Companies make electricity from gas, coal, nuclear, sun, wind and water, carry it over wires to homes and businesses, and bill customers for it.

42 min read

Overview

The power industry makes electricity from gas, coal, nuclear, water, sun and wind, carries it over high-voltage and local wires, and bills homes, shops, factories and data centers for it. Electricity is hard to store, so supply must match demand every second, and the whole industry is built around that fact. The world used about 31,700 TWh of electricity in 2025, and renewables supplied about a third of it. Each part earns money differently: thermal plants are fuel businesses, solar and wind farms are financing businesses, and grids are regulated monopolies.

How big it is

The sub-industries

  1. 1.Thermal and nuclear generation
  2. 2.Solar, wind and hydro generation
  3. 3.Battery and grid storage
  4. 4.Transmission grids and system operators
  5. 5.Distribution networks
  6. 6.Retail energy supply
  7. 7.Solar, wind and grid equipment manufacturing

Equipment makers and fuel suppliers feed generators, which turn fuel, sun or wind into power and sell it into a wholesale market or under long contracts. Batteries shift that power from cheap hours to dear ones. Transmission grids carry it long distances and keep the system balanced, distribution networks bring it to each meter, and retailers buy it, bill customers and collect the money.

How it works

Follow the product from raw inputs to the customer. Each step says what happens, what goes in and out, who does it, and how much margin it keeps.

  1. Fuel and equipment supply

    Margin varies

    Miners and gas producers supply coal, gas and uranium; factories make solar panels, wind turbines, batteries, transformers and cables.

    Inputs in
    Gas, coal and uranium, Polysilicon, steel, copper and lithium, Factory labor and power
    Outputs out
    Fuel delivered to plants, Panels, turbines, batteries and grid equipment
    Who does it
    Gas suppliers and LNG sellers; LONGi and Jinko Solar (panels), Vestas and Goldwind (turbines), CATL (batteries), Siemens Energy and Hitachi Energy (grid gear).
    Value added
    Turns raw materials into the machines and fuel that make power. Most solar panels and much battery equipment are made in China, which keeps prices low.
  2. Project development

    Medium margin

    Developers find land, measure sun and wind, win permits, secure a grid connection and a buyer, and raise money.

    Inputs in
    Land rights, Permits, Grid connection offer, Equity and debt
    Outputs out
    A shovel-ready project with a contract
    Who does it
    ACWA Power, Masdar, Adani Green, Iberdrola, Engie, many smaller developers.
    Value added
    Turns a field into a bankable project. The grid connection and the contract are often worth more than the land itself.
  3. Construction

    Thin margin

    Contractors install panels, turbines, substations and lines, or build gas, hydro and nuclear plants.

    Inputs in
    Equipment, Construction labor, Cranes and vessels, Project finance
    Outputs out
    A working plant
    Who does it
    Engineering, procurement and construction firms such as Larsen and Toubro, Sterling and Wilson, PowerChina.
    Value added
    Delivers the plant on time and budget; delays add interest and lost sales.
  4. Generation

    Fat margin

    Plants turn fuel, sun, wind or falling water into electricity and feed it into the grid.

    Inputs in
    Fuel (for thermal plants), Operators and maintenance, Capital already spent
    Outputs out
    Electricity in MWh, Capacity and grid services
    Who does it
    NTPC, EDF, Enel, RWE, NextEra, independent power producers such as ACWA Power.
    Value added
    Produces the energy itself; the cheapest plants keep the gap between their cost and the market price.
  5. Storage

    Margin varies

    Batteries and pumped hydro charge when power is cheap and discharge when it is dear, and help keep the grid stable.

    Inputs in
    Battery packs and inverters, Cheap off-peak power, Grid connection
    Outputs out
    Power at peak hours, Frequency and reserve services
    Who does it
    Utilities and developers, Tesla Energy, Masdar.
    Value added
    Moves noon solar into the evening peak, when it is worth much more.
  6. Transmission

    Medium margin

    High-voltage lines carry power over long distances, and the system operator balances supply and demand every second.

    Inputs in
    Lines, towers and substations, Control rooms, Allowed revenue from the regulator
    Outputs out
    Bulk power delivered to regions
    Who does it
    National Grid (UK), Power Grid Corporation of India, State Grid Corporation of China, TenneT.
    Value added
    Connects far-away plants to cities and keeps the lights on.
  7. Distribution

    Medium margin

    Lower-voltage wires, transformers and meters carry power to each home and business.

    Inputs in
    Local networks and meters, Field crews, Allowed tariffs
    Outputs out
    Power at the meter
    Who does it
    E.ON networks, state DISCOMs in India, Kenya Power, Tata Power distribution.
    Value added
    The last mile: without it, bulk power has no customer.
  8. Retail supply

    Thin margin

    Suppliers buy power, sell it on tariffs, read meters, bill customers and collect payment.

    Inputs in
    Wholesale power, Network access, Billing systems and call centers
    Outputs out
    Tariffs and bills, Customer service
    Who does it
    Octopus Energy, British Gas, E.ON, DEWA, Meralco, state DISCOMs.
    Value added
    Packages power into a simple price and handles the customer.

Value built step by step

How the price of one unit grows as it passes each step, and who gets each slice.

Illustrative, rounded figures. One unit: one MWh used by a household in Great Britain, about four months of a typical home's electricity.

Value built step by step: One MWh used by a household in Great Britain, about four months of a typical home's electricity
StagePrice outValue addedWhere it goes
1. Fuel and equipment suppliersGBP 45+GBP 45Gas for thermal plants, and the share of panels and turbines paid for in each MWh.
2. Generation, sold into the wholesale marketGBP 115+GBP 70Plant capital and interest, operations, carbon costs, and the generator's profit.
3. TransmissionGBP 130+GBP 15High-voltage lines and the system operator, paid through regulated charges.
4. DistributionGBP 180+GBP 50Local wires, substations and meters, and a regulated return to the network owner.
5. Retail supplyGBP 228+GBP 48Billing, call centers, bad debt, hedging costs, and a small supplier profit.
6. Policy costs and VATGBP 250+GBP 22Support for clean energy, help for poorer households, and tax.

Each step's share of the final price (GBP 250)

  1. 1. Fuel and equipment suppliers18%
  2. 2. Generation, sold into the wholesale market28%
  3. 3. Transmission6%
  4. 4. Distribution20%
  5. 5. Retail supply19%
  6. 6. Policy costs and VAT8.8%

So what: Wholesale power is a bit under half the bill and networks about a quarter, close to the shares in Britain's price cap. The steady profit sits with the network owners and with low-cost generators; the retailer handles the customer but keeps under 3 percent of the bill.

Inputs and outputs

Key inputs

The main costs and materials, and their weight in total cost.

Key inputs
InputWhat it is forShare of cost
Capital for plants and gridsBuilding solar, wind, gas, hydro and nuclear plants, lines and substations.Most of the cost of a solar or wind MWh, often 60 to 80 percent
Cost of capitalThe return lenders and owners demand. For solar and wind it is the biggest driver of cost per MWh.IRENA's 2024 assumptions ranged from about 3.8 percent in Europe to 12 percent in Africa(source 2)
Natural gas and LNGFuel for gas plants, which often set the wholesale price.About 50 to 70 percent of a gas plant's cost per MWh(source 12)
CoalFuel for coal plants, still about a third of world electricity in 2025.About 50 to 70 percent of a coal plant's cost per MWh(source 8)
Solar panels and wind turbinesThe main equipment in renewable plants.Installed costs averaged about USD 690 per kW for solar and USD 1,040 per kW for onshore wind in 2024(source 2)
BatteriesStoring power for evening peaks and grid services.Stationary storage packs averaged about USD 70 per kWh in 2025(source 10)
Copper, aluminum and transformersLines, cables and substations.A large share of grid capital; transformers have long waiting times
Carbon allowancesPaying for emissions where carbon is priced, such as the EU.Often 15 to 30 percent of a European gas plant's cost per MWh
Skilled field crewsRunning plants, fixing lines and reading meters.About 5 to 15 percent of operating cost

Outputs

What the industry produces, by-products included.

  • Electricity (MWh) for homes, businesses and industry
  • Capacity: being ready to run at peak times
  • Grid services such as frequency response and reserves
  • Renewable energy certificates and guarantees of origin
  • Heat and steam from combined heat and power plants
  • By-products such as fly ash used in cement, and spent nuclear fuel to manage

Business models

The ways companies here make money.

Business models
ModelHow it earnsExamplesTypical margin
Merchant generatorSells power into the wholesale market at the hourly price, where the last plant needed sets the price for everyone.RWE, Uniper, Constellation, many gas plants in Europe and the United StatesAbout 21 percent operating margin for US power generators in January 2026 data, swinging with fuel and power prices
Contracted independent power producerBuilds a plant and sells all its output under a 15 to 25 year power purchase agreement, often won in a tender.ACWA Power, Masdar, Adani Green, ReNewAbout 20 percent operating margin for US renewable companies; high but on heavy debt
Regulated networkEarns a return set by the regulator on the value of its grid (the regulated asset base), plus allowed running costs.National Grid, Power Grid Corporation of India, TenneT, State GridSteady; allowed returns on equity of about 5.7 percent after inflation in British electricity transmission for 2026 to 2031
Vertically integrated utilityOwns generation, grids and retail in one area, with tariffs set by a regulator or government.Duke Energy, Saudi Electricity Company, Tenaga Nasional, EskomAbout 23 percent operating margin for US general utilities
Retail supplierBuys power wholesale and sells it on tariffs, earning the gap after network, policy and service costs.Octopus Energy, British Gas, MeralcoUnder 3 percent of a household bill in Britain's price cap
Equipment makerSells panels, turbines, inverters, batteries and grid gear per unit or per project, plus service contracts.LONGi, Vestas, Siemens Energy, Sungrow, CATLThin in solar panels during gluts; better in grid equipment and long service contracts

Business model patterns: regulated return, fill the assets, project based, commodity. Spot the pattern in a new industry and you already know the first questions to ask.

Revenue and profit

What drives revenue

Wholesale power price
Where gas plants set the price, dearer gas lifts the price every plant receives, which raised costs in 2026 after the LNG shock.
Capacity factor
The same plant earns more when it runs more hours. New solar averaged about 17 percent and onshore wind about 34 percent in 2024.
Contract price
A PPA or tender price fixes revenue per MWh for decades, so the winning bid sets the plant's fortunes.
Timing of output
Power at the evening peak is worth more than power at sunny noon, when solar floods the market.
Regulated asset base growth
Grid revenue rises as the approved network grows, so network owners want approval for more investment.
Demand growth
Data centers, electric cars, heat pumps and air conditioning add demand, about 849 TWh worldwide in 2025.
Capacity and grid service payments
Plants and batteries are paid for being ready and for stabilizing frequency, apart from energy sold.
Collection rate
Retailers and distributors only earn what they collect; theft and unpaid bills cut revenue, especially in India and Africa.

What drives profit

Cost of capital
Because solar and wind costs are mostly upfront, a lower interest rate can cut the cost per MWh by about a third.
Fuel and carbon cost (thermal plants)
A gas plant's margin is the power price minus fuel and carbon; when gas jumps faster than power, the margin shrinks.
Position in the merit order
Plants with low running cost run first and earn the gap to the price set by the last plant needed.
Curtailment
Solar or wind switched off because the grid is full earns nothing, while its costs continue.
Allowed return set by the regulator
For grids, profit follows the return the regulator allows and how well the company beats its cost targets.
Network losses and theft
Power lost or stolen is paid for but never billed. India's AT&C losses were about 16 percent in the year to March 2025.
Availability and maintenance
A plant that is down at peak hours misses the best prices and may pay penalties.
Hedging
Retailers that buy power ahead at fixed prices avoid losses when wholesale prices spike.

How costs divide

For a typical company, as a share of revenue.

Costs as a share of revenue
Cost lineShare of revenue
Wholesale energy (share of a British household bill)About 44 to 47 percent(source 3)
Networks (transmission and distribution)About 24 to 25 percent(source 3)
Supplier operating costs, bad debt and industry costsAbout 17 percent(source 3)
Policy costsAbout 6 percent(source 3)
Supplier profit before interest and taxAbout 2.6 to 2.7 percent(source 3)
VAT0 to 5 percent (zero on electricity from October 2026 to March 2027)(source 3)

Worked example: one unit

  1. Start with the revenue

    One MWh from a new utility-scale solar plant: USD 50 comes in.

    Contract price for one MWh

  2. Take away the unit's own costs

    4 costs take USD 36, 72% of revenue.

    The biggest: debt repayment and interest on the build cost (lenders funded most of it), at 48%.

  3. See what is left

    USD 14 is left, 28% of revenue. This is the unit's contribution.

See the numbers
The unit: One MWh from a new utility-scale solar plant, sold under a 20-year power purchase agreement at USD 50. Illustrative, rounded figures.
LineAmountShare
Contract price for one MWhUSD 50100%
Minus Debt repayment and interest on the build cost (lenders funded most of it)USD 2448%
Minus Operation and maintenance: cleaning, repairs, monitoringUSD 612%
Minus Land lease, insurance and grid chargesUSD 48%
Minus TaxUSD 24%
What is left (contribution)USD 1428%

Check: USD 50 minus USD 36 of costs leaves USD 14.

So what: About USD 14 of each MWh is left for the equity investors, and the biggest cost is not fuel but repaying the money used to build. So the lever is the cost of capital and the capacity factor: the same plant can cost about a third more per MWh where investors demand a higher return.

Who keeps the profit

The steady profit sits in the regulated grids, which earn an allowed return on a large and growing network, and in low-cost generation with a reliable contract or a good place in the merit order. Retail supply keeps a thin slice. Much new value is created early, by whoever secures the site, the grid connection and cheap financing; panel makers, squeezed by oversupply, often earn little.

What wins

Selling points

What lets the best companies win customers.

Cheap capital
Developers backed by states or strong balance sheets, such as Masdar and ACWA Power, borrow cheaply, so they can bid lower tariffs and still earn their return.
Grid connections in hand
Connection queues are often the slowest step; a developer with approved connections can build years before rivals.
Best sun and wind sites
Gulf and Indian deserts give solar higher output per panel, cutting the cost per MWh.(source 2)
Hybrid plants that deliver around the clock
Pairing solar with batteries, as in Abu Dhabi's 5.2 GW solar and 19 GWh battery project, sells firm power worth more than daytime power.(source 11)
Operating skill
High availability and low maintenance cost add margin on every MWh over a 25 year life.
Customer service and digital billing in retail
Suppliers such as Octopus Energy grew by running billing on their own software at lower cost per customer.

Moats

Defences that keep competitors out for years.

Natural monopoly of grids
Nobody builds a second set of wires to the same street, so the network owner keeps its customers as long as it keeps its licence.
Long contracts
Power purchase agreements of 15 to 25 years lock in revenue long after the tender.
Scarce sites and permits
Hydro dams, nuclear sites and good onshore wind sites are limited and hard to permit again.
Scale in manufacturing
Chinese panel and battery makers produce at a scale that keeps their cost per unit far below newcomers.
Regulatory relationships and track record
States pick bidders with records of delivering on time, which favors established developers in tenders.

SWOT

Strengths and weaknesses of the industry today, and the opportunities and threats ahead.

Strengths

  • Essential service with demand that grows with population, cooling, data centers and electric cars.
  • Solar and onshore wind are now the cheapest new power in most places.
  • Regulated grids earn steady, inflation-linked returns.
  • Long contracts make renewable cash flows predictable and easy to finance.
  • Renewables passed coal as the largest source of world electricity in 2025.

Weaknesses

  • Very high capital needs and long build times for grids and large plants.
  • Solar and wind depend on weather, so they need storage, backup or flexible demand.
  • Grid connection queues and permits slow new projects in many countries.
  • Many state distributors in India and Africa lose money on theft, unpaid bills and tariffs below cost.
  • Retail margins are thin and exposed to sudden wholesale spikes.

Opportunities

  • Data center demand, which the IEA expects to more than double by 2030.
  • Batteries, now cheap enough to pair with solar at scale.
  • Grid upgrades, with Britain alone expecting over GBP 70 billion in five years from April 2026.
  • Universal access in Africa, where the World Bank's Mission 300 had connected over 50 million people by mid 2026.
  • Green hydrogen and electrified industry in the Gulf and India.

Threats

  • Gas price shocks, such as the 2026 LNG disruption, that raise power prices and political pressure.
  • Falling midday prices that cut the value of solar output where too much is built.
  • Higher interest rates that raise the cost of new renewables.
  • Supply chain dependence on China for panels and batteries, and trade tariffs on them.
  • Extreme weather damaging lines and plants, and droughts cutting hydro output.

Rules and risks

Rules that shape the money

  • Price caps on household bills: in Great Britain the regulator sets a cap that allows suppliers a profit of about 2.6 to 2.7 percent, and VAT on electricity is zero from October 2026 to March 2027.(source 3)
  • Regulated grid returns: for April 2026 to March 2031 Britain allowed electricity transmission owners a return on equity of about 5.7 percent a year after inflation.(source 5)
  • Clean energy targets: India aims for 500 GW of non-fossil capacity by 2030 and runs tenders for solar, wind and hybrid power.(source 7)
  • Loss reduction programs: India cut aggregate technical and commercial losses from about 22 percent in the year to March 2021 to about 16 percent in the year to March 2025.(source 6)
  • Market design: Europe and parts of the United States run liberalized wholesale markets; the Gulf and many Asian and African countries use a single state buyer that signs long contracts.
  • Carbon pricing such as the EU Emissions Trading System adds a cost to every MWh from coal and gas plants.

Cycles and risks

  • Gas price shocks pass into power prices: the wholesale share of Britain's price cap rose to about 47 percent for October to December 2026 after the Gulf disruption.(source 3)
  • LNG supply breaks: QatarEnergy's force majeure in 2026 lifted LNG prices in Europe and Asia to near their highest since late 2022.(source 12)
  • Price cannibalization: in the EU, wind and solar made about 30 percent of power in 2025, and on sunny, windy hours prices fall, sometimes below zero, which cuts what solar earns.(source 9)
  • Weather: a dry year cuts hydro output, a calm winter cuts wind, and heat waves push demand to new peaks.
  • Interest rates: because renewables are paid for upfront, a rise in rates raises their cost per MWh and can make tender bids unprofitable.(source 2)
  • Political risk: tariffs and subsidies are set by governments, and bills are sensitive before elections.

Sub-industries

Each one broken down the same way. Open the ones you need.

Thermal and nuclear generationPower plants that burn gas or coal, or split uranium, to boil water and spin turbines.

Thermal and nuclear generation: How it differs

Thermal plants can run whenever they are needed, so they are paid for being reliable as well as for energy. Gas and coal plants are fuel businesses whose margin is the power price minus fuel and carbon; nuclear plants cost a lot to build but very little to run.

Thermal and nuclear generation: Customers

Wholesale markets, single state buyers, and utilities that need power at any hour, plus system operators that pay for capacity.

Thermal and nuclear generation: Supply chain

  1. Fuel supply

    Margin varies

    Gas arrives by pipe or as LNG, coal by rail or ship, uranium as fuel assemblies.

    Inputs in
    Gas or LNG contracts, Coal from mines, Enriched uranium
    Outputs out
    Fuel at the plant
    Who does it
    QatarEnergy, Coal India, Glencore, Cameco, Kazatomprom.
    Value added
    Reliable fuel lets the plant run when needed.
  2. Power generation

    Medium margin

    Fuel heat makes steam or hot gas that spins turbines connected to generators.

    Inputs in
    Fuel, Operators, Turbines and boilers
    Outputs out
    Electricity, Heat and steam in some plants
    Who does it
    NTPC, EDF, Uniper, Saudi Electricity Company, Huaneng.
    Value added
    Firm power available day and night.
  3. Sale and dispatch

    Medium margin

    The system operator calls plants in order of running cost; output is sold hour by hour or under contract.

    Inputs in
    Market bids, Grid connection
    Outputs out
    Energy sold, Capacity payments
    Who does it
    Plant traders, system operators.
    Value added
    Matches output to the hours when it is worth most.

Thermal and nuclear generation: Business models

Thermal and nuclear generation: business models
ModelHow it earnsExamplesTypical margin
Merchant gas plantEarns the clean spark spread: power price minus gas and carbon costs, plus capacity payments.Uniper, RWE, CalpineSwings from losses to high margins with gas and power prices
Contracted or regulated thermal plantPaid a fixed capacity charge for being available plus an energy charge that passes fuel cost through.NTPC, independent power producers in the Gulf and Southeast AsiaSteady; set by the contract

Thermal and nuclear generation: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one MWh from a gas power plant in Europe, sold at the wholesale price.

Thermal and nuclear generation: one unit, revenue, costs and profit
LineAmountShare of revenue
Wholesale power priceEUR 110100%
Minus Gas burnedEUR 6055%
Minus Carbon allowancesEUR 2523%
Minus Operations and maintenanceEUR 54.5%
Minus Capital recovery and interestEUR 109.1%
ProfitEUR 109.1%

Check: EUR 110 minus EUR 100 of costs leaves EUR 10.

So what: Fuel and carbon are over three quarters of the cost. If gas rises EUR 10 and the power price does not follow, profit is wiped out, so the plant lives on the spread, not on the price.

Thermal and nuclear generation: How costs divide

Thermal and nuclear generation: costs as a share of revenue
Cost lineShare of revenue
Fuel50 to 70 percent of revenue for gas and coal plants
Carbon allowances (where priced)10 to 25 percent
Operations and maintenance5 to 10 percent
Capital recovery and interest10 to 20 percent, much higher for nuclear

Thermal and nuclear generation: What drives revenue

Power price at the hours it runs
Thermal plants earn most in evening peaks and low-wind periods.
Running hours
More solar and wind cut the hours gas plants run in many markets.
Capacity payments
Being ready at peak earns money even with few running hours.

Thermal and nuclear generation: What drives profit

Heat rate
A more efficient plant burns less fuel per MWh, so it earns a wider spread.
Fuel contracts
Cheap long-term gas or coal protects the margin when spot prices jump.
Carbon price
Coal emits about twice the carbon of gas per MWh, so a higher carbon price favors gas.

Thermal and nuclear generation: Key inputs and outputs

Thermal and nuclear generation: key inputs
InputWhat it is forShare of cost
Natural gas or coalFuel50 to 70 percent
Carbon allowancesEmissions where priced10 to 25 percent in the EU
Turbines and spare partsRunning and overhauls5 to 10 percent

Outputs: Electricity at any hour; Capacity and reserve services; Heat and steam in combined heat and power plants.

Thermal and nuclear generation: Selling points

Dispatchable output
Can run when the sun sets and the wind drops, which grids still need.
Efficient modern plants
Newer combined cycle plants burn much less gas per MWh than old ones, so they run first.

Thermal and nuclear generation: Moats

Sites with grid and fuel access
Existing plant sites have connections, water and fuel lines that new sites lack.
Capacity contracts
Multi-year capacity agreements pay plants that are hard to replace quickly.

Thermal and nuclear generation: SWOT

Thermal and nuclear generation: Strengths

  • Firm power any hour
  • Existing sites and connections
  • Nuclear has very low running cost and no carbon

Thermal and nuclear generation: Weaknesses

  • Exposed to fuel and carbon prices
  • Fewer running hours as renewables grow
  • Coal and gas emit carbon

Thermal and nuclear generation: Opportunities

  • Backup for data centers and growing peaks
  • Nuclear life extensions and new small reactors
  • Gas replacing coal in Asia

Thermal and nuclear generation: Threats

  • Gas price spikes, as in 2026
  • Batteries taking evening peak hours
  • Coal phase-out rules

Thermal and nuclear generation: Key measures

Heat rate
Fuel burned per MWh madeTypical: Modern combined cycle gas plants are far more efficient than old coal units
Availability
Share of time the plant is ready to runTypical: Often 85 to 95 percent
Clean spark spread
Power price minus gas and carbon cost per MWhTypical: Swings from negative to tens of euros

Thermal and nuclear generation: Margin and capital

Typical margin
About 21 percent operating margin for US generators in January 2026 data, swinging with fuel prices
Capital intensity
Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.

Thermal and nuclear generation: Players

NTPC (India), EDF (France), Uniper (Germany), Saudi Electricity Company, Huaneng (China), Constellation (United States), Eskom (South Africa).

Thermal and nuclear generation: How it comes up in a case

  • Our gas power plant runs fewer hours every year. Keep it, convert it, or close it? Value its capacity payments and peak hours.
  • Should a country extend the life of its nuclear plants? Compare cost per MWh with new solar plus batteries.
Solar, wind and hydro generationCompanies that build and run solar farms, wind farms and dams, and sell the power they make.

Solar, wind and hydro generation: How it differs

Renewable plants have no fuel bill; almost all their cost is paid before they make any power. So they are really financing businesses: the cost of capital and the hours of sun or wind decide the cost per MWh, and a long contract decides the price.

Solar, wind and hydro generation: Customers

State single buyers, utilities, and companies such as data center owners that sign long power purchase agreements.

Solar, wind and hydro generation: Supply chain

  1. Development

    Medium margin

    Developers secure land, resource data, permits, a grid connection and a buyer.

    Inputs in
    Land, Wind and sun measurements, Permits, Grid connection
    Outputs out
    A bankable project
    Who does it
    ACWA Power, Masdar, Adani Green, Iberdrola, Orsted.
    Value added
    Creates most of the value early: a project with a contract and a connection sells for well above its costs so far.
  2. Financing and construction

    Thin margin

    Lenders fund most of the build; contractors install panels or turbines.

    Inputs in
    Project debt and equity, Panels, turbines and inverters, Construction crews
    Outputs out
    A working plant
    Who does it
    Banks and development lenders; contractors such as Sterling and Wilson and PowerChina.
    Value added
    Turns a contract into a cash-producing asset.
  3. Operation

    Fat margin

    Teams clean panels, fix turbines, monitor output and sell the power.

    Inputs in
    Maintenance crews, Spare parts, Monitoring software
    Outputs out
    Electricity, Renewable energy certificates
    Who does it
    Owners and service firms such as Vestas service teams.
    Value added
    Keeps output high for 25 years or more.

Solar, wind and hydro generation: Business models

Solar, wind and hydro generation: business models
ModelHow it earnsExamplesTypical margin
Contracted renewable producerSells all output under a 15 to 25 year PPA at a fixed price per MWh.ACWA Power, ReNew, MasdarAbout 20 percent operating margin for US renewable companies; EBITDA margins often much higher
Develop and sellDevelops projects and sells them, or a stake, to investors once contracted or built.Many European developers, Brookfield buyersLumpy; gains on each sale

Solar, wind and hydro generation: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one MWh from a new utility-scale solar plant, sold under a 20 year contract at USD 50.

Solar, wind and hydro generation: one unit, revenue, costs and profit
LineAmountShare of revenue
Contract price for one MWhUSD 50100%
Minus Debt repayment and interest on the build costUSD 2448%
Minus Operation and maintenanceUSD 612%
Minus Land lease, insurance and grid chargesUSD 48%
Minus TaxUSD 24%
ProfitUSD 1428%

Check: USD 50 minus USD 36 of costs leaves USD 14.

So what: About USD 14 is left for the owners, and the biggest cost is repaying the money used to build. The same plant can cost about a third more per MWh where investors demand a higher return.

Solar, wind and hydro generation: How costs divide

Solar, wind and hydro generation: costs as a share of revenue
Cost lineShare of revenue
Debt service (capital and interest)40 to 60 percent of revenue
Operation and maintenance10 to 15 percent
Land, insurance and grid charges5 to 10 percent
Tax3 to 8 percent

Solar, wind and hydro generation: What drives revenue

Contract price
The PPA or tender tariff fixes revenue per MWh.
Capacity factor
More sun or wind hours mean more MWh from the same plant; about 17 percent for new solar and 34 percent for onshore wind in 2024.
Curtailment
Output switched off for grid limits earns nothing unless the contract pays for it.

Solar, wind and hydro generation: What drives profit

Cost of capital
A lower interest rate cuts the largest cost line directly.
Installed cost per kW
Cheaper panels and turbines lower debt for life.
Availability
Every hour a turbine is down loses output with no cost saving.

Solar, wind and hydro generation: Key inputs and outputs

Solar, wind and hydro generation: key inputs
InputWhat it is forShare of cost
Panels or turbinesMain equipmentAbout half of installed cost(source 2)
Project debtFunding most of the buildOften 70 to 80 percent of funding
Land and grid connectionSite and export route5 to 15 percent of project cost

Outputs: Electricity; Renewable energy certificates; Firm power when paired with batteries.

Solar, wind and hydro generation: Selling points

Lowest cost new power
Global average LCOE for new solar was about USD 43 per MWh and onshore wind about USD 34 in 2024.(source 2)
Strong sun or wind
Desert solar in the Gulf and India produces more per panel, cutting the cost per MWh.

Solar, wind and hydro generation: Moats

Long PPAs
Fixed-price contracts lock in revenue for decades.
Grid connections and sites
Connection rights are scarce and queues are long.

Solar, wind and hydro generation: SWOT

Solar, wind and hydro generation: Strengths

  • No fuel cost
  • Cheapest new power in most places
  • Predictable contracted cash flows

Solar, wind and hydro generation: Weaknesses

  • Output depends on weather
  • Most cost is upfront
  • Grid queues delay projects

Solar, wind and hydro generation: Opportunities

  • Corporate PPAs for data centers
  • Hybrid solar and battery plants
  • Repowering old wind farms

Solar, wind and hydro generation: Threats

  • Midday price falls where solar is plentiful
  • Higher interest rates
  • Tariffs on imported panels

Solar, wind and hydro generation: Key measures

Capacity factor
Actual output divided by output at full power all yearTypical: About 17 percent for new solar, 34 percent onshore wind, 42 percent offshore wind in 2024(source 2)
LCOE
Lifetime cost per MWhTypical: About USD 43 for solar and USD 34 for onshore wind in 2024(source 2)
Curtailment rate
Share of possible output switched offTypical: Low single digits in well-connected grids, much higher where lines are short

Solar, wind and hydro generation: Margin and capital

Typical margin
About 20 percent operating margin for US renewable companies in January 2026 data
Capital intensity
Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.

Solar, wind and hydro generation: Players

ACWA Power (Saudi Arabia), Masdar (UAE), Adani Green Energy (India), Iberdrola (Spain), NextEra Energy (United States), China Three Gorges, Orsted (Denmark).

Solar, wind and hydro generation: How it comes up in a case

  • Should we bid in a 1 GW solar tender in Saudi Arabia, and at what tariff? Build the cost per MWh from capex, capacity factor and cost of capital.
  • A data center operator needs 500 MW of clean power. Compare a PPA, owning plants, and buying certificates.
Battery and grid storageBig batteries that charge when power is cheap and give it back when it is dear.

Battery and grid storage: How it differs

Storage makes no new energy; it moves energy in time and helps keep the grid stable. It earns the gap between off-peak and peak prices plus fees for grid services, so it depends on how wide and how often those price gaps open.

Battery and grid storage: Customers

Wholesale markets, grid operators that buy frequency and reserve services, and solar owners that want to sell firm power.

Battery and grid storage: Supply chain

  1. Cells and packs

    Thin margin

    Factories make lithium iron phosphate cells and assemble them into containers.

    Inputs in
    Lithium, iron, phosphate and graphite, Factory power and labor
    Outputs out
    Battery containers
    Who does it
    CATL, BYD, EVE Energy, LG Energy Solution.
    Value added
    Mass production has cut pack prices sharply.
  2. Integration and installation

    Thin margin

    Integrators add inverters, cooling and control software and connect the system to the grid.

    Inputs in
    Battery containers, Inverters and transformers, Software
    Outputs out
    A grid-connected storage plant
    Who does it
    Fluence, Tesla Energy, Sungrow, Wartsila.
    Value added
    Turns cells into a safe, controllable power plant.
  3. Operation and trading

    Margin varies

    Software decides when to charge and discharge, and bids into energy and grid service markets.

    Inputs in
    Price forecasts, Trading software, Grid access
    Outputs out
    Peak power, Frequency and reserve services
    Who does it
    Owners and optimizers such as Habitat Energy, utilities, Masdar.
    Value added
    Captures the price gaps and service fees.

Battery and grid storage: Business models

Battery and grid storage: business models
ModelHow it earnsExamplesTypical margin
Merchant storageTrades the gap between cheap and dear hours and sells grid services at market prices.Battery owners in Britain, Texas and AustraliaVaries widely with price swings
Contracted storagePaid a fixed fee per MW per year under a tolling or capacity contract.Battery tenders in India, the Gulf and CaliforniaSteady, contract based

Battery and grid storage: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one MWh discharged at the evening peak by a grid battery.

Battery and grid storage: one unit, revenue, costs and profit
LineAmountShare of revenue
Peak price receivedEUR 120100%
Minus Off-peak power bought, including round-trip lossesEUR 3428%
Minus Capital recovery and interestEUR 5042%
Minus Operation, maintenance and battery wearEUR 86.7%
Minus Grid feesEUR 65%
ProfitEUR 2218%

Check: EUR 120 minus EUR 98 of costs leaves EUR 22.

So what: Capital is the largest cost, so cheaper packs have made storage pay. But the margin depends on a wide daily price gap; if more batteries narrow that gap, each one earns less.

Battery and grid storage: How costs divide

Battery and grid storage: costs as a share of revenue
Cost lineShare of revenue
Capital recovery and interest40 to 55 percent of revenue
Charging power25 to 35 percent
Operation, maintenance and degradation5 to 10 percent
Grid fees3 to 8 percent

Battery and grid storage: What drives revenue

Daily price spread
A wider gap between cheap and dear hours earns more per cycle.
Cycles per day
More charge and discharge cycles earn more, but wear the battery faster.
Grid service prices
Frequency and reserve fees pay for being ready, not just for energy.

Battery and grid storage: What drives profit

Pack price
Stationary packs averaged about USD 70 per kWh in 2025, 45 percent less than in 2024, cutting the biggest cost.
Round-trip efficiency
Less energy lost in charging means cheaper inputs per MWh sold.
Trading skill
Better forecasting catches more of the best hours.

Battery and grid storage: Key inputs and outputs

Battery and grid storage: key inputs
InputWhat it is forShare of cost
Battery packsStoring energyAbout 40 to 60 percent of system cost(source 10)
Inverters and grid connectionConverting and exporting power15 to 25 percent
Off-peak powerCharging25 to 35 percent of yearly cost

Outputs: Peak power; Frequency response and reserves; Firm output for solar plants.

Battery and grid storage: Selling points

Speed
Batteries respond in under a second, faster than any thermal plant, which grid operators pay for.
Modular build
A battery can be built in months, far faster than a gas plant.

Battery and grid storage: Moats

Grid connection
Connected sites are scarce, and a battery next to a solar farm can share its connection.
Trading software and data
Years of price data and good algorithms earn more per MWh.

Battery and grid storage: SWOT

Battery and grid storage: Strengths

  • Fast and flexible
  • Costs falling quickly
  • No fuel and no emissions

Battery and grid storage: Weaknesses

  • Limited hours of storage, often 2 to 4
  • Batteries wear out
  • Revenue depends on volatile price gaps

Battery and grid storage: Opportunities

  • Pairing with solar for round-the-clock power
  • Replacing gas plants in evening peaks
  • Data center backup

Battery and grid storage: Threats

  • Too many batteries narrowing price gaps
  • Fire safety rules
  • Trade barriers on Chinese cells

Battery and grid storage: Key measures

Round-trip efficiency
Energy returned divided by energy taken inTypical: Often 85 to 90 percent for lithium batteries
Revenue per MW per year
Income for each MW of batteryTypical: Varies widely by market and year
Duration
Hours the battery can discharge at full powerTypical: Usually 2 to 4 hours

Battery and grid storage: Margin and capital

Typical margin
Varies widely; contracted projects earn steady returns, merchant ones swing with price gaps
Capital intensity
HighA lot of money must be tied up before the business earns anything, so the return on that money matters as much as the margin.

Battery and grid storage: Players

CATL (China), Tesla Energy (United States), Fluence, Sungrow (China), Masdar (UAE), Wartsila (Finland).

Battery and grid storage: How it comes up in a case

  • Should a European utility add batteries to its solar parks? Value the shift from noon to evening prices.
  • How many hours of storage does a solar plant need to sell firm power to a state buyer?
Transmission grids and system operatorsCompanies that run the high-voltage power lines that carry electricity across a country.

Transmission grids and system operators: How it differs

Transmission is a natural monopoly, so a regulator sets how much it may earn. Profit comes from growing the approved network and beating cost targets, not from selling more power.

Transmission grids and system operators: Customers

Generators that pay to connect and send power, distributors and large users that take power off the grid, and in the end every bill payer.

Transmission grids and system operators: Supply chain

  1. Planning and approval

    Medium margin

    The grid company plans new lines and asks the regulator to approve the spending.

    Inputs in
    Demand forecasts, Connection requests, Regulatory filings
    Outputs out
    An approved investment plan
    Who does it
    National Grid, Power Grid Corporation of India, TenneT.
    Value added
    Decides which lines get built, and so which plants can connect.
  2. Construction

    Thin margin

    Contractors build towers, lay cables and install substations and transformers.

    Inputs in
    Steel, aluminum and copper, Transformers, Crews
    Outputs out
    New lines and substations
    Who does it
    Siemens Energy, Hitachi Energy, Kalpataru, Larsen and Toubro.
    Value added
    Adds capacity to move power.
  3. Operation and balancing

    Medium margin

    Control rooms match supply and demand every second and keep frequency steady.

    Inputs in
    Control systems, Reserves bought from plants and batteries
    Outputs out
    A stable grid, Bulk power delivered
    Who does it
    System operators such as National Energy System Operator (UK) and Grid Controller of India.
    Value added
    Keeps the lights on.

Transmission grids and system operators: Business models

Transmission grids and system operators: business models
ModelHow it earnsExamplesTypical margin
Regulated asset base modelAllowed revenue covers running costs, depreciation and a return on the value of the network.National Grid, TenneT, Power Grid Corporation of IndiaSteady; set by the regulator
Tendered transmission lineWins a contract to build and own a line for a fixed yearly charge over 25 to 35 years.Indian tariff-based transmission projects, Brazilian line auctionsSteady once built

Transmission grids and system operators: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one year of allowed revenue for each GBP 100 of regulated asset base.

Transmission grids and system operators: one unit, revenue, costs and profit
LineAmountShare of revenue
Allowed revenueGBP 14100%
Minus Running costsGBP 429%
Minus Depreciation of the networkGBP 536%
Minus Interest on debtGBP 2.5018%
Minus TaxGBP 0.503.6%
ProfitGBP 214%

Check: GBP 14 minus GBP 12 of costs leaves GBP 2.

So what: The owner keeps about GBP 2 per 100 of network, about 5 percent on its share of the funding. To grow profit it must grow the approved network or spend less than the regulator allowed.

Transmission grids and system operators: How costs divide

Transmission grids and system operators: costs as a share of revenue
Cost lineShare of revenue
Depreciation30 to 40 percent of allowed revenue
Running costs25 to 35 percent
Interest15 to 20 percent
Tax and other3 to 8 percent

Transmission grids and system operators: What drives revenue

Regulated asset base
A bigger approved network earns a bigger allowed return.
Allowed return
The regulator's chosen cost of capital sets the return on each pound.
Incentive payments
Beating targets for reliability or connections earns bonuses.

Transmission grids and system operators: What drives profit

Beating cost allowances
Spending less than allowed, while meeting targets, is shared with the owner.
Cost of debt
Borrowing cheaper than the allowance adds profit.
Delivery on time
Late projects can lose allowances or face penalties.

Transmission grids and system operators: Key inputs and outputs

Transmission grids and system operators: key inputs
InputWhat it is forShare of cost
Transformers and switchgearSubstations20 to 30 percent of capital
Conductors, towers and cablesLines30 to 40 percent of capital
Engineers and crewsBuilding and maintainingMost running cost

Outputs: Bulk power transport; System balancing and stability; Grid connections for new plants.

Transmission grids and system operators: Selling points

Delivery capacity
Grids that can build fast connect more plants and earn more allowed growth.
Reliability record
Few outages earn incentives and trust from regulators.

Transmission grids and system operators: Moats

Natural monopoly
A second national grid would make no economic sense.
Licence
The right to own and run the grid is granted by law and rarely changes hands.

Transmission grids and system operators: SWOT

Transmission grids and system operators: Strengths

  • Steady inflation-linked returns
  • No competition on the wires
  • Growing investment needs

Transmission grids and system operators: Weaknesses

  • Profit capped by the regulator
  • Long permit times for new lines
  • Heavy debt

Transmission grids and system operators: Opportunities

  • Connecting renewables and data centers
  • Interconnectors between countries
  • Britain expects over GBP 70 billion of network upgrades from April 2026

Transmission grids and system operators: Threats

  • Tougher regulatory settlements
  • Supply shortages of transformers and cables
  • Local opposition to new pylons

Transmission grids and system operators: Key measures

Regulated asset base growth
Yearly growth of the network value earning a returnTypical: Several percent a year in growth periods
Allowed return on equity
Return the regulator allows ownersTypical: About 5.7 percent after inflation for British electricity transmission, 2026 to 2031(source 5)
Grid availability
Share of time lines are in serviceTypical: Usually above 99 percent

Transmission grids and system operators: Margin and capital

Typical margin
Steady; allowed returns set by regulators, operating margins often 30 to 50 percent of revenue
Capital intensity
Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.

Transmission grids and system operators: Players

National Grid (UK), Power Grid Corporation of India, State Grid Corporation of China, TenneT (Netherlands and Germany), Elia (Belgium), Transco (Abu Dhabi).

Transmission grids and system operators: How it comes up in a case

  • Grid connection queues are delaying renewables. How should the operator prioritize and fund new lines?
  • Should an investor buy a stake in a regulated grid? Value the asset base and the next regulatory period.
Distribution networksCompanies that run the local wires and meters that bring power to every home and shop.

Distribution networks: How it differs

Distribution is also a regulated monopoly, but it touches every customer, so losses, theft, unpaid bills and tariffs below cost hit it directly. In India many state distribution companies (DISCOMs) lose money for these reasons.

Distribution networks: Customers

Households, shops, farms and factories, through tariffs set by state or national regulators.

Distribution networks: Supply chain

  1. Power purchase

    Thin margin

    The distributor buys power from generators under long contracts and from markets.

    Inputs in
    Power purchase agreements, Market purchases
    Outputs out
    Power at the substation
    Who does it
    State DISCOMs, Tata Power distribution, Meralco.
    Value added
    Secures enough power for its area.
  2. Local network

    Medium margin

    Transformers step voltage down and local lines carry power to each meter.

    Inputs in
    Transformers and lines, Crews
    Outputs out
    Power at the meter
    Who does it
    E.ON networks, Kenya Power, BSES, UK Power Networks.
    Value added
    Reaches every customer.
  3. Metering, billing and collection

    Thin margin

    Meters record use; bills are sent and collected, or prepaid smart meters take payment in advance.

    Inputs in
    Meters and smart meters, Billing systems, Collection staff
    Outputs out
    Revenue collected
    Who does it
    Distributors and their contractors.
    Value added
    Turns power delivered into cash.

Distribution networks: Business models

Distribution networks: business models
ModelHow it earnsExamplesTypical margin
Regulated wires-only distributorEarns allowed revenue on its network; retailers pay it to use the wires.UK Power Networks, E.ON networksSteady, set by the regulator
Integrated distributor and supplierBuys power and sells it to customers at regulated tariffs, keeping the gap after costs and losses.Indian DISCOMs, Kenya Power, MeralcoRanges from losses at many state DISCOMs to steady profit at private ones such as Tata Power Delhi

Distribution networks: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: 100 kWh bought by a loss-making state distributor in India.

Distribution networks: one unit, revenue, costs and profit
LineAmountShare of revenue
Revenue actually collected after losses, theft and unpaid billsINR 700100%
Minus Power purchaseINR 56080%
Minus Transmission chargesINR 507.1%
Minus Staff, operations and maintenanceINR 8011%
Minus Interest and depreciationINR 608.6%
Profitminus INR 50-7.1%

Check: INR 700 minus INR 750 of costs leaves minus INR 50.

So what: The distributor pays for every unit it buys, but only collects for the units that reach paying customers. Cutting losses by a few points can turn this loss into a profit, which is why smart meters and anti-theft drives matter more than tariff rises.

Distribution networks: How costs divide

Distribution networks: costs as a share of revenue
Cost lineShare of revenue
Power purchase70 to 80 percent of cost for an integrated distributor
Transmission charges5 to 10 percent
Staff and maintenance8 to 12 percent
Interest and depreciation5 to 10 percent

Distribution networks: What drives revenue

Tariff level
Set by the regulator, often below cost for farms and poorer homes.
Collection efficiency
Every unpaid bill is revenue lost.
Subsidy payments
State governments pay for some cheap tariffs; late payment hurts cash.

Distribution networks: What drives profit

AT&C losses
India cut these from about 22 percent to about 16 percent between the years to March 2021 and March 2025.
Power purchase cost
Old expensive contracts lock in high costs for years.
Smart metering
Prepaid and smart meters cut theft and billing errors.

Distribution networks: Key inputs and outputs

Distribution networks: key inputs
InputWhat it is forShare of cost
Bulk powerProduct delivered70 to 80 percent
Meters and transformersMeasuring and stepping down powerMost of network capital
Field and billing staffRepairs, reading and collecting8 to 12 percent

Outputs: Power at the meter; Connections for new homes and chargers; Billing and collection.

Distribution networks: Selling points

Low losses
Private distributors that cut theft, such as in Delhi and Mumbai, earn where state ones lose.
Smart meter rollout
Real-time data lets the company find losses and bill accurately.

Distribution networks: Moats

Exclusive licence area
Only one company runs the wires in each area.
Customer base
Every building in the area is already connected to its network.

Distribution networks: SWOT

Distribution networks: Strengths

  • Monopoly on local wires
  • Every customer in the area
  • Growing demand from electric cars and cooling

Distribution networks: Weaknesses

  • Losses and theft in many developing markets
  • Tariffs set by politics
  • Aging networks

Distribution networks: Opportunities

  • Smart meters and prepaid billing
  • Rooftop solar and EV charging connections
  • Universal access programs in Africa

Distribution networks: Threats

  • Unpaid state subsidies
  • Extreme weather damaging lines
  • Customers producing their own power with rooftop solar

Distribution networks: Key measures

AT&C losses
Power lost, stolen or never paid for, as a share of power suppliedTypical: About 16 percent nationally in India in the year to March 2025(source 6)
Collection efficiency
Cash collected divided by amount billedTypical: Near 100 percent at the best distributors, much lower at weak ones
Outage minutes per customer
How long the average customer is without power each yearTypical: Varies from minutes in Singapore to many hours in weaker grids

Distribution networks: Margin and capital

Typical margin
Steady for regulated wires companies; losses at many state distributors in India and Africa
Capital intensity
HighA lot of money must be tied up before the business earns anything, so the return on that money matters as much as the margin.

Distribution networks: Players

Tata Power (India), BSES (India), Kenya Power, Meralco (Philippines), UK Power Networks, E.ON (Germany), DEWA (Dubai).

Distribution networks: How it comes up in a case

  • A state distribution company in India loses money every year. Fix it, starting with AT&C losses and power purchase cost.
  • How can a country in Africa give electricity to everyone by 2030? Compare grid extension, mini-grids and solar home systems.
Retail energy supplyCompanies that buy power in bulk and sell it to homes and businesses on monthly bills.

Retail energy supply: How it differs

Retailers own few assets; they buy power, pay network and policy charges, and keep a thin margin for billing and service. Their risk is buying power at one price and selling at another, as many British suppliers that failed in 2021 and 2022 learned.

Retail energy supply: Customers

Households and businesses in markets where customers can choose their supplier, such as Britain, Australia and parts of the United States.

Retail energy supply: Supply chain

  1. Hedging and buying

    Thin margin

    The supplier buys power months or years ahead to match what its customers will use.

    Inputs in
    Wholesale contracts, Demand forecasts, Credit
    Outputs out
    A hedged power book
    Who does it
    Supplier trading teams.
    Value added
    Protects customers and the company from price spikes.
  2. Tariff design and sales

    Thin margin

    The supplier sets fixed, variable or time-of-use tariffs and signs up customers.

    Inputs in
    Marketing, Price comparison sites, Brand
    Outputs out
    Customer contracts
    Who does it
    Octopus Energy, British Gas, AGL Energy.
    Value added
    Packages wholesale power into a simple price.
  3. Billing and service

    Thin margin

    Meters are read, bills sent, payments collected and questions answered.

    Inputs in
    Billing software, Call centers, Smart meter data
    Outputs out
    Bills and collected cash
    Who does it
    Suppliers, often on their own platforms.
    Value added
    Customer experience and collection.

Retail energy supply: Business models

Retail energy supply: business models
ModelHow it earnsExamplesTypical margin
Household supplierEarns the gap between the tariff and the cost of power, networks, policies and service.Octopus Energy, British Gas, E.ONUnder 3 percent of the bill in Britain's price cap
Business supplier and energy servicesSells power to firms with added services such as on-site solar, efficiency and green contracts.Engie, Iberdrola, MeralcoLow single digits, higher on services

Retail energy supply: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one British household's yearly electricity bill, before VAT.

Retail energy supply: one unit, revenue, costs and profit
LineAmountShare of revenue
Bill paid by the householdGBP 1,000100%
Minus Wholesale powerGBP 46547%
Minus Network chargesGBP 25025%
Minus Operating costs, bad debt and industry costsGBP 17017%
Minus Policy costsGBP 898.9%
ProfitGBP 262.6%

Check: GBP 1,000 minus GBP 974 of costs leaves GBP 26.

So what: The supplier keeps about 2.6 percent, close to what Britain's price cap allows. One bad hedging decision or a rise in bad debt can erase a whole year of profit, so cost to serve and risk control decide who survives.

Retail energy supply: How costs divide

Retail energy supply: costs as a share of revenue
Cost lineShare of revenue
Wholesale energyAbout 44 to 47 percent(source 3)
NetworksAbout 24 to 25 percent(source 3)
Operating costs and bad debtAbout 17 percent(source 3)
Policy costsAbout 6 percent(source 3)
ProfitAbout 2.6 to 2.7 percent(source 3)

Retail energy supply: What drives revenue

Number of customers
Revenue scales with accounts held; switching rates decide growth.
Tariff level
Capped in many markets, so revenue per customer follows the regulator.
Add-on services
Heat pumps, solar, batteries and EV tariffs add revenue per customer.

Retail energy supply: What drives profit

Cost to serve
Cheaper billing and fewer calls per customer lift margin directly.
Hedging accuracy
Buying too little ahead exposes the supplier to spikes.
Bad debt
Unpaid bills rise when prices jump, eating the thin margin.

Retail energy supply: Key inputs and outputs

Retail energy supply: key inputs
InputWhat it is forShare of cost
Wholesale powerProduct soldAbout 44 to 47 percent of the bill(source 3)
Network accessDelivery to the customerAbout a quarter(source 3)
Billing software and staffServing customersPart of the 17 percent operating cost(source 3)

Outputs: Power supplied on tariffs; Smart and time-of-use tariffs; Energy services such as solar and heat pumps.

Retail energy supply: Selling points

Low cost to serve
Suppliers with their own software, such as Octopus, serve each customer more cheaply.
Smart tariffs
Cheaper night rates for EV owners attract high-use customers.

Retail energy supply: Moats

Scale
Fixed costs of systems and compliance spread over millions of accounts.
Customer inertia
Many customers rarely switch, keeping revenue steady.

Retail energy supply: SWOT

Retail energy supply: Strengths

  • Few assets needed
  • Direct customer relationship
  • Data from smart meters

Retail energy supply: Weaknesses

  • Thin capped margins
  • Exposed to price spikes
  • High bad debt in crises

Retail energy supply: Opportunities

  • Bundling heat pumps, solar and EV charging
  • Flexible demand that earns grid service fees
  • Software sold to other suppliers

Retail energy supply: Threats

  • Wholesale spikes such as in 2026
  • Political pressure on bills
  • Regulators tightening capital rules

Retail energy supply: Key measures

Cost to serve per account
Yearly operating cost per customerTypical: Lower at digital suppliers
Customer churn
Share of customers leaving each yearTypical: Rises when price competition returns
Bad debt ratio
Share of billing never collectedTypical: A few percent; higher in crises

Retail energy supply: Margin and capital

Typical margin
Under 3 percent of a household bill
Capital intensity
LowLittle money is tied up in buildings, machines or stock, so growing is cheap.

Retail energy supply: Players

Octopus Energy (UK), British Gas (UK), E.ON (Germany), AGL Energy (Australia), Meralco (Philippines), DEWA (Dubai).

Retail energy supply: How it comes up in a case

  • A household energy supplier in the UK is losing customers and margin. Look at cost to serve, hedging and bad debt.
  • Should a supplier offer heat pumps and solar? Compare margin per customer against the cost and risk of installation.
Solar, wind and grid equipment manufacturingFactories that make solar panels, wind turbines, inverters, transformers and cables.

Solar, wind and grid equipment manufacturing: How it differs

Equipment makers sell products, not power, so they live on volume, factory scale and price competition. Solar panels are close to a commodity made mostly in China, while turbines and grid gear are complex products with long order books and service contracts.

Solar, wind and grid equipment manufacturing: Customers

Developers, utilities, grid companies and construction contractors around the world.

Solar, wind and grid equipment manufacturing: Supply chain

  1. Raw materials

    Margin varies

    Quartz becomes polysilicon; steel, copper, aluminum and rare earth magnets are bought for turbines and grid gear.

    Inputs in
    Quartz and power, Steel and copper, Rare earths
    Outputs out
    Polysilicon, Metals and magnets
    Who does it
    Tongwei, GCL, steel and copper makers.
    Value added
    Purifies and shapes raw materials.
  2. Components

    Thin margin

    Wafers, cells, blades, gearboxes and transformer cores are made.

    Inputs in
    Polysilicon, Glass fiber and resin, Electrical steel
    Outputs out
    Cells, blades, nacelles and cores
    Who does it
    LONGi, Jinko Solar, LM Wind Power, Hitachi Energy.
    Value added
    Most of the technology value is added here.
  3. Final products and service

    Medium margin

    Panels, turbines, inverters and transformers are assembled, shipped and serviced for years.

    Inputs in
    Components, Assembly labor, Logistics
    Outputs out
    Panels, turbines, inverters, transformers, Service contracts
    Who does it
    Vestas, Siemens Energy, Goldwind, Sungrow, Waaree (India).
    Value added
    Delivers working machines and keeps them running.

Solar, wind and grid equipment manufacturing: Business models

Solar, wind and grid equipment manufacturing: business models
ModelHow it earnsExamplesTypical margin
Volume manufacturerSells panels or cells by the watt at market prices.LONGi, Jinko Solar, WaareeThin, even negative during gluts
Product plus serviceSells turbines or grid gear and earns long service contracts on them.Vestas, Siemens Energy, Hitachi EnergyLow single digits on products, higher on service

Solar, wind and grid equipment manufacturing: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: solar modules with 1 kW of capacity, sold to a developer.

Solar, wind and grid equipment manufacturing: one unit, revenue, costs and profit
LineAmountShare of revenue
Sale priceUSD 110100%
Minus Polysilicon and wafersUSD 3027%
Minus Cell processingUSD 2523%
Minus Glass, frame and other materialsUSD 3027%
Minus Labor and factory powerUSD 109.1%
Minus DepreciationUSD 87.3%
Minus Freight and salesUSD 54.5%
ProfitUSD 21.8%

Check: USD 110 minus USD 108 of costs leaves USD 2.

So what: When factories make more panels than the world installs, prices fall to near cost and margins vanish. Only the makers with the lowest cost per watt keep earning.

Solar, wind and grid equipment manufacturing: How costs divide

Solar, wind and grid equipment manufacturing: costs as a share of revenue
Cost lineShare of revenue
Materials60 to 75 percent of revenue
Labor and factory energy8 to 15 percent
Depreciation5 to 10 percent
Freight, sales and research5 to 10 percent

Solar, wind and grid equipment manufacturing: What drives revenue

Installations worldwide
Volume follows how much solar, wind and grid is built each year.
Price per watt or per turbine
Set by competition; panel prices swing with capacity.
Service contracts
Turbine and grid makers earn steady service fees for years after the sale.

Solar, wind and grid equipment manufacturing: What drives profit

Factory utilization
Idle lines spread fixed cost over fewer units.
Technology lead
More efficient cells sell at a premium for a while.
Trade barriers
Tariffs can protect local makers in the United States, Europe and India, or shut exporters out.

Solar, wind and grid equipment manufacturing: Key inputs and outputs

Solar, wind and grid equipment manufacturing: key inputs
InputWhat it is forShare of cost
Polysilicon and wafersSolar cells20 to 35 percent of a module
Steel, copper and electrical steelTurbines, transformers and cables30 to 50 percent of grid gear cost
Factory powerMaking polysilicon and cellsSeveral percent; large for polysilicon

Outputs: Solar panels and inverters; Wind turbines; Transformers, switchgear and cables; Service contracts.

Solar, wind and grid equipment manufacturing: Selling points

Lowest cost per watt
Chinese makers with huge integrated factories set the world price.
Long order books in grid gear
Transformer and cable makers have years of orders, which steadies revenue.

Solar, wind and grid equipment manufacturing: Moats

Scale and integration
Owning every step from polysilicon to module keeps cost below rivals.
Installed base
Turbine makers service the machines they sold for 20 years or more.

Solar, wind and grid equipment manufacturing: SWOT

Solar, wind and grid equipment manufacturing: Strengths

  • Huge growth in installations
  • Steep cost declines
  • Service income on turbines

Solar, wind and grid equipment manufacturing: Weaknesses

  • Gluts crush panel margins
  • Turbine makers have had warranty losses
  • Heavy dependence on China for materials

Solar, wind and grid equipment manufacturing: Opportunities

  • Grid equipment shortages
  • Local manufacturing incentives in India, the United States and the Gulf
  • Storage inverters

Solar, wind and grid equipment manufacturing: Threats

  • Trade tariffs and forced labor rules
  • Price wars
  • Metal price spikes

Solar, wind and grid equipment manufacturing: Key measures

Cost per watt
Full cost to make one watt of panelTypical: Lowest at large integrated Chinese plants
Factory utilization
Output divided by capacityTypical: Falls sharply in gluts
Order backlog
Value of orders not yet deliveredTypical: Years of revenue for transformer makers

Solar, wind and grid equipment manufacturing: Margin and capital

Typical margin
Thin for panels; low to medium for turbines and grid equipment, higher on service
Capital intensity
HighA lot of money must be tied up before the business earns anything, so the return on that money matters as much as the margin.

Solar, wind and grid equipment manufacturing: Players

LONGi (China), Jinko Solar (China), Vestas (Denmark), Siemens Energy (Germany), Goldwind (China), Waaree Energies (India), Hitachi Energy (Switzerland and Japan).

Solar, wind and grid equipment manufacturing: How it comes up in a case

  • Should India build its own solar cell factories? Compare cost per watt with imports, including tariffs.
  • A turbine maker is growing revenue but losing money. Look at fixed-price contracts, warranty costs and service mix.

Key measures

The numbers people in this industry track (also called KPIs, key performance indicators). Ask for the first one or two early in a case.

Capacity factor
The energy a plant actually produces in a year divided by what it would produce at full power all year.Typical: Global averages for new plants in 2024: about 17 percent for solar, 34 percent for onshore wind, 42 percent for offshore wind(source 2)
Levelized cost of electricity (LCOE)
The average cost of each MWh over a plant's life, including building and financing it, so solar, wind and gas can be compared on one number.Typical: Global averages for new plants in 2024: about USD 43 per MWh for solar and USD 34 for onshore wind, with large differences by country(source 2)
Regulated asset base (RAB, or RAV)
The value of the network a regulator lets a grid company earn a return on. Grow the approved network and the allowed profit grows.Typical: For April 2026 to March 2031, Britain's regulator allowed owners a return on equity of about 5.7 percent a year for electricity transmission and 6.1 percent for gas networks, measured after inflation (CPIH-real: on top of consumer price inflation)(source 5)
Cost of capital (WACC)
The yearly return lenders and owners demand on the money used to build. For solar and wind it is the biggest driver of cost per MWh.Typical: IRENA's 2024 assumptions ranged from about 3.8 percent in Europe to 12 percent in Africa(source 2)
Heat rate
The fuel a gas or coal plant burns to make one MWh. Lower means more efficient, so less fuel cost per MWh.
AT&C losses (India)
Aggregate technical and commercial losses: power lost in the wires, stolen, or billed and never paid for.Typical: About 16 percent nationally in India in the year to March 2025, down from about 22 percent in the year to March 2021(source 6)
Curtailment
Solar or wind power that is available but switched off because the grid cannot take it.
Peak demand and availability
The highest demand of the year, which sets how much capacity the system needs, and the share of time each plant is ready to run.
Benchmarks: typical figures to check a client's numbers against
Operating margin, US general utilities
About 23 percent(source 1)High margins, but on a very large asset base.
Operating margin, US power generators
About 21 percent(source 1)
Operating margin, US green and renewable energy companies
About 20 percent(source 1)
Installed cost of new solar and onshore wind, 2024 global average
About USD 690 per kW for solar and USD 1,040 per kW for onshore wind(source 2)
New renewable capacity cheaper than the cheapest new fossil option, 2024
About 91 percent(source 2)
Allowed profit for a household energy supplier in Great Britain
About 2.6 to 2.7 percent of the bill(source 3)
Allowed overall cost of capital (WACC) for British grids, 2026 to 2031
About 5.2 percent for gas and 5.5 to 5.7 percent for electricity transmission(source 4)The regulator calls these semi-nominal: part of the debt allowance includes inflation, while the return on equity is set after inflation.

In a case

First questions to ask

When a case lands in this industry, these get you to the numbers that matter.

  1. Which part of the chain are we in: generation, grid, storage or retail, and is the market liberalized or a single buyer?
  2. Who buys the power, under what contract, and how reliably do they pay?
  3. What is the cost per MWh, and what cost of capital does it assume?
  4. When is the power produced, and what is it worth at those hours?
  5. Can the grid take the power: is there a connection, and how much is curtailed?

Common traps

Mistakes candidates make in this industry, and what to do instead.

  • Mixing up MW (capacity, the size of the plant) and MWh (energy, what it produces). Compare plants on energy produced.
  • Using LCOE alone. Solar at noon can be worth much less than power in the evening peak.
  • Forgetting the cost of capital, which can change a renewable project's cost per MWh by a third.
  • Assuming a regulated grid can raise prices freely. Its return is set by the regulator.
  • Treating a state buyer as risk free when it has a history of paying late.
  • Reaching for a generic framework instead of the real driver of this industry. Instead, compare projects on cost per MWh (capacity factor, capex and cost of capital), or for a grid on the regulated asset base and the allowed return.
Typical case prompts in this industry
  • Should we bid in a 1 GW solar tender in Saudi Arabia, and at what tariff?
  • A state distribution company in India loses money every year. Fix it.
  • Should a European utility add batteries to its solar parks?
  • Our gas power plant runs fewer hours every year. Keep it, change it or close it?
  • How can a country in Africa give electricity to everyone by 2030?
  • A data centre operator needs 500 MW of clean power. How should it buy it?
  • A household energy supplier in the UK is losing customers and margin. What should it do?

Go further

Optional. Open what you need.

Players by region

Well-known companies in each region. You do not need to learn them by heart; they help you picture the market.

Global
Enel, Iberdrola, EDF, Engie, ACWA Power, Siemens Energy and Vestas (equipment)
Europe
EDF (France), Enel (Italy), Iberdrola (Spain), RWE and E.ON (Germany), Orsted (Denmark), National Grid (UK), Octopus Energy (UK retail)
Middle East
ACWA Power (Saudi Arabia), Masdar (UAE), EWEC (Abu Dhabi single buyer), DEWA (Dubai), Saudi Electricity Company
India
NTPC (state owned), Power Grid Corporation of India, Adani Green Energy, Tata Power, ReNew, JSW Energy, State DISCOMs
Southeast Asia
Tenaga Nasional (Malaysia), EGAT (Thailand), PLN (Indonesia), Sembcorp (Singapore)
United States
NextEra Energy, Duke Energy, Southern Company, Constellation (nuclear)
China
State Grid Corporation of China, China Three Gorges, LONGi and Jinko Solar (panels), CATL (batteries)
Africa
Eskom (South Africa), KenGen and Kenya Power, IPPs backed by development banks
Australia and New Zealand
AGL Energy, Origin Energy, EnergyAustralia, Meridian Energy (New Zealand)
Canada
Hydro-Québec, Ontario Power Generation, BC Hydro
What changed, 2024 to 2026
  • Solar is growing fastest: solar generation rose about 30 percent in 2025 and renewables supplied about 34 percent of world electricity, slightly more than coal for the first time.(source 8)
  • In the EU, wind and solar made about 30 percent of electricity in 2025, more than fossil fuels (about 29 percent) for the first time, and batteries began to cover some of the hours when gas plants used to set the price. When sun and wind are strong, prices fall, which makes batteries and evening power more valuable.(source 9)
  • India passed 50 percent non-fossil installed capacity in 2025, reaching about 267 GW of 514 GW at the end of 2025, towards a target of 500 GW of non-fossil capacity by 2030.(source 7)
  • The 2026 Gulf disruption pushed LNG and gas prices up, which raises power prices wherever gas plants set the price. In Great Britain the wholesale share of the household price cap rose to about 47 percent for October to December 2026, and the government removed VAT on electricity bills until March 2027.(source 3)
  • Batteries became cheap enough to pair with solar at scale: packs for stationary storage averaged about USD 70 per kWh in 2025, 45 percent less than in 2024 and the cheapest of any use.(source 10)
  • Solar can now run around the clock with enough batteries: Masdar and EWEC broke ground in 2025 on 5.2 GW of solar with 19 GWh of batteries in Abu Dhabi, designed to supply 1 GW day and night from 2027.(source 11)
  • Grids are investing heavily as demand grows, including from data centres: Britain's regulator says its networks could need over GBP 70 billion of upgrades in the five years from April 2026.(source 4)
Words to know

Linked words have a fuller entry in the glossary.

MW and MWh
MW is how much power a plant can make at one moment; MWh is the energy made over time (1 MW for one hour).
Capacity factor (glossary entry)
Actual yearly output divided by output at full power all year.
LCOE (glossary entry)
Levelized cost of electricity: lifetime cost divided by lifetime MWh.
Merit order (glossary entry)
Plants are used from cheapest to dearest running cost; the last one needed sets the price.
PPA (glossary entry)
Power purchase agreement: a long contract to buy power at an agreed price.
IPP (glossary entry)
Independent power producer: a private company that builds and runs plants and sells the power.
Regulated asset base
The value of a grid that a regulator lets the owner earn a return on.
DISCOM
A distribution company in India, usually owned by a state government.
AT&C losses (glossary entry)
Power lost, stolen or never paid for, as a share of power supplied.
Curtailment (glossary entry)
Switching off available solar or wind because the grid cannot take it.
Capacity payment
Money paid to a plant for being ready to run, whether or not it runs.
Round-trip efficiency (glossary entry)
The share of energy a battery gives back compared with what it took in.
Sources

Facts checked on . Worked numbers are illustrative, shaped by these sources rather than one company's figures.

  1. NYU Stern School of Business, operating and net margins by industry (US companies), data as of January 2026 (opens in a new tab)
  2. IRENA, Renewable Power Generation Costs in 2024 (summary: installed costs, capacity factors, LCOE, cost of capital) (opens in a new tab)
  3. Ofgem, Summary of changes to the energy price cap, 1 October to 31 December 2026 (direct debit cost breakdown) (opens in a new tab)
  4. Ofgem, RIIO-3 Final Determinations overview, December 2025 (opens in a new tab)
  5. Oxera, "RIIO-3 Final Determinations" (allowed return on equity, CPIH-real, post-tax), December 2025 (opens in a new tab)
  6. Press Information Bureau (India), "Key initiatives to bring down AT&C losses of power distribution utilities" (21.91 percent in FY21 to 16.16 percent in FY25) (opens in a new tab)
  7. Press Information Bureau (India), non-fossil share of installed power capacity (opens in a new tab)
  8. Ember, Global Electricity Review 2026 (opens in a new tab)
  9. Ember, European Electricity Review 2026 (opens in a new tab)
  10. BloombergNEF, "Lithium-ion battery pack prices fall to $108 per kilowatt-hour", December 2025 (opens in a new tab)
  11. ESS News, "Masdar, EWEC break ground on 1 GW baseload solar-plus-storage project", 27 October 2025 (opens in a new tab)
  12. The National, "Qatar extends LNG force majeure as Hormuz disruption threatens winter supply", 28 September 2026 (opens in a new tab)
  13. IEA, Energy and AI (2025) (opens in a new tab)