR 180,000 a year. A stock of the 40 most-used parts needs ZAR 250,000 one time.
Are the mechanics well trained?
What the interviewer says
Yes. Staff turnover is low, and all mechanics hold trade certificates.
Constraints
Is there anything the owner will not change?
What the interviewer says
He will not raise prices this year, and any change must work in all eight workshops.
Exhibit
Exhibit 1
| Group of cars | Share of cars (%) | Work time in the bay (hours) | Time waiting for parts in the bay (hours) |
|---|---|---|---|
| Parts already in stock | 70 | 2 | 0 |
| Parts ordered after the car arrives | 30 | 2 | 4 |
Source: illustrative workshop records.
Solution
Show the solutionHide the solution
Hypothesis
A workshop is limited by its service bays, so my hypothesis is that bays are the bottleneck, and that something other than the repair work itself, such as waiting for parts, is using up bay time.
Structure
- Bay capacity versus demand, and what uses up bay timeThis comes from cars served = bays x hours open / hours each car holds a bay, compared with cars arriving.
- Demand: cars arriving per day
- Key: Capacity: bays x hours / hours each car holds a bay
- Repair work
- Key: Waiting for parts in the bay
- Value of recovered capacity and cost of the fix
Analysis
1. Capacity in theory
Candidate: "How many bays, how long is the day, and how long does a service take?" Interviewer: "Six bays, open nine hours, and a service is about two hours of work."
Cars per day in theory: 6 × 9 ÷ 2 = 27
2. Compare with demand
Interviewer: "About 24 cars a day want a service." Candidate: "In theory the bays should cope, at about 89 percent use. So something else is using bay time."
Required utilization in theory (%): 24 ÷ 27 × 100 = 88.89
3. Find the hidden bay time
Candidate: "Do cars ever sit in a bay without being worked on?" Interviewer: "Yes. About 30 percent of cars wait for parts, on average for four hours, and they stay in the bay while they wait."
Average bay hours per car: 2 + 0.3 × 4 = 3.2
4. Real capacity
With each car holding a bay for 3.2 hours on average, the workshop can finish far fewer cars than demand.
Cars per day in practice: 6 × 9 ÷ (2 + 0.3 × 4) = 16.88
5. Cars lost each day
Demand the workshop cannot serve.
Cars turned away per day: 24 - 6 × 9 ÷ (2 + 0.3 × 4) = 7.13
6. Value of the lost work
Interviewer: "Each service earns about ZAR 1,200 of contribution, and we open about 300 days a year."
Lost contribution (ZAR a year): (24 - 16.875) × 1,200 × 300 = 2,565,000
7. Cost of the fix
Candidate: "Instead of building bays, move cars that wait for parts to a parking area and keep the 40 most-used parts in stock." Interviewer: "A driver to move cars costs ZAR 180,000 a year, and the parts stock needs ZAR 250,000 one time."
Net gain in year one (ZAR): 2,565,000 - 180,000 - 250,000 = 2,135,000
- The exhibit: Three cars in ten hold a bay for six hours instead of two, while nobody works on them for four of those hours.
Recommendation
Do not build more bays; free the bays that already exist. First, in theory six bays can service 27 cars a day against demand of 24, so the bays are not too few. Second, cars waiting for parts hold a bay for four hours, which raises average bay time from 2 to 3.2 hours. That cuts real capacity to about 17 cars a day, so about 7 cars a day are turned away. Third, moving waiting cars out of the bays and stocking common parts recovers that capacity for about ZAR 430,000 in year one. Today that lost capacity costs about ZAR 2.6 million a year of contribution. The move in play is freeing existing capacity before buying new capacity. In a workshop the scarce resource is bay hours, so any hour a car sits idle in a bay is lost revenue. New bays would fill with waiting cars too. Pilot the change in one workshop for a month, then roll it out.
Risks
- Moving cars in and out of bays adds some handling time
- Parts that are not stocked will still cause delays
- At about 89 percent use, the bays will still build queues on busy days
Next steps
- Record for two weeks how long each car holds a bay and why
- Agree faster delivery times with the two main parts suppliers
- Pilot the parking area and parts stock in one workshop
Strong and weak answers
A strong candidate
Compared capacity in theory with demand, noticed they did not explain the problem, found the hidden bay time, and valued a cheap fix against an expensive one.
A weak candidate
Agreed with the owner to add two bays at each workshop, which costs far more and leaves cars still waiting for parts in the new bays.
Prompt: "The line is below target; what do we do?"
Weaker answer
Proposes hiring more prep staff and buying faster wrapping machines, neither of which is the limiting step.
Stronger answer
Maps step capacities, compares with demand, names Assemble as the bottleneck, values the lost sales at about GBP 56,000 a year, and points to Checkout as the next constraint.
Why the stronger answer wins: The strong answer targets the constraint that caps output and shows the fix pays. The weak one spends money on steps that do not change total output.
Common mistakes, traps, and curveballs
- Improving a step that is not the bottleneck
- Adding capacity when demand, not the process, is the limit
- Adding capacity everywhere instead of at the constraint
- Ignoring variation and queues
- Cutting a step that catches errors
How firms often vary on this type
Operations cases tend to be quantitative and exhibit-heavy. Expect a capacity table and a clear right answer for the bottleneck, which rewards careful reading. Formats differ by office and change over time, so check the current process for your target office.
Practice
An airport security line in Dubai has 600 people waiting and screens 1,200 people an hour. About how long is the wait, in minutes?
A clinic in Riyadh sees 90 patients a day. It has 4 doctors, and each can see 25 patients a day. What is the utilization of the doctors, in percent?
A Singapore bank completes 200 loan files a day and has 1,400 files in progress. On average, how many days does a file spend in the process?
Quick check
Three steps have capacities of 50, 40, and 70 units an hour. Demand is 35 units an hour. What limits output?
Quick check
Demand is above capacity. You double the speed of a step that is not the bottleneck. What happens to output?
Quick check
A step runs at 98 percent utilization. What should you expect?
The one thing to remember
Output is the lower of demand and the slowest step. Fix only the step that limits output, and only if the value of the extra output beats the cost.
Next module: Cost reduction and cost cutting
Sources
Math checked, facts checked against sources on 16 June 2026.
- Recognized public explanations of case-interview concepts and terms
Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.