A popular roller coaster at a theme park in Abu Dhabi serves 1,200 people an hour, and at peak its queue holds about 2,400 people. Guest ratings for the ride have fallen, and complaints mention waits of well over an hour. How the queue builds and falls through the day is in the chart. The park's head of operations asks how long the peak wait is, and how to cut it.

Interviewer-led: the interviewer shows the queue chart and asks for the peak wait, then for levers, then for which lever to test first.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What kind of ride is it?

    What the interviewer says

    The park's newest roller coaster, with trains of 24 seats. Counting its stops, it serves 1,200 people an hour on average.

History

  • When did the waits become a problem?

    What the interviewer says

    Since the ride opened last year. It is the park's most popular ride.

Objective

  • What is the goal: shorter waits, more riders, or happier guests?

    What the interviewer says

    Happier guests. Waits over an hour hurt the park's ratings; the link is in the second exhibit.

Financials

  • Does the ride earn money on its own?

    What the interviewer says

    No. Guests pay one entry ticket. Ratings drive repeat visits and annual-pass sales.

Customers

  • Who rides it?

    What the interviewer says

    Mostly teenagers and young adults, many of them visitors from abroad who come for one day.

  • Would guests accept a timed return ticket?

    What the interviewer says

    A survey says about half of peak guests would take one if the return slot were within a few hours.

Competitors

  • What do other parks do?

    What the interviewer says

    Many large parks use timed return tickets or virtual queues for their busiest rides.

Operations

  • Is the ride running at full capacity?

    What the interviewer says

    Mostly, but it stops about 10 percent of the time for safety checks.

  • Could we add seats?

    What the interviewer says

    A third train could be added, but it takes about nine months and costs about AED 8 million.

  • What is the queue area like?

    What the interviewer says

    Only half of it is shaded, and midday temperatures pass 40 degrees in summer.

Constraints

  • Is there anything we cannot change?

    What the interviewer says

    Safety checks cannot be shortened, only moved in time. The park will not sell paid queue jumps.

Exhibits

Exhibit 1

Queue length at the ride through the day (people)(people in the queue)

Line chart: Queue length at the ride through the day (people). Values in people in the queue. 10:00: 800; 12:00: 2,400; 14:00: 2,000; 16:00: 1,200; 18:00: 600.

Exhibit 2

Guest rating of the ride by wait time (out of 5)(rating out of 5)

Bar chart: Guest rating of the ride by wait time (out of 5). Values in rating out of 5. Waited under 30 minutes: 4.6; Waited 30 to 60 minutes: 4.2; Waited over 60 minutes: 3.4.

Source: illustrative guest survey, last three months.

Solution

Show the solution

Hypothesis

The wait depends on how many people are ahead and how fast they are served. My hypothesis is that the fastest improvement comes from spreading peak demand, since building capacity is slow and costly.

Structure

  • Wait = queue length / service rateThis comes from wait = queue length / service rate: serve faster, spread arrivals, or change how the wait feels.
    • Serve faster: less downtime, faster loading, more seats
    • Key: Spread arrivals: timed return tickets, off-peak incentives
    • Change how the wait feels: shade, entertainment, accurate signs

Analysis

  1. 1. Estimate the wait

    2,400 people in line and 1,200 served an hour.

    Wait (hours): 2,400 ÷ 1,200 = 2

  2. 2. Lever 1: remove downtime

    If the ride stopped for checks outside peak hours instead, it would serve 1,200 / 0.9 people an hour at peak, and the wait would fall only a little.

    Wait without downtime (hours): 2,400 ÷ (1,200 ÷ 0.9) = 1.8

  3. 3. Lever 2: timed return tickets

    If half the peak queue takes a timed return ticket instead of standing in line, 1,200 people remain, provided return slots are set in quieter hours. Otherwise returners take capacity from the standby line.

    Wait with timed tickets (hours): 1,200 ÷ 1,200 = 1

  4. 4. Where the quiet hours are

    Read the chart: at 18:00 only 600 people are queuing, a wait of about 30 minutes, so return slots belong in the late afternoon and evening.

    Wait at 18:00 (minutes): 600 ÷ 1,200 × 60 = 30

  • Exhibit 1: The queue is four times longer at midday than in the early evening, so there is quiet capacity later in the day to move guests into.
  • Exhibit 2: Ratings drop most once the wait passes an hour, so getting the peak wait to about an hour matters most.

Recommendation

Pilot timed return tickets first, and move safety checks out of peak hours in parallel. First, the wait is about two hours, and removing downtime alone cuts it only to about 1.8 hours. Second, timed tickets for half the peak queue cut the physical wait to about one hour at low cost, provided return slots are set in quieter hours. Otherwise returners take capacity from the standby line. Third, the chart shows those quieter hours exist: by 18:00 the queue is only 600 people, a wait of about 30 minutes. Beyond these two structural levers, a third changes how the wait feels: shade, entertainment, and accurate wait-time signs. The move in play is smoothing demand rather than adding capacity. A ride's capacity is fixed and costly to raise: a third train would take about nine months. Guest ratings fall sharply once waits pass an hour, so moving guests into quiet hours is the cheapest fix.

Risks

  • Guests may dislike booking return times
  • Timed tickets can move the crowd to other rides

Next steps

  • Pilot timed tickets on this ride for two weekends
  • Measure guest ratings before and after

Strong and weak answers

A strong candidate

Built a simple model from scratch, used it to find and size the levers, and picked a cheap pilot first.

A weak candidate

Listed random ideas (music, an app, more staff) with no model and no sense of which would help most.

Sources