A sandwich kitchen in London makes fresh sandwiches for its own shops and for office catering. At lunch, demand is about 85 sandwiches an hour over a three-hour peak, and each sandwich earns GBP 3 of contribution. The capacity of each step on the line is in the chart. A second assembly worker would raise the Assemble step to 100 an hour and cost GBP 30,000 a year, and the owner asks whether it is worth it.
Interviewer-led: the interviewer shows the capacity chart and asks for the bottleneck, the value of fixing it, and what limits the line next.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the kitchen make, and for whom?
What the interviewer says
Fresh sandwiches for its own five shops nearby and for office catering orders.
History
When did output become a problem?
What the interviewer says
Last year, when two new office buildings opened nearby. Lunch demand rose from about 60 to about 85 sandwiches an hour.
Objective
What does the owner want?
What the interviewer says
More profit from the lunch peak, without lowering quality.
Financials
What does each sandwich earn?
What the interviewer says
About GBP 3 of contribution.
What would the second assembler cost, and what would it change?
What the interviewer says
GBP 30,000 a year including employer costs. Assemble would rise to 100 sandwiches an hour.
Customers
Is demand higher than what we make today?
What the interviewer says
Yes, about 85 sandwiches an hour at lunch. Customers leave when the queue is long. Demand by hour is in the second exhibit.
Do customers who leave come back later?
What the interviewer says
Mostly not. They buy from the sandwich chains on the same street.
Competitors
Who else serves the area?
What the interviewer says
Two national sandwich chains and a supermarket meal-deal counter, all within 200 meters.
Operations
How long is the peak, and on how many days?
What the interviewer says
About three hours a day, on about 250 working days a year.
What does each step on the line do?
What the interviewer says
Prep slices and portions fillings, Assemble builds the sandwich, Wrap seals and labels it, and Checkout serves the shop customer.
Is there room for a second assembler?
What the interviewer says
Yes. The bench has space for one more person.
Are there any food-safety concerns?
What the interviewer says
No. The kitchen has the top hygiene rating, and the Wrap step checks allergen labels.
Constraints
Is there anything we cannot change?
What the interviewer says
The lease does not allow longer opening hours, and the owner will not shorten the menu.
Exhibits
Exhibit 1
Bar chart: Steps and capacity on a sandwich line. Values in sandwiches per hour. Prep: 120; Assemble: 60; Wrap: 100; Checkout: 90.
Exhibit 2
Bar chart: Lunch demand by hour (sandwiches an hour). Values in sandwiches an hour. 11:00 to 12:00: 80; 12:00 to 13:00: 90; 13:00 to 14:00: 85.
Source: illustrative till and order data, average weekday.
Solution
Show the solutionHide the solution
Hypothesis
Assemble is the slowest step, so my hypothesis is that it caps output below demand, and that adding capacity there, and only there, pays for itself.
Structure
- Output equals the lower of demand and the slowest stepThis comes from output = the lower of demand and the slowest step; the value of the fix = the lost sales it recovers minus its cost.
- Find the bottleneck and compare with demand
- Key: Value of the lost sales
- Cost of the fix and the next constraint
Analysis
1. Find the bottleneck
The slowest step is Assemble at 60 an hour, so the line makes 60 an hour, below lunch demand of 85.
Slowest step (sandwiches per hour): min(120; 60; 100; 90) = 60
2. Lost sales per hour
Demand the line cannot serve at peak.
Lost sandwiches per peak hour: 85 - 60 = 25
3. After the fix
With Assemble at 100, the slowest step becomes Checkout at 90, which is above demand of 85. The line can now serve all lunch demand.
Slowest step after the fix (sandwiches per hour): min(120; 100; 100; 90) = 90
4. Value of the fix
25 extra sandwiches an hour at GBP 3 each, for 3 peak hours on 250 days.
Extra contribution (GBP a year): 25 × 3 × 3 × 250 = 56,250
5. Net gain
Minus the GBP 30,000 cost of the second worker.
Net gain (GBP a year): 56,250 - 30,000 = 26,250
- Exhibit 1: The whole line can make only 60 an hour because Assemble is the bottleneck. Speeding up Prep or Wrap changes nothing until Assemble improves.
- Exhibit 2: Demand averages 85 an hour across the peak, and the busiest hour reaches 90, the capacity of Checkout.
Recommendation
Add the second assembly worker. First, Assemble caps output at 60 an hour, so about 25 sandwiches an hour of lunch demand are lost. Second, the fix serves all 85 an hour and adds about GBP 56,250 of contribution a year for GBP 30,000 of cost, a net gain of about GBP 26,250. Third, spending on Prep or Wrap would change nothing, because they already have spare capacity. The move in play is removing the bottleneck, and food-service economics make it pay. Lunch demand comes in a short peak, and a customer who leaves the queue buys elsewhere, so lost peak sales never come back. Checkout, at 90 an hour, becomes the next limit if lunch demand grows above 90, which the busiest lunch hour already reaches.
Risks
- Lunch demand may be lower on some days, reducing the gain
- Two assemblers may get in each other's way in a small kitchen
- If demand keeps rising, the 12:00 to 13:00 hour will hit the Checkout limit first
Next steps
- Trial the second assembler for four weeks and measure output at peak
- Plan a second till or pre-paid catering pickup before demand passes 90 an hour
Strong and weak answers
A strong candidate
Checked demand, found the bottleneck, valued the lost sales, compared with the cost of the fix, and named the next constraint.
A weak candidate
Suggested faster prep equipment, which was never the limit, and never put a money value on anything.