So What Club

Non-standard and creative cases

A prompt that fits no familiar type, handled from first principles: clarify the objective, build a simple model, and find the levers.

16 min

What this case type is and when it shows up

Sometimes the prompt fits no familiar type: how would you reduce waiting at a busy theme park, how should a city decide whether to allow electric scooters, how would you reduce crowding at a large religious or sports event. There is no list to lean on, which is the point. It tests whether you can think clearly about something new.

The underlying theory, in plain language

When no type fits, go back to first principles. Clarify the objective, break the problem into your own clean parts, build a simple model of how the system works, and reason step by step.

Many of these prompts involve queues or flows, where Little's Law helps: the average wait equals the number of people in the queue divided by the rate at which people leave it (in a stable system, the arrival rate).

Stay calm and think out loud. The interviewer is watching how you handle the unknown, which matters more than any specific answer.

What the prompts sound like, from simple to hard

  • Simple: how can a theme park in Abu Dhabi reduce ride queues.
  • Medium: should a European city allow rented electric scooters.
  • Hard: how would you reduce crowding at a large event with millions of visitors.

Build the structure from the goal

Three moves that give you the structure

  1. Start from the decision. What exactly would success look like here: shorter waits, fewer people in one place, a decision made? Agree it before you build anything.
  2. Write the maths of the goal. Write the system as a simple equation. A queue: wait = people waiting / people served per hour. A crowd: people present = people arriving minus people leaving. A staffing question: people needed = places to cover x people per place. The equation gives you the levers.
  3. Let the business pick the branches. What you know about how the place works tells you which lever is cheap. A theme park knows when crowds arrive and can sell timed tickets. A rail operator can change fares by time of day more easily than it can add trains. A city can change rules faster than it can build.
Same type, different case 1: cutting waits for taxis at an airport late at night
  • Wait = passengers waiting / taxis arriving per hour
    • Passengers per hour after late flights
    • Key: Taxis arriving per hour
    • Levers on supply: a night bonus for drivers, a shared shuttle
    • Levers on demand: rides booked before landing

This comes from wait = queue / service rate. At night the problem is supply, so taxis arriving gets the detail.

Same type, different case 2: deciding how many lifeguards a city beach needs
  • Lifeguards = stretches of beach to watch x people on duty per stretch
    • Length of beach and safe watching distance
    • Key: Crowds by hour and by day
    • Risk: currents, children, and swimming zones
    • Cost and recruitment

Same method, a different equation. Crowds change hour by hour, so the busiest hours set how many people are needed.

Why a generic structure scores lower

Forcing a familiar list onto an unfamiliar question shows the interviewer you memorised rather than understood. A simple model of the system scores higher.

Crack any case in five moves

Finding and narrowing the real problem

Do not force a familiar list onto an unfamiliar problem. Clarify the objective, build a simple model of the system, find the levers the model shows, and choose the cheapest one to test first.

Names you may hear, kept as questions that fall out of the goal maths

  • First-principles structure: What is the goal, and what simple equation describes the system? Split it your own way and reason step by step. Where it stops helping: Slower than a template, but the only honest approach when nothing fits.
  • Objective and options: Name the objective, generate options from the levers in your equation, and judge each against the goal. Where it stops helping: Generating good options under pressure takes practice.

Methods for solving this type

  • Clarify the objective
  • Build a simple model of how the system works
  • Use the model to find the levers
  • Rank the levers by effect and cost and state your assumptions

The math patterns it relies on

  • Whatever the problem needs, built from scratch
  • Wait = number waiting / service rate
  • Simple comparisons of options

Worked cases

Worked case

Cutting a theme-park queue

Case

A popular roller coaster at a theme park in Abu Dhabi serves 1,200 people an hour, and at peak its queue holds about 2,400 people. Guest ratings for the ride have fallen, and complaints mention waits of well over an hour. How the queue builds and falls through the day is in the chart. The park's head of operations asks how long the peak wait is, and how to cut it.

Interviewer-led: the interviewer shows the queue chart and asks for the peak wait, then for levers, then for which lever to test first.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation
  • What kind of ride is it?

    What the interviewer says

    The park's newest roller coaster, with trains of 24 seats. Counting its stops, it serves 1,200 people an hour on average.

History
  • When did the waits become a problem?

    What the interviewer says

    Since the ride opened last year. It is the park's most popular ride.

Objective
  • What is the goal: shorter waits, more riders, or happier guests?

    What the interviewer says

    Happier guests. Waits over an hour hurt the park's ratings; the link is in the second exhibit.

Financials
  • Does the ride earn money on its own?

    What the interviewer says

    No. Guests pay one entry ticket. Ratings drive repeat visits and annual-pass sales.

Customers
  • Who rides it?

    What the interviewer says

    Mostly teenagers and young adults, many of them visitors from abroad who come for one day.

  • Would guests accept a timed return ticket?

    What the interviewer says

    A survey says about half of peak guests would take one if the return slot were within a few hours.

Competitors
  • What do other parks do?

    What the interviewer says

    Many large parks use timed return tickets or virtual queues for their busiest rides.

Operations
  • Is the ride running at full capacity?

    What the interviewer says

    Mostly, but it stops about 10 percent of the time for safety checks.

  • Could we add seats?

    What the interviewer says

    A third train could be added, but it takes about nine months and costs about AED 8 million.

  • What is the queue area like?

    What the interviewer says

    Only half of it is shaded, and midday temperatures pass 40 degrees in summer.

Constraints
  • Is there anything we cannot change?

    What the interviewer says

    Safety checks cannot be shortened, only moved in time. The park will not sell paid queue jumps.

Exhibits

Exhibit 1
Queue length at the ride through the day (people)(people in the queue)

Line chart: Queue length at the ride through the day (people). Values in people in the queue. 10:00: 800; 12:00: 2,400; 14:00: 2,000; 16:00: 1,200; 18:00: 600.

Exhibit 2
Guest rating of the ride by wait time (out of 5)(rating out of 5)

Bar chart: Guest rating of the ride by wait time (out of 5). Values in rating out of 5. Waited under 30 minutes: 4.6; Waited 30 to 60 minutes: 4.2; Waited over 60 minutes: 3.4.

Source: illustrative guest survey, last three months.

Solution

Show the solution
Hypothesis

The wait depends on how many people are ahead and how fast they are served. My hypothesis is that the fastest improvement comes from spreading peak demand, since building capacity is slow and costly.

Structure
  • Wait = queue length / service rateThis comes from wait = queue length / service rate: serve faster, spread arrivals, or change how the wait feels.
    • Serve faster: less downtime, faster loading, more seats
    • Key: Spread arrivals: timed return tickets, off-peak incentives
    • Change how the wait feels: shade, entertainment, accurate signs
Analysis
  1. 1. Estimate the wait

    2,400 people in line and 1,200 served an hour.

    Wait (hours): 2,400 ÷ 1,200 = 2

  2. 2. Lever 1: remove downtime

    If the ride stopped for checks outside peak hours instead, it would serve 1,200 / 0.9 people an hour at peak, and the wait would fall only a little.

    Wait without downtime (hours): 2,400 ÷ (1,200 ÷ 0.9) = 1.8

  3. 3. Lever 2: timed return tickets

    If half the peak queue takes a timed return ticket instead of standing in line, 1,200 people remain, provided return slots are set in quieter hours. Otherwise returners take capacity from the standby line.

    Wait with timed tickets (hours): 1,200 ÷ 1,200 = 1

  4. 4. Where the quiet hours are

    Read the chart: at 18:00 only 600 people are queuing, a wait of about 30 minutes, so return slots belong in the late afternoon and evening.

    Wait at 18:00 (minutes): 600 ÷ 1,200 × 60 = 30

  • Exhibit 1: The queue is four times longer at midday than in the early evening, so there is quiet capacity later in the day to move guests into.
  • Exhibit 2: Ratings drop most once the wait passes an hour, so getting the peak wait to about an hour matters most.
Recommendation

Pilot timed return tickets first, and move safety checks out of peak hours in parallel. First, the wait is about two hours, and removing downtime alone cuts it only to about 1.8 hours. Second, timed tickets for half the peak queue cut the physical wait to about one hour at low cost, provided return slots are set in quieter hours. Otherwise returners take capacity from the standby line. Third, the chart shows those quieter hours exist: by 18:00 the queue is only 600 people, a wait of about 30 minutes. Beyond these two structural levers, a third changes how the wait feels: shade, entertainment, and accurate wait-time signs. The move in play is smoothing demand rather than adding capacity. A ride's capacity is fixed and costly to raise: a third train would take about nine months. Guest ratings fall sharply once waits pass an hour, so moving guests into quiet hours is the cheapest fix.

Risks
  • Guests may dislike booking return times
  • Timed tickets can move the crowd to other rides
Next steps
  • Pilot timed tickets on this ride for two weekends
  • Measure guest ratings before and after
Strong and weak answers

A strong candidate

Built a simple model from scratch, used it to find and size the levers, and picked a cheap pilot first.

A weak candidate

Listed random ideas (music, an app, more staff) with no model and no sense of which would help most.

Worked case

Crowding on a Tokyo rail platform

Case

A Tokyo rail operator has dangerous crowding on one station platform during the weekday morning peak. When the platform gets too full, staff close the ticket gates, which delays trains across the line. The station serves a business district where several large offices have opened in recent years. The operator's head of stations asks how to fix the crowding.

Candidate-led: no familiar type fits this. You build your own flow model and ask for the numbers; the interviewer answers and challenges.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What exactly is the problem: safety, delays, or comfort?

    What the interviewer says

    Safety first. When the platform is too full, staff must close the ticket gates, which causes delays across the line.

History

  • How long has this been happening?

    What the interviewer says

    It has grown worse over three years, as two new office towers opened near the station.

Objective

  • What does the operator want?

    What the interviewer says

    To keep the platform within its safe limit every weekday, at the lowest cost.

Financials

  • Is there a budget?

    What the interviewer says

    No fixed budget. Large projects go into the five-year investment plan.

Customers

  • How many people arrive in the peak?

    What the interviewer says

    About 18,000 in the peak hour, mostly office workers with season tickets. Arrivals in each quarter hour are in the exhibit.

  • How many already travel before the peak?

    What the interviewer says

    About 5,000 people enter the station before 7:30 on a typical weekday.

  • Can office workers change their start times?

    What the interviewer says

    About a third of nearby employers offer flexible start times, but few staff use them.

Competitors

  • Is there another line people could use?

    What the interviewer says

    A subway line two blocks away has some spare room, but another company runs it.

Operations

  • How often do trains come, and how many can each take from this station?

    What the interviewer says

    One every 3 minutes, with room for about 800 more passengers each.

  • How many people can the platform hold safely?

    What the interviewer says

    About 1,500.

  • Could we run more or longer trains?

    What the interviewer says

    A new signaling system would allow a train every 2.5 minutes, for about JPY 3 billion. Longer trains are not possible, because platforms elsewhere on the line are too short.

Constraints

  • Is this every weekday, and for how long?

    What the interviewer says

    Every weekday, about 245 a year, for about one hour of the morning peak.

Exhibit

Exhibit 1

People entering the station in each quarter hour of the morning peak(people)

Bar chart: People entering the station in each quarter hour of the morning peak. Values in people. 8:00 to 8:15: 4,200; 8:15 to 8:30: 4,800; 8:30 to 8:45: 5,000; 8:45 to 9:00: 4,000.

Source: illustrative ticket-gate counts, average weekday. Trains take about 4,000 people in each quarter hour.

Solution

Show the solution

Hypothesis

A platform fills up when people arrive faster than trains take them away. My hypothesis is that trains cannot carry the peak flow, so people build up on the platform, and that moving some trips out of the peak is cheaper than adding train capacity.

Structure

  • People on the platform = arrivals minus people the trains take awayThis comes from people waiting = people arriving minus people the trains carry away.
    • Arrivals per hour at the peak
    • Key: Train capacity: trains per hour x free space per train
    • Levers: more trains, longer trains, or fewer peak arrivals
    • Cost and speed of each lever

Analysis

  1. 1. Train capacity

    Candidate: "How often do trains come, and how many people can each take from this station?" Interviewer: "One every 3 minutes, with room for about 800 more passengers each."

    Passengers the trains can take (per hour): 60 ÷ 3 × 800 = 16,000

  2. 2. The gap

    Interviewer: "About 18,000 people arrive in the peak hour." Candidate: "Then about 2,000 more people arrive each hour than the trains can take."

    Excess arrivals (per hour): 18,000 - 60 ÷ 3 × 800 = 2,000

  3. 3. People on the platform

    Between trains, about 900 people arrive; over the hour, the extra 2,000 build up on top. That is almost twice the safe limit of 1,500.

    People waiting at the end of the peak: 18,000 ÷ 20 + (18,000 - 60 ÷ 3 × 800) = 2,900

  4. 4. How many trips must move

    Candidate: "To stay within train capacity, this share of peak trips would have to move outside the peak."

    Share of peak trips to move (%): (18,000 - 16,000) ÷ 18,000 × 100 = 11.11

  5. 5. Cost of an off-peak discount

    Candidate: "What if people who enter this station before 7:30 get JPY 40 off that morning trip?" Interviewer: "About 5,000 people already travel then and would get it too, and we run about 245 working days a year."

    Yearly cost of the discount (JPY): (2,000 + 5,000) × 40 × 245 = 68,600,000

  6. 6. Compare with more trains

    Interviewer: "A new signaling system would allow a train every 2.5 minutes, for about JPY 3 billion." Candidate: "That is the cost of more than 40 years of the discount."

    Years of discount equal to the signaling cost: 3,000,000,000 ÷ ((2,000 + 5,000) × 40 × 245) = 43.73

  • The exhibit: Arrivals beat what the trains can take in three of the four quarter hours, so the crowd builds until about 8:45.

Recommendation

I recommend an off-peak fare incentive and better crowd control now, with the signaling upgrade kept in the long-term plan. First, trains can take about 16,000 people an hour but 18,000 arrive, so about 2,900 are waiting by the end of the peak. Second, moving about 11 percent of peak trips closes the gap, and a JPY 40 early-travel discount costs about JPY 69 million a year. Third, the upgrade costs as much as more than 40 years of the discount, so it makes sense only if demand keeps growing. The move in play is managing peak demand with price before building capacity. A railway's capacity is set by its busiest hour and is very costly to raise. Moving a small share of trips out of that hour is worth far more than its fare discount. Test the discount for three months.

Risks

  • Fewer people may change their travel time than needed, because work start times are fixed
  • Crowding may move to the next station on the line
  • Peak demand may keep growing, bringing the upgrade forward

Next steps

  • Ask the three largest employers near the station about flexible start times
  • Run the discount trial and track arrivals every five minutes
  • Include the signaling upgrade in the five-year investment plan

Strong and weak answers

A strong candidate

Built a flow model from the goal, found the exact gap, turned it into the number of trips to move, and compared a cheap lever with an expensive one on cost.

A weak candidate

Suggested more staff to push passengers onto trains and nicer signs, with no model of why the platform fills up.

Prompt: "How would you reduce this queue?"

Weaker answer

Offers ten ideas (more staff, an app, signs, music) with no model of what drives the wait.

Stronger answer

Estimates the wait from queue length and service rate, uses the model to size three kinds of lever, and picks timed tickets as the cheap first pilot.

Why the stronger answer wins: The strong answer builds a model from first principles and finds the real levers. The weak one brainstorms without understanding the system.

Common mistakes, traps, and curveballs

  • Forcing a familiar list onto a new problem
  • Freezing because no template fits
  • Over-engineering a simple question
  • Refusing to commit to an answer
  • Treating the first two levers found as the only ones

How firms often vary on this type

Any firm can use a non-standard prompt, sometimes late in a case, to see how you handle the unfamiliar. Calm, first-principles reasoning is what is being tested. Formats differ by office and change over time, so check the current process for your target office.

Practice

Timed math drill

A bank branch in Singapore serves 40 customers an hour and has 20 people waiting. About how long is the wait, in minutes?

Timed math drill

A stadium in the Gulf holds 60,000 fans. It has 20 exit gates, and each gate lets out about 1,500 people an hour. How many hours does it take to empty?

Timed math drill

A food truck in Sydney serves one customer every 90 seconds, and 12 people are in line. About how long does the last person wait, in minutes?

Quick check

An interviewer asks where a growing city should put its next fire station, a question that fits no case type. What is the best first step?

Quick check

You built a model and the interviewer says one of your inputs is wrong. What is the strongest response?

Quick check

Asked how many ambulances a city needs, what is the best first step?

The one thing to remember

When nothing fits, clarify the objective, build a simple model of the system, and let the model show you the levers.

Next module: Digital and AI transformation

Sources

Math checked, facts checked against sources on 16 June 2026.

  • Recognized public explanations of case-interview concepts and terms

Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.