First, estimate how many public fast chargers New Zealand needs when 10 percent of its cars and vans are electric. Then: Southlight Charging, a New Zealand charging company, is thinking about building a six-charger site on a main highway. Should it build?

Difficulty: Stretch. Format: market-sizing opener, then a business question. Industry: Energy and transport. Region: New Zealand. Interview length: about 35 minutes. The company is fictional and all figures are illustrative.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • Who is Southlight?

    What the interviewer says

    A New Zealand company running 40 fast-charging sites, mostly in cities.

History

  • How busy are its existing sites?

    What the interviewer says

    City sites are in use about 12 to 15 percent of the time. Its two highway sites run at about 6 to 9 percent.

Objective

  • What test must a new site pass?

    What the interviewer says

    Payback within seven years.

Financials

  • What are the site's costs and prices?

    What the interviewer says

    A six-charger site costs NZD 1.2 million, including the grid connection. Southlight sells power at NZD 0.75 per kWh, pays NZD 0.35 per kWh for electricity and network charges, and spends NZD 60,000 a year on other running costs.

Market

  • Which vehicles, and what share will be electric?

    What the interviewer says

    Cars and vans. Use about 4 million light vehicles (rounded, illustrative) and plan for the point when 10 percent are electric.

  • How much energy does an electric car use, and where is it charged?

    What the interviewer says

    About 2,000 kWh a year. About 10 percent of that comes from public fast chargers; the rest is charged at home or at work.

Customers

  • Who would use this highway site?

    What the interviewer says

    Holiday traffic and regional drivers. The exhibit shows expected use by month.

Competitors

  • Are there other chargers on this highway?

    What the interviewer says

    One older 50 kW site 80 km north. No other fast chargers within 150 km.

Operations

  • How busy is a typical fast charger?

    What the interviewer says

    A 150 kW charger is in use, on average, about 10 percent of the hours in a year.

Constraints

  • Can the grid supply the site?

    What the interviewer says

    The local network can supply 900 kW here, enough for six chargers at full power.

  • Is there a government grant?

    What the interviewer says

    Assume none for this site.

  • Is there a business next to the site?

    What the interviewer says

    A service station with a café is next door and is open to a deal.

Exhibit

Exhibit 1

Expected use of the highway site by month, first year (illustrative)(%)

Line chart: Expected use of the highway site by month, first year (illustrative). Jan: 14 percent; Feb: 9 percent; Mar: 6 percent; Apr: 7 percent; May: 4 percent; Jun: 4 percent; Jul: 5 percent; Aug: 4 percent; Sep: 4 percent; Oct: 5 percent; Nov: 5 percent; Dec: 5 percent.

Source: illustrative figures for practice, from Southlight's traffic counts. Use is the share of hours a charger is busy.

Solution

Show the solution

Hypothesis

Electric cars mostly charge at home, so the need for public fast chargers is modest. My hypothesis is that New Zealand needs a few hundred fast chargers at that point, and that a highway site pays back only if it is busy enough.

Structure

  • Size the need, then test one site
    • Electric vehicles x energy per vehicle x share charged at fast chargers
    • Energy one charger delivers in a year
    • Key: Site cash flow and payback
    • How busy the site must be

Analysis

  1. 1. Electric vehicles

    10 percent of about 4 million light vehicles.

    Electric vehicles: 4,000,000 × 0.1 = 400,000

  2. 2. Energy from public fast chargers

    400,000 vehicles x 2,000 kWh x 10 percent.

    Fast-charging energy (kWh a year): 4,000,000 × 0.1 × 2,000 × 0.1 = 80,000,000

  3. 3. Energy per charger

    150 kW, in use 10 percent of the 8,760 hours in a year.

    Energy per charger (kWh a year): 150 × 0.1 × 8,760 = 131,400

  4. 4. Chargers needed

    Total fast-charging energy divided by what one charger delivers: roughly 600.

    Fast chargers needed: 4,000,000 × 0.1 × 2,000 × 0.1 ÷ (150 × 0.1 × 8,760) = 609

  5. 5. Site cash flow

    Six chargers at 10 percent use and a margin of NZD 0.40 per kWh, minus NZD 60,000 of running costs.

    Yearly cash (NZD): 6 × 150 × 0.1 × 8,760 × (0.75 - 0.35) - 60,000 = 255,360

  6. 6. Payback

    NZD 1.2 million divided by the yearly cash.

    Payback (years): 1,200,000 ÷ (6 × 150 × 0.1 × 8,760 × (0.75 - 0.35) - 60,000) = 4.7

  7. 7. Curveball: a quieter highway

    Interviewer: "Traffic data shows this highway is busy on holidays and quiet the rest of the year. Expect only 6 percent use for the first years."

    Payback at 6 percent use (years): 1,200,000 ÷ (6 × 150 × 0.06 × 8,760 × (0.75 - 0.35) - 60,000) = 9.29

  8. 8. Use needed for a seven-year payback

    The site must earn NZD 1.2 million divided by 7 each year, plus its running costs, from a margin of NZD 0.40 per kWh.

    Use needed (%): (1,200,000 ÷ 7 + 60,000) ÷ (0.75 - 0.35) ÷ (6 × 150 × 8,760) × 100 = 7.34

  9. 9. What one point of use is worth

    For a six-charger site, each extra point of use adds:

    Cash per point of use (NZD a year): 6 × 150 × 8,760 × 0.01 × (0.75 - 0.35) = 31,536

  • The exhibit: Summer holidays are busy, but most months run at 4 to 5 percent, so the yearly average is only 6 percent.

Recommendation

On these illustrative inputs, New Zealand needs roughly 600 public fast chargers when 10 percent of its cars and vans are electric. Southlight should build this site, but in stages. First, at 10 percent use a six-charger site earns about NZD 255,000 a year and pays back in about 4.7 years. Second, if the highway is quiet outside holidays and use is only 6 percent, payback stretches to about 9.3 years, beyond Southlight's seven-year rule. Third, the site needs about 7.3 percent use to pay back in seven years, so the decision depends on traffic. Install two chargers now with a grid connection sized for six, and add chargers as use passes about 7 percent. Look for a host business such as a service station or café to share costs. Charging economics are almost all about use: the equipment is a fixed cost, so each point of use is worth about NZD 31,500 a year to a six-charger site. A staged build is a real option: Southlight pays for capacity only when traffic proves it. It also gets there first, on a highway with no other fast charger within 150 km. The service station next door is the natural host, and its café gives drivers a reason to stop.

Risks

  • Holiday peaks may leave drivers queuing even when average use is low
  • Electricity network charges could rise

Next steps

  • Get traffic counts by month for the highway
  • Ask the network company for the cost of a connection sized for six chargers

Strong and weak answers

A strong candidate

Built a clear sizing chain, then tested the site on payback and found the use level it needs before recommending a staged build.

A weak candidate

Gave a charger count with no steps, then said "build, because electric cars are growing," without testing how busy the site would be.

Sources
Facts checked against sources on

Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.