A parcel hub in Dubai that cannot cope with peak season
Worked case with 14 questions and 2 exhibits
Case
Interviewer: "A delivery company runs a parcel hub in Dubai, open 20 hours a day. In the 90-day peak season, 200,000 parcels arrive a day. The hub cannot handle them all, so the overflow goes to a subcontractor at AED 5 more per parcel. Management wants to buy an automated sorter for AED 40 million. What do you recommend?" (Fictional company, illustrative figures.)
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the company do?
What the interviewer says
It delivers parcels for online shops across the UAE, all through this one hub.
Is anything else changing in the business?
What the interviewer says
It is replacing a third of its vans with electric vans this year.
History
How has peak volume grown?
What the interviewer says
The second exhibit shows peak daily volume over three years and the forecast range for next year.
Objective
What is management's goal?
What the interviewer says
Stop paying for overflow at the lowest total cost. Projects must pay back within 5 years.
Financials
What does overflow cost?
What the interviewer says
The subcontractor charges AED 5 more per parcel than handling it in the hub.
What would the sorter cost and save?
What the interviewer says
AED 40 million to buy and AED 3 million a year to run. It adds 6,000 parcels an hour and saves about AED 4 million a year of manual sorting outside the peak.
Market
What is the forecast for the next peak?
What the interviewer says
Between 175,000 and 220,000 parcels a day, depending on how fast online shopping grows.
Customers
Who are the main customers?
What the interviewer says
Three online marketplaces give 65 percent of volume, on contracts renewed each year.
Competitors
What are rivals doing?
What the interviewer says
A rival opened an automated hub in Jebel Ali last year.
Operations
What can each step handle?
What the interviewer says
Unloading 12,000 parcels an hour, manual sorting 8,000, and loading vans 11,000.
Why do the sorting lines run at 8,000 an hour?
What the interviewer says
They lose about an hour in eight to jams and restarts.
What would it cost to cut the jams?
What the interviewer says
An engineering firm quotes AED 2 million for new chutes and training. It expects sorting to reach 9,000 an hour.
What is volume outside the peak?
What the interviewer says
About 120,000 parcels a day, which the hub handles easily.
Constraints
How long would the sorter take to install?
What the interviewer says
About 12 months. The hub must keep running during the work.
Exhibits
Exhibit 1
| Step | Parcels per hour | Parcels per day (20 hours) |
|---|---|---|
| Unload trucks | 12,000 | 240,000 |
| Sort (manual lines) | 8,000 | 160,000 |
| Load delivery vans | 11,000 | 220,000 |
Source: illustrative.
Exhibit 2
Bar chart: Peak daily volume at the Dubai hub (parcels a day). Values in parcels a day. Two years ago: 150,000; Last year: 175,000; This year: 200,000; Next year, low forecast: 175,000; Next year, high forecast: 220,000.
Source: illustrative.
Solution
Show the solutionHide the solution
Structure
- Overflow cost = (peak demand minus hub output) x peak days x AED 5
- Hub output = the lower of demand and the slowest step
- Key: Cheap fix first: raise the sorting lines' OEE
- Then the sorter: net saving and payback
- Downside: what if peak volume is lower?
Analysis
1. Pin the question and find the bottleneck
The goal is to stop paying for overflow at the lowest total cost. Output is the lowest of demand and the three steps; sorting limits the hub.
Hub output today (parcels a day): min(200,000; 12,000 × 20; 8,000 × 20; 11,000 × 20) = 160,000
2. Cost of the problem
40,000 overflow parcels a day, for 90 days, at AED 5 each, in AED millions.
Overflow cost a year (AED millions): (200,000 - 160,000) × 90 × 5 ÷ 1,000,000 = 18
3. Cheap fix first
The interviewer says the lines lose about an hour in eight to jams and restarts. Fixing chutes and training (AED 2 million once) lifts sorting from 8,000 to 9,000 an hour.
Overflow cost after the fix (AED millions): (200,000 - 9,000 × 20) × 90 × 5 ÷ 1,000,000 = 9
4. Payback of the cheap fix
AED 2 million against AED 9 million saved a year, in months.
Payback of the fix (months): 2 ÷ (18 - 9) × 12 = 2.67
5. The sorter after the fix
It adds 6,000 an hour. That removes the remaining AED 9 million of overflow and saves AED 4 million a year of manual sorting outside the peak. It costs AED 3 million a year to run.
Net saving of the sorter (AED millions a year): 9 + 4 - 3 = 10
6. Payback of the sorter
AED 40 million divided by 10 million a year.
Payback of the sorter (years): 40 ÷ (9 + 4 - 3) = 4
7. Downside: peak of 175,000 a day
After the cheap fix the hub handles 180,000, so there is no overflow left for the sorter to remove. Only the AED 4 million labour saving is left, minus AED 3 million to run.
Payback of the sorter in the downside (years): 40 ÷ (max(0; 175,000 - 9,000 × 20) × 90 × 5 ÷ 1,000,000 + 4 - 3) = 40
8. The next limit
With the fix and the sorter, sorting reaches 15,000 an hour, and loading becomes the slowest step.
Hub capacity with the sorter (parcels a day): min(12,000; 9,000 + 6,000; 11,000) × 20 = 220,000
9. What a peak hour of sorting is worth
Each hour the sorting lines stop in peak sends 8,000 more parcels to the subcontractor.
Cost of one lost sorting hour in peak (AED): 8,000 × 5 = 40,000
10. Upside: peak of 220,000 a day
After the cheap fix, overflow is back to 40,000 a day. The sorter, with loading at 220,000, removes all of it.
Payback of the sorter in the upside (years): 40 ÷ ((220,000 - 9,000 × 20) × 90 × 5 ÷ 1,000,000 + 4 - 3) = 2.11
- Exhibit 1: Sorting is the bottleneck at 160,000 a day, 40,000 short of peak demand.
- Exhibit 2: Peak volume has grown 25,000 a day each year, but next year could fall back or keep rising.
Recommendation
Do the cheap fix now, and decide on the sorter only when volume justifies it. Cutting jams on the manual sorting lines costs AED 2 million. It halves the overflow bill from AED 18 million to 9 million a year and pays back in under three months. The sorter would then pay back in about 4 years if peak demand stays at 200,000 a day. If peak volume settles at 175,000, it would take about 40 years, because the repaired manual lines already cope. The main risk is volume, so set a signpost: order the sorter once peak days pass 180,000 parcels. When it comes, loading vans becomes the next limit at 220,000 a day, so plan that step too. Parcel hubs carry high fixed costs and a sharp seasonal peak, so paying a subcontractor for overflow keeps that cost variable. Automation turns it into a fixed cost, which pays only if the peak stays high: at 220,000 a day the sorter pays back in about 2 years.
Risks
- Peak volume may settle near 175,000 a day, which leaves the sorter with little to do
- Jams may creep back if chute repairs and training are not kept up
- The sorter takes about 12 months to install while the hub keeps running, which risks disruption in one peak
- Three marketplaces give 65 percent of volume on yearly contracts, so losing one would cut peak volume fast
Next steps
- Approve the AED 2 million fix now so it is in place before the next peak
- Measure sorting speed weekly to confirm it holds at 9,000 an hour
- Set the signpost: order the sorter once peak days pass 180,000 parcels
- Start planning more van loading capacity, the next limit at 220,000 a day
Strong and weak answers
A strong candidate
Found sorting as the bottleneck from the table. Put a money value on the problem (AED 18 million a year). Fixed the cheapest thing first. Then judged the sorter on payback and on a downside, and named the next bottleneck.
A weak candidate
Calculated the sorter's payback at the planned volume and said yes. Did not check whether a cheaper fix could close most of the gap, or what happens if volume is lower.