Lean basics as economics: waste, flow, and the hidden cost of inventory

What lean thinking removes, and why stock sitting between steps costs real money. Then how better flow frees cash in a factory in Vietnam and beds in a hospital in Abu Dhabi.

Lesson 3 of 8 · 12 min

The idea

Lean means doing only the work customers pay for and keeping that work flowing without waiting. The money shows up in three places. Lead times (the time from order to delivery) get shorter. Less cash is tied up in stock. And the same machines, beds or people produce more.

The word lean comes from studies of how Toyota builds cars. Toyota describes its production system as aiming at "the complete elimination of waste", and as resting on two pillars. Jidoka means stopping a machine or a line as soon as something goes wrong, so defects are not passed on. Just-in-time means making "only what is needed, when it is needed, and in the amount needed". You do not need the Japanese words in an interview. You need the economics behind them.

Waste in plain words (a list commonly used in lean training)

  • Making too much, or too early: goods made before anyone ordered them.
  • Waiting: people, machines or patients standing idle until the previous step finishes.
  • Moving things around: extra trips between buildings, shelves or wards.
  • Extra work: steps the customer does not value, such as entering the same data twice.
  • Stock: piles of materials or half-finished goods between steps.
  • Extra motion: walking and reaching because tools or files are in the wrong place.
  • Defects: work that must be thrown away or done again.
What a year of holding stock costs, as a share of the stock's value (illustrative)(percent of stock value a year)
What a year of holding stock costs, as a share of the stock's value (illustrative)
Cost of holding stockPercent a year
Cost of the money tied up (interest, or what the cash could earn elsewhere)10
Storage space and handling6
Damage, theft and goods going out of date4
Insurance and local taxes2
Total carrying cost22

So-what

Stock that sits for a year can cost around a fifth of its value. The exact share differs by business, so ask for it in a case; these figures are only an example.

Worked case

A parts factory in Vietnam moves from big batches to flow

Case

A factory in Bac Ninh, Vietnam makes 2,000 electronic parts a day. It runs big batches, so about 40,000 half-finished parts sit between steps. Each is worth USD 5 of materials and work, and finance puts the carrying cost at 22 percent a year. Making small batches and passing them straight on would cut the pile to 10,000 parts. What does flow gain? (Fictional factory, illustrative figures.)

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What does the factory make?

    What the interviewer says

    Small connectors for two phone assemblers nearby. Output is steady at 2,000 parts a day.

  • Who runs the plant?

    What the interviewer says

    A plant director who joined two years ago from a car parts plant in Korea.

History

  • Why does it run big batches?

    What the interviewer says

    Changeovers on the presses took 3 hours until last year. A project cut them to 30 minutes, but batches stayed at 5,000 parts.

  • Have quality problems been costly?

    What the interviewer says

    Last year a fault at the first step went unnoticed for 15 days. By then 30,000 parts had been made with it, and all were scrapped.

Objective

  • What does the director want?

    What the interviewer says

    To free cash and offer shorter delivery times. The larger customer has asked for orders to arrive in under 10 days.

Financials

  • What is a part worth?

    What the interviewer says

    A finished part sells for USD 8. A half-finished part holds about USD 5 of materials and work on average.

  • How is the 22 percent carrying cost built up?

    What the interviewer says

    Finance uses 10 percent for the cash tied up, 6 for space and handling, 4 for damage and scrap, and 2 for insurance.

Market

  • Is demand growing?

    What the interviewer says

    Volume is flat at 2,000 parts a day. Phone models change every year, so each part design lasts about 12 months.

Customers

  • How concentrated are the customers?

    What the interviewer says

    Two customers take 70 percent and 30 percent of output.

Competitors

  • What do rivals offer?

    What the interviewer says

    A rival in Thai Nguyen promises 7-day delivery. A large rival in Shenzhen competes mainly on price.

Operations

  • What are the steps?

    What the interviewer says

    Five: stamping, plating, moulding, assembly and test. Plating is the slowest, at 2,200 parts a day.

  • Where does the stock sit?

    What the interviewer says

    The exhibit with this case shows the parts waiting before each step, today and with flow.

Constraints

  • Are there limits on what can change?

    What the interviewer says

    No new machines this year. Workers are paid a monthly wage, not by the batch.

  • Does the factory need the floor space back?

    What the interviewer says

    Not now. The stock fills about 1,200 square metres, and no new product line is planned.

Exhibit

Exhibit 1

Half-finished parts waiting before each step (parts)
Half-finished parts waiting before each step (parts)
Waiting beforeTodayWith flow
Plating12,0004,000
Moulding10,0002,000
Assembly10,0002,000
Test8,0002,000
Total40,00010,000

Source: illustrative.

Solution

Show the solution

Structure

  • Gains from flow: lead time, cash freed, yearly carrying cost
    • Lead time = parts in the system / parts finished a day (Little's Law)
    • Key: Cash freed = parts removed x value per part
    • Yearly saving = cash freed x carrying cost

Analysis

  1. 1. Lead time before

    40,000 parts in the system, 2,000 finished a day.

    Lead time before (days): 40,000 ÷ 2,000 = 20

  2. 2. Lead time after

    10,000 parts in the system, still 2,000 a day.

    Lead time after (days): 10,000 ÷ 2,000 = 5

  3. 3. Cash freed

    30,000 fewer parts at USD 5 each, released once.

    Cash freed (USD): (40,000 - 10,000) × 5 = 150,000

  4. 4. Yearly saving

    22 percent of the stock no longer held.

    Carrying cost saved a year (USD): 150,000 × 0.22 = 33,000

  5. 5. What last year's late fault cost

    A fault at the first step went unnoticed for 15 days, so 15 days of parts were scrapped at USD 5 each.

    Scrap from the late-found fault (USD): 15 × 2,000 × 5 = 150,000

  6. 6. The same fault with flow

    With 5 days in the system, the fault shows up at test within about 5 days. Scrap from one such fault falls by two thirds.

    Scrap avoided on one fault (USD): (15 - 5) × 2,000 × 5 = 100,000

  7. 7. Buffer before the bottleneck

    Keep 4,000 parts in front of plating, the slowest step, so a short stop upstream does not starve it.

    Buffer before plating (days of output): 4,000 ÷ 2,000 = 2

  • The exhibit: Flow cuts every pile but keeps the largest one in front of plating, the slowest step.

Recommendation

The factory should move to flow, because it cuts the time a part spends in the factory from 20 days to 5. It frees USD 150,000 of cash once. It also saves about USD 33,000 a year in carrying cost (the yearly cost of holding stock). The bigger gains are often hidden. With 5 days in the system, a fault at the first step is found in days, not weeks. This means far fewer parts are made wrong. And the factory can promise customers shorter delivery times. The risk is a breakdown. With little stock between steps, one stopped machine stops the line. So keep a small buffer of stock in front of the bottleneck. The quality gain alone is large: last year's late fault scrapped USD 150,000 of parts, and flow would have saved about USD 100,000 of that. Parts makers for phones win orders on delivery time and quality, so a 5-day lead time beats the 10 days the larger customer asks for.

Risks

  • With little stock between steps, a breakdown upstream of plating can stop output within hours
  • Small batches mean more changeovers; if they creep back above 30 minutes, plating loses output
  • Staff used to long runs may resist the change, so output can dip in the first weeks

Next steps

  • Start with one product family and cut its batch size from 5,000 to 500 parts
  • Keep about 2 days of output (4,000 parts) in front of plating and watch it daily
  • Track lead time, half-finished stock and scrap every week
  • Offer the larger customer a shorter delivery promise once lead time holds near 5 days

Worked case

A hospital in Abu Dhabi where patients wait to go home

Case

A private hospital in Abu Dhabi has 200 beds, 90 percent full on average. Patients stay 5 days on average, but half a day of that is waiting to go home. Planning discharges the day before would cut the average stay to 4.5 days. Patients are on a waiting list, and each extra admission earns AED 3,000 of contribution. What is this worth? (Fictional hospital, illustrative figures.)

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What kind of hospital is it?

    What the interviewer says

    A private general hospital with 200 beds for surgery, maternity and medical care. Most patients are insured.

  • Is anything else changing at the hospital?

    What the interviewer says

    It is installing a new MRI scanner this year and refreshing its brand.

History

  • Has the length of stay changed?

    What the interviewer says

    It has been about 5 days for three years. An audit last quarter found patients wait half a day on average after they are fit to go home.

Objective

  • What does the board want?

    What the interviewer says

    More admissions, without new building if possible. It has a proposal for a new 40-bed wing.

Financials

  • What does an admission earn?

    What the interviewer says

    About AED 3,000 of contribution on average, after drugs, supplies and the staff costs that move with patients.

  • What does a new bed cost?

    What the interviewer says

    A bed in a new wing costs about AED 1.5 million to build and equip.

Market

  • Is there demand for more admissions?

    What the interviewer says

    About 600 patients wait for a planned admission at any time. The list has grown about 10 percent a year.

Customers

  • Who pays for an admission?

    What the interviewer says

    About 80 percent of admissions are paid by insurers, mostly at a fixed price per admission.

Competitors

  • What are other hospitals doing?

    What the interviewer says

    Two new private hospitals opened in Dubai last year. No new hospital is due in Abu Dhabi for three years.

Operations

  • Where does the half day of waiting go?

    What the interviewer says

    The audit split it by cause, shown in the exhibit with this case.

  • When do patients leave?

    What the interviewer says

    About 60 percent leave after 2 in the afternoon. Letters follow the consultant round, and take-home medicines come in one batch at 3 pm.

  • What would day-before planning need?

    What the interviewer says

    Four discharge coordinators, at about AED 180,000 a year each, to prepare letters, medicines and transport a day ahead.

Constraints

  • Are there safety limits?

    What the interviewer says

    The 30-day readmission rate is 6 percent today. Insurers review any hospital above 8 percent.

Exhibit

Exhibit 1

Hours patients wait on the day they go home, by cause (hours)

Bar chart: Hours patients wait on the day they go home, by cause (hours). Values in hours. Discharge letter: 5; Take-home medicines: 4; Transport: 3.

Source: illustrative hospital audit.

Solution

Show the solution

Structure

  • Patients a year = bed-days available / average stay
    • Bed-days used a year = beds x 365 x occupancy
    • Key: Patients before and after the shorter stay
    • Value = extra patients x contribution

Analysis

  1. 1. Bed-days a year

    200 beds x 365 days x 90 percent full.

    Bed-days used a year: 200 × 365 × 0.9 = 65,700

  2. 2. Patients before

    65,700 bed-days / 5 days each.

    Patients a year before: 65,700 ÷ 5 = 13,140

  3. 3. Patients after

    65,700 bed-days / 4.5 days each.

    Patients a year after: 65,700 ÷ 4.5 = 14,600

  4. 4. Extra patients

    The same beds, more patients.

    Extra patients a year: 14,600 - 13,140 = 1,460

  5. 5. Value

    1,460 extra admissions at AED 3,000 each.

    Extra contribution a year (AED): 1,460 × 3,000 = 4,380,000

  6. 6. Beds this is worth

    How many beds the hospital would need to add to treat as many patients at the old 5-day stay.

    Equivalent new beds: 200 × 5 ÷ 4.5 - 200 = 22.22

  7. 7. What those beds would cost to build

    About 22 beds at AED 1.5 million each, in AED millions.

    Building cost avoided (AED millions): (200 × 5 ÷ 4.5 - 200) × 1.5 = 33.33

  8. 8. Cost of discharge planning

    Four discharge coordinators at AED 180,000 a year each.

    Coordinator cost a year (AED): 4 × 180,000 = 720,000

  9. 9. Net gain a year

    Extra contribution minus the coordinators.

    Net gain a year (AED): 1,460 × 3,000 - 4 × 180,000 = 3,660,000

  10. 10. Is there demand?

    Extra admissions a day, against a waiting list of about 600 that keeps growing.

    Extra admissions a day: 1,460 ÷ 365 = 4

  • The exhibit: Together the three waits add up to half a day, and none of them is medical care.

Recommendation

Removing half a day of waiting lets the same 200 beds treat about 1,460 more patients a year. That is worth about AED 4.4 million of contribution. It is the same as building roughly 22 new beds, with no construction. The waste was waiting, not medical care, so the change does not shorten treatment. One risk is sending patients home too early, so track readmissions. Another is that the gain is real only if patients are waiting for beds. After four coordinators at AED 720,000 a year, the net gain is about AED 3.66 million a year. Building the same capacity would cost about AED 33 million. Hospitals carry high fixed costs in beds and staff, so filling freed bed-days with paid admissions goes almost straight to profit. Since insurers pay a fixed price per admission, a shorter stay does not cut revenue.

Risks

  • Readmissions may rise above the 8 percent level that insurers review if patients leave too soon
  • The gain depends on the waiting list; 4 extra admissions a day need about 600 waiting patients to stay
  • Doctors may resist writing discharge letters a day early

Next steps

  • Run day-before discharge planning on two wards for three months and measure stay and readmissions
  • Move the take-home medicines batch from 3 pm to the morning
  • Book transport the day before for patients who need it
  • Put the 40-bed wing on hold until the pilot results are in
Timed math drill

A fashion retailer in Spain holds EUR 8 million of stock. Its carrying cost is 20 percent a year. It cuts stock by a quarter without losing sales. How much does it save a year, in EUR millions?

Common mistakes

Treating lean as cutting staff. The gains come from removing waiting and rework. Cutting people first destroys the trust you need to find the waste. Aiming for zero stock everywhere: a small buffer before the bottleneck, and safety stock for supplies that come from far away, protect output. Counting only the interest on stock and forgetting space, damage and goods going out of date. Ignoring that stock hides problems: when piles shrink, breakdowns and defects become visible, which is the point.

Quick check

In lean terms, which of these is waste?

Quick check

A factory halves the half-finished stock between its steps, and output stays the same. What happens to the time a product spends in the factory?

Quick check

A hospital shortens the average stay by removing waiting at discharge. What is the main economic gain?

Hospitals as operations

Beds, operating theatres and staff are the capacity of a hospital, and patient flow decides how much good they do. The healthcare brief explains who pays and what hospitals measure.

Read the healthcare brief

Next lesson: The cost of quality: defects, prevention and inspection