So What Club

Sustainability and decarbonization

Cutting emissions at the lowest cost and managing carbon costs: emission scopes, cost per tonne, abatement curves, carbon prices, and EU border charges.

20 min

What this case type is and when it shows up

A sustainability case asks how a company can cut its greenhouse-gas emissions, usually to meet a target (for example 40 percent lower by 2030), at the lowest cost, or how carbon costs and customer demands affect its business. It is common in energy, industry, transport, and consumer goods, and often mixes with cost, investment, or market-entry questions.

Measure where the emissions are, rank the ways to cut them by cost per tonne, take the cheapest first until the target is met, and compare the rest with the carbon price the company faces.

The underlying theory, in plain language

Emissions are measured in tonnes of carbon dioxide equivalent (tCO2e) and grouped into three scopes. Scope 1: direct emissions from the company's own operations, such as burning gas in a furnace. Scope 2: emissions from the electricity and heat it buys. Scope 3: all other emissions in its value chain, such as suppliers making its materials or customers using its products. Scope 3 is often the largest and the hardest to change.

The cost of a lever per tonne (abatement cost) is its extra yearly cost (the investment spread over its life as a yearly amount, plus any change in running cost) divided by the tonnes it avoids each year. A negative cost means the lever saves money, for example efficiency. A marginal abatement cost curve (MACC) lists levers from cheapest to most expensive, with the tonnes each one avoids.

A carbon price makes emitting costly. In the EU emissions trading system, large emitters must surrender one allowance for each tonne they emit; some allowances are received free and the rest are bought. A lever that costs less per tonne than the carbon price pays for itself. The EU carbon border adjustment mechanism (CBAM) charges importers of goods such as steel, aluminum, cement, and fertilizers for the carbon embedded in those goods, at the EU carbon price, minus any carbon price already paid in the country of origin. It phases in as EU free allocation is withdrawn: a deduction linked to the free allowances EU producers still receive (set by an EU benchmark for each product) shrinks each year. In 2026 only 2.5 percent of that deduction is removed, so importers pay mainly on emissions above the benchmark, and the deduction reaches zero in 2034, when the full charge applies to all embedded emissions. The rules are still phasing in and may change, so always check the current schedule.

There can also be upside: some customers pay more for low-carbon products (a green premium), and cheaper clean power can lower costs. Large clean-energy projects, such as green hydrogen made with solar and wind power in the Gulf, depend heavily on the cost of electricity and on long-term buyers.

What the prompts sound like, from simple to hard

  • Simple: how can a UK supermarket chain cut its electricity emissions.
  • Medium: a German steel-components maker must cut emissions 40 percent by 2030 at the lowest cost.
  • Hard: judge the economics of a large green hydrogen project in the Gulf, of the kind planned in Oman or at NEOM in Saudi Arabia, using illustrative figures.

Build the structure from the goal

Three moves that give you the structure

  1. Start from the decision. How does the client reach its emissions target, by when, at the lowest cost, and what does a carbon price do to its business?
  2. Write the maths of the goal. Tonnes to cut = baseline x target share. Cost of the plan = the sum of tonnes cut x cost per tonne for each lever, taking the cheapest first until the target is met. Exposure = tonnes emitted x carbon price, compared with margin.
  3. Let the business pick the branches. The industry tells you where the emissions are. A steel or cement maker emits most from its own furnaces and kilns. An office-based firm emits most through bought electricity and travel. A retailer or food brand emits most through its suppliers and farms, which it does not control directly.
Same type, different case 1: a supermarket chain with a net-zero pledge
  • Cheapest path to the target
    • Key: Baseline: suppliers and farms are most of the total
    • Own stores: refrigerant leaks and electricity
    • Delivery trucks
    • Supplier programs: cost per tonne, and who pays

This comes from cost = tonnes cut x cost per tonne, cheapest first. A retailer's emissions sit mostly with its suppliers, so that branch leads.

Same type, different case 2: a cement maker facing a rising carbon price
  • Exposure, and the cheapest cuts
    • Key: Exposure: tonnes x carbon price versus margin per tonne
    • Clinker share: blend in other materials
    • Fuel switch in the kiln
    • Carbon capture: cost per tonne versus the carbon price

Same maths, a different industry. Most cement emissions come from the chemistry of making clinker, so exposure and clinker share come first.

Why a generic structure scores lower

Listing every green technology, led by the most exciting one, never ranks cost per tonne. Interviewers score the cheapest path to the target.

Crack any case in five moves

Finding and narrowing the real problem

Start from the baseline by scope, rank levers by cost per tonne, fill the target with the cheapest ones, and test the expensive ones against the carbon price and any green premium.

Cut emissions to target at the lowest cost
  • Reach the emissions target at the lowest cost
    • Baseline by scope
      • Scope 1: own fuel use
      • Scope 2: bought electricity and heat
      • Scope 3: suppliers and product use
    • Key: Levers ranked by cost per tonne
      • Efficiency (often saves money)
      • Clean electricity
      • Process and fuel changes
      • Supplier and material changes
    • Carbon costs
      • Carbon price on own emissions
      • EU border charge on exports
    • Upside and risks
      • Green premium from customers
      • Technology and timing risk

The baseline tells you where to look; the cost per tonne tells you the order.

Names you may hear, kept as questions that fall out of the goal maths

  • Scope 1, 2, 3 baseline: Where do the emissions come from: our own fuel, the electricity we buy, or our suppliers and customers? The baseline is the first number in the goal maths. Where it stops helping: Scope 3 data is often rough; say how confident you are.
  • Abatement cost curve (MACC): What does each lever cost per tonne, and which cheapest set of levers meets the target? Where it stops helping: Costs change with energy prices and technology; levers can depend on each other.
  • Carbon cost exposure: How many tonnes do we pay for, at what carbon price, including border charges on exports, and how does that compare with margin? Where it stops helping: Rules and prices change; use scenarios.

Methods for solving this type

  • Build the baseline by scope
  • List levers with tonnes avoided and cost per tonne
  • Fill the target from the cheapest lever up
  • Compare expensive levers with the carbon price and any green premium
  • Check capital needs, timing, and technology risk

The math patterns it relies on

  • Target tonnes = baseline x percent cut
  • Cost per tonne = extra yearly cost / tonnes avoided
  • Carbon cost = tonnes x carbon price
  • Border charge at full phase-in = embedded emissions per unit x EU carbon price x units, minus carbon price paid at origin

Worked cases

Worked case

Cutting emissions 40 percent at a German steel-components maker

Case

A German maker of forged steel components emits 100,000 tonnes of CO2e a year (Scope 1 and 2). Its largest customers, two carmakers, now ask suppliers for a credible 2030 plan. The company must cut 40 percent by 2030 at the lowest cost, and the exhibit lists its options. The board asks which plan to adopt.

Interviewer-led: the interviewer shows the lever table and asks you to build the plan.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation
  • What does the company make, and where?

    What the interviewer says

    Forged steel parts for carmakers and machine builders, in two plants in Germany.

  • Anything else going on at the company?

    What the interviewer says

    It turns 100 this year and is installing a new planning system.

History
  • Have emissions changed recently?

    What the interviewer says

    They have stayed close to 100,000 tonnes a year for five years.

Objective
  • What exactly is the target?

    What the interviewer says

    A 40 percent cut in Scope 1 and 2 by 2030, against a baseline of 100,000 tonnes a year. Scope 3 comes later.

Financials
  • Where do the emissions come from?

    What the interviewer says

    60,000 tonnes are Scope 1, mostly gas burned in furnaces. 40,000 tonnes are Scope 2, from about 100 million kWh of grid electricity.

  • What carbon price applies?

    What the interviewer says

    Assume EUR 80 per tonne on Scope 1, likely rising. Lever costs in the exhibit leave out carbon savings.

Customers
  • What do customers ask for?

    What the interviewer says

    Two carmakers buy half the output. They want a credible 2030 plan but will not pay more for the parts.

Competitors
  • What are rivals doing?

    What the interviewer says

    One rival signed a renewable power contract last year.

Operations
  • What limits the bigger levers?

    What the interviewer says

    Electric furnaces need a grid connection upgrade, which takes about three years to approve and build.

Constraints
  • Is there a capital limit?

    What the interviewer says

    About EUR 10 million of capital spending is available for climate projects up to 2030.

Exhibits

Exhibit 1
Emission-cutting levers, ranked by cost per tonne (illustrative)
Emission-cutting levers, ranked by cost per tonne (illustrative)
LeverScope cutTonnes avoided a yearCost (EUR per tonne, before carbon savings)
Efficiency: heat recovery and controlsScope 110,000-40
Renewable electricity contractScope 230,00010
Electric furnaces for heat treatmentScope 125,00090
Hydrogen-ready burnersScope 115,000250
Exhibit 2
Baseline emissions by source (percent of 100,000 tonnes)(%)

Pie chart: Baseline emissions by source (percent of 100,000 tonnes). Gas in furnaces (Scope 1): 60 percent; Grid electricity (Scope 2): 40 percent.

Source: illustrative figures for teaching.

Solution

Show the solution
Hypothesis

The first cuts are usually cheap, through efficiency and clean electricity. My hypothesis is that the company can meet 40 percent with low-cost levers and does not need expensive process changes yet.

Structure
  • Fill the target with the cheapest levers firstThis comes from cost of the plan = tonnes cut x cost per tonne for each lever, cheapest first until 40 percent of the baseline is cut.
    • Target in tonnes
    • Key: Levers in order of cost per tonne
    • Cost of the plan
    • Next levers versus the carbon price
Analysis
  1. 1. Target in tonnes

    40 percent of the 100,000-tonne baseline.

    Tonnes to cut a year: 100,000 × 0.4 = 40,000

  2. 2. Cheapest levers first

    Efficiency (heat recovery and better controls, cutting gas use) saves money; renewable electricity through a long-term contract costs EUR 10 per tonne. Together they avoid:

    Tonnes from the two cheapest levers: 10,000 + 30,000 = 40,000

  3. 3. Yearly cost of the plan

    Efficiency saves EUR 40 per tonne; renewable power costs EUR 10 per tonne. A negative result means the plan saves money.

    Yearly cost of the plan (EUR): 10,000 × -40 + 30,000 × 10 = -100,000

  4. 4. Average cost per tonne

    The plan saves a little money on average.

    Average cost (EUR per tonne): (10,000 × -40 + 30,000 × 10) ÷ 40,000 = -2.5

  5. 5. Counting the carbon saved

    The lever costs exclude carbon. The 10,000 Scope 1 tonnes cut by efficiency also avoid EUR 80 each of carbon cost, EUR 800,000 a year. The plan's yearly saving including carbon:

    Yearly saving including carbon (EUR): -(10,000 × -40 + 30,000 × 10) + 10,000 × 80 = 900,000

  6. 6. Next lever at today's carbon price

    Electric furnaces cost EUR 90 per tonne but cut Scope 1 (assuming the extra electricity is renewable; otherwise Scope 2 rises), which carries the EUR 80 carbon price. Net cost for 25,000 tonnes:

    Net yearly cost of electric furnaces (EUR): 25,000 × (90 - 80) = 250,000

  7. 7. Next lever if the carbon price reaches EUR 100

    The same lever would then save money.

    Net yearly cost at EUR 100 (EUR): 25,000 × (90 - 100) = -250,000

  8. 8. Carbon cost today

    Why the carbon price matters: all 60,000 Scope 1 tonnes pay EUR 80 each.

    Carbon cost a year on Scope 1 (EUR): 60,000 × 80 = 4,800,000

  • Exhibit 1: The two cheapest levers avoid the full 40,000 tonnes needed and together save money. Electric furnaces are close to paying for themselves at today's carbon price; hydrogen burners are far from it.
  • Exhibit 2: Scope 2 can be cut by contract; Scope 1 needs changes inside the plant.
Recommendation

Meet the 40 percent target with efficiency and a renewable electricity contract. First, together they avoid the full 40,000 tonnes. Second, they save about EUR 100,000 a year before carbon savings. Counting EUR 800,000 of avoided carbon cost on the 10,000 Scope 1 tonnes, they save about EUR 900,000 a year. Third, they use proven technology and can be in place well before 2030. Prepare electric furnaces as the next step. At EUR 80 per tonne they cost about EUR 250,000 a year net, but they pay for themselves if the carbon price passes EUR 90. Leave hydrogen burners until costs fall. The move here is decarbonization in cost order: in energy-heavy industry, the first 40 percent is usually cheap, and the last cuts are where the money goes. Scope 1 already costs about EUR 4.8 million a year in carbon, so every tonne cut there is worth more over time.

Risks
  • Renewable power contracts depend on electricity prices and supply
  • Carbon prices may not rise as expected
  • Efficiency savings may be smaller than engineering estimates
  • Electric furnaces need a grid upgrade that takes about three years, so the trigger decision cannot wait long
Next steps
  • Tender for a 10-year renewable power contract
  • Run an energy audit to confirm the efficiency savings
  • Design electric furnaces and set a carbon-price trigger for the decision
  • Apply now for the grid connection upgrade so furnaces stay an option
Strong and weak answers

A strong candidate

Built from the baseline, filled the target from the cheapest lever, and tested the next lever against the carbon price.

A weak candidate

Recommended hydrogen because it sounds most advanced, the most expensive option per tonne.

Worked case

An Indian steelmaker and the EU carbon border charge

Case

An Indian steelmaker exports part of its output to the EU. Its steel, made in blast furnaces, carries about 2.5 tonnes of CO2 per tonne of steel. The EU carbon border charge is phasing in, and EU buyers have started asking who will pay it. The managing director asks how exposed the company is and what it should do.

Candidate-led: you drive; the interviewer answers what you ask. All figures are illustrative.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • How big is the steelmaker, and how much goes to the EU?

    What the interviewer says

    It makes about 5 million tonnes a year in blast furnaces. About 200,000 tonnes go to the EU.

  • How is the home market doing?

    What the interviewer says

    Its sales in India grew about 8 percent last year. A new port terminal near the main plant opened this year.

History

  • How have EU sales moved?

    What the interviewer says

    They grew from 120,000 tonnes three years ago to 200,000 tonnes now.

Objective

  • What does the board want?

    What the interviewer says

    To keep selling to the EU profitably, and a decision on any new furnace this year.

Financials

  • What do EU sales earn?

    What the interviewer says

    EUR 600 per tonne, with a margin of about 10 percent.

Market

  • How does the charge work?

    What the interviewer says

    Under Regulation (EU) 2023/956, importers pay for the CO2 embedded in steel. Assume EUR 80 per tonne of CO2 at full phase-in, due in 2034, with no carbon price paid in India.

Customers

  • Who pays in practice?

    What the interviewer says

    The EU importer pays, but expects the exporter to share the cost through lower prices. Buyers would pay about EUR 30 per tonne more for low-carbon steel.

Competitors

  • What are other exporters doing?

    What the interviewer says

    Several exporters to the EU from other countries are building scrap-based furnaces.

Operations

  • Is there a lower-carbon way to make the EU volume?

    What the interviewer says

    An electric arc furnace using scrap would emit about 0.6 tonnes of CO2 per tonne of steel. It would cost about EUR 150 million.

  • Is scrap available?

    What the interviewer says

    Partly. About 30 percent of the scrap would need to be imported.

Constraints

  • How long would a new furnace take?

    What the interviewer says

    About three years from approval to full output.

Exhibit

Exhibit 1

CO2 embedded in one tonne of steel, by route (tonnes)(tonnes of CO2 per tonne of steel)

Bar chart: CO2 embedded in one tonne of steel, by route (tonnes). Values in tonnes of CO2 per tonne of steel. Blast furnace today: 2.5; Electric arc furnace with scrap: 0.6.

The company's estimates for its own plants. Source: illustrative figures for teaching.

Solution

Show the solution

Hypothesis

Steel made in blast furnaces carries a lot of carbon. My hypothesis is that the border charge, once fully phased in, would be larger than the whole margin on EU exports, so the company must either cut emissions on that steel or sell it elsewhere.

Structure

  • Size the charge, compare with margin, and test the optionsThis comes from charge = tonnes sold to the EU x CO2 per tonne x carbon price, compared with the margin on those sales.
    • Charge per tonne and in total
    • Key: Charge versus margin on EU sales
    • Options: cut emissions, pass on cost, sell elsewhere

Analysis

  1. 1. Charge per tonne of steel

    Candidate: "At full phase-in the charge applies to all 2.5 tonnes of embedded CO2, at EUR 80 each:"

    Charge (EUR per tonne of steel): 2.5 × 80 = 200

  2. 2. Total yearly charge

    200,000 tonnes exported to the EU.

    Charge (EUR a year): 200,000 × 2.5 × 80 = 40,000,000

  3. 3. Compare with margin

    Candidate: "What do we earn on EU sales today?" Interviewer: "About 10 percent of EUR 600 per tonne." The charge is more than three times the whole margin.

    Margin on EU sales (EUR a year): 200,000 × 600 × 0.1 = 12,000,000

  4. 4. Option: lower-carbon route

    Candidate: "Is there a lower-carbon way to make the EU volume?" Interviewer: "An electric arc furnace using scrap would emit about 0.6 tonnes per tonne of steel and cost EUR 150 million." Candidate: "It would still pay the charge on 0.6 tonnes, EUR 48 per tonne of steel:"

    Remaining charge (EUR a year): 200,000 × 0.6 × 80 = 9,600,000

  5. 5. Yearly benefit

    Interviewer: "EU buyers would also pay about EUR 30 per tonne more for low-carbon steel." The charge saved plus the premium:

    Yearly benefit (EUR): 200,000 × (2.5 - 0.6) × 80 + 200,000 × 30 = 36,400,000

  6. 6. Payback

    Investment divided by the yearly benefit.

    Payback (years): 150,000,000 ÷ 36,400,000 = 4.12

  7. 7. Charge as a share of the price

    How much of the EUR 600 price the charge would eat if the exporter absorbed it all.

    Charge as a share of price (percent): 200 ÷ 600 × 100 = 33.33

  • The exhibit: The scrap route cuts embedded CO2, and so the border charge, by about three quarters.

Recommendation

I recommend that the steelmaker plan now for a lower-carbon route for EU sales. First, once fully phased in, the border charge of about EUR 40 million a year would be more than three times the EUR 12 million margin on EU exports. Second, a scrap-based electric arc furnace cuts the charge to about EUR 9.6 million and earns a green premium. That is a benefit of about EUR 36.4 million a year, with a payback of about 4.1 years. Third, the charge phases in until 2034, but steel this carbon-heavy pays on its emissions above the EU benchmark from the start. So the time to build is shorter than the end date suggests. Steel is a commodity with thin margins, so a charge worth a third of the price cannot be passed on or absorbed. Investing in a lower-carbon route is both a decarbonization move and a way to keep the EU market. Model the charge year by year.

Risks

  • Border-charge rules, deductions, and the phase-in schedule may change
  • Scrap supply and electricity prices affect the new furnace's cost
  • EU buyers may not pay the full green premium
  • Rival exporters building their own low-carbon furnaces may erode the premium

Next steps

  • Model the charge year by year under the current phase-in schedule
  • Secure scrap supply and a power contract for the new furnace
  • Talk to the top EU buyers about low-carbon steel contracts
  • Set up measurement and checks of embedded emissions, which EU importers must report

Strong and weak answers

A strong candidate

Sized the charge, compared it with margin, and tested a lower-carbon option with payback and phase-in timing.

A weak candidate

Said the charge "is the importer's problem" and ignored that it would be passed back through price.

Prompt: "How should we cut our emissions 40 percent?"

Weaker answer

Lists every green technology it knows, leads with hydrogen, and never compares costs per tonne.

Stronger answer

Starts from the baseline by scope, ranks levers by cost per tonne, meets the target with the two cheapest (saving about EUR 100,000 a year before carbon savings, and about EUR 900,000 a year once the EUR 800,000 of avoided carbon cost on the 10,000 Scope 1 tonnes is counted), and tests the next lever against the carbon price.

Why the stronger answer wins: The strong answer is ordered by cost and tied to the target. The weak one confuses ambition with a plan.

Common mistakes, traps, and curveballs

  • Mixing up the scopes
  • Starting with the most visible lever instead of the cheapest
  • Forgetting that some levers save money
  • Ignoring rising carbon prices when judging expensive levers
  • Treating uncertain rules as fixed
  • Promising targets with technology that is not yet ready

How firms often vary on this type

Sustainability questions appear across many industries, sometimes as the main case and sometimes as a twist in a cost or investment case. Firms with large sustainability practices may expect you to know the scopes and cost per tonne. Formats differ by office and change over time, so check the current process for your target office.

Practice

Timed math drill

A factory in Poland uses 20,000,000 kWh of grid electricity a year. Poland's grid, still heavy in coal, emits about 0.65 kg of CO2 per kWh (illustrative). What are its Scope 2 emissions, in tonnes a year?

Timed math drill

A lever at a UAE plant costs AED 2,000,000 a year more than today and avoids 25,000 tonnes a year. What is its cost per tonne, in AED?

Timed math drill

Illustrative figures for a green hydrogen project in Oman: making 1 kg of hydrogen uses about 50 kWh of electricity, and solar power costs about USD 0.03 per kWh. What is the electricity cost per kg of hydrogen, in USD?

Quick check

A company buys electricity from the grid. Which scope are the emissions from that electricity?

Quick check

A lever has a cost of minus EUR 30 per tonne. What does that mean?

Quick check

Carbon costs EUR 80 per tonne. A lever that cuts Scope 1 emissions costs EUR 60 per tonne. Should you do it on cost alone?

The one thing to remember

Start from the baseline by scope, cut the cheapest tonnes first, and judge expensive levers against the carbon price and any green premium.

Next module: Government and economic development

Sources

Math checked, facts checked against sources on 16 June 2026.

  • Recognized public explanations of case-interview concepts and terms