Investment and capital project decisions

Is this project worth it: payback, net present value (NPV), and internal rate of return (IRR), compared with the cost of capital and the alternatives.

19 min

What this case type is and when it shows up

An investment case asks whether to spend money on a project: a new machine, a new plant, a new system. It is judged on what goes in, what comes back, how fast, and how that compares with the risk and with other uses of the money.

The underlying theory, in plain language

Payback is how long it takes to earn back the cost. It is quick and easy to explain, but it ignores everything after the payback year and the time value of money.

Net present value (NPV) fixes both. Money in later years is worth less than money today, because today's money could be invested. Divide each future year's cash by (1 plus the discount rate) once for each year of waiting, add the results, and subtract the cost. The discount rate is usually the company's cost of capital, the return its investors and lenders expect. A positive NPV means the project earns more than the cost of capital and adds value.

Internal rate of return (IRR) is the discount rate at which NPV equals zero. If the IRR is above the cost of capital, the project adds value. In interviews, you can bracket it: try two rates and see where NPV changes sign. Return on investment (ROI) is the net gain divided by the cost; be clear whether you mean the net gain or the total cash back.

Always include the alternatives, including doing nothing. A project with a good return may still lose to a better use of the same money.

What the prompts sound like, from simple to hard

  • Simple: should a Singapore warehouse buy a machine that saves money.
  • Medium: build a new plant in India or upgrade the old one.
  • Hard: pick among several projects with one budget.

Build the structure from the goal

Three moves that give you the structure

  1. Start from the decision. Should the client spend this money on this project, compared with doing nothing or with other uses of the money?
  2. Write the maths of the goal. Value of the project = the cash it adds each year, discounted at the cost of capital, minus the upfront cost (NPV). Payback = upfront cost / yearly cash. Then compare with the best alternative use of the money.
  3. Let the business pick the branches. The industry tells you which cash line is uncertain. For a machine or a vehicle fleet, running-cost savings and the energy price swing the answer. For a mine or a power plant, the selling price over many years does. For a software system, how many people use it and how long it lasts do.
Same type, different case 1: a hotel deciding whether to install rooftop solar panels
  • NPV of the panels at the cost of capital
    • Upfront cost of panels and installation
    • Key: Yearly saving: power produced x grid price avoided
    • Life of the panels and upkeep
    • Alternative: a power purchase deal with no upfront cost

This comes from NPV = discounted yearly cash minus the upfront cost. The saving rests on the grid price, so that branch gets the detail and a sensitivity.

Same type, different case 2: a farm cooperative deciding on a shared grain dryer
  • Is the dryer worth its cost?
    • Cost of the dryer and its building
    • Key: Extra income: less spoiled grain, and selling after the harvest price dip
    • Use: how many members, and for how many weeks a year
    • Payback versus the members' other needs

Same maths, a different business. Grain prices are usually higher some months after harvest, so being able to store and sell later is often the biggest gain.

Why a generic structure scores lower

Approving anything with a quick payback ignores the time value of money and the alternatives. Interviewers score the candidate who compares NPV with the next best use of the money.

Crack any case in five moves

Finding and narrowing the real problem

Compute payback, then NPV at the cost of capital, then compare the return with the alternatives and the risk, rather than approving any project that makes money on paper.

Names you may hear, kept as questions that fall out of the goal maths

  • Payback: How many years until the cash returned equals the cost? A quick first check that falls out of the goal maths. Where it stops helping: Ignores the time value of money and any cash after payback.
  • NPV and IRR: What is the project worth in today's money at the cost of capital, and at what rate does it break even? Where it stops helping: Only as good as the cash forecasts and the discount rate.
  • Compare with alternatives: Is this the best use of the money, including doing nothing? Where it stops helping: Requires honest estimates for each alternative.

Methods for solving this type

  • Estimate the spend and the yearly cash effect, after running costs
  • Compute payback
  • Compute NPV at the cost of capital
  • Bracket the IRR
  • Compare with alternatives and recommend

The math patterns it relies on

  • Payback = cost / yearly cash
  • Present value = cash / (1 + rate) for each year of waiting
  • NPV = sum of present values minus cost
  • IRR: the rate at which NPV is zero

Worked cases

Worked case

A sorting machine for a Singapore warehouse

Case

A Singapore logistics company can buy a warehouse sorting machine for SGD 240,000. It would cut costs by SGD 80,000 a year for six years, with no value at the end. The company's cost of capital is 10 percent a year, and the same budget could instead fund a software upgrade, shown in the table. The finance director asks whether the machine is worth buying.

Interviewer-led: the interviewer shows the two options and asks for payback, then NPV, then the IRR, and then which option to fund.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation
  • What does the company do?

    What the interviewer says

    It runs a warehouse for online retailers, picking, packing and sorting about 15,000 parcels a day.

History
  • How is sorting done today?

    What the interviewer says

    By hand, with about 12 staff on each of two shifts.

Objective
  • What does the finance director want?

    What the interviewer says

    To fund whichever project adds the most value from this year's SGD 240,000 budget. Only one can be funded.

Financials
  • Are the savings after running costs such as maintenance and power?

    What the interviewer says

    Yes. The net figure is SGD 80,000 a year; the build-up is in the second exhibit.

  • Does the machine have any value at the end?

    What the interviewer says

    No.

  • What else could the money be used for?

    What the interviewer says

    A software upgrade with an expected return of about 15 percent a year.

Market
  • Is parcel volume stable?

    What the interviewer says

    It grew about 8 percent a year for three years. The two largest clients have contracts for four more years.

Customers
  • Do clients care how parcels are sorted?

    What the interviewer says

    They charge penalties for missorted parcels. The machine would cut those, and that saving is already inside the SGD 80,000.

Competitors
  • What do rival warehouses use?

    What the interviewer says

    The two largest local rivals installed similar machines in the last two years.

Operations
  • How sure are the savings?

    What the interviewer says

    The supplier's figure comes from three reference sites in the region.

  • Does the machine fit in the building?

    What the interviewer says

    Yes. It needs about 300 square meters, which became free when a client moved out.

Constraints
  • Are there limits on how we use the savings?

    What the interviewer says

    Staff would move to other roles, not be laid off. Installation takes about three months.

Exhibits

Exhibit 1
Two uses of the same budget
Two uses of the same budget
OptionUpfront cost (SGD)Yearly benefitLife (years)
Sorting machine240,000SGD 80,000 of net savings a year, no value at the end6
Software upgrade240,000About 15 percent return a yearNot stated
Exhibit 2
Build-up of the machine's yearly saving (SGD thousands)(SGD thousands a year)

Waterfall chart: Build-up of the machine's yearly saving (SGD thousands). Values in SGD thousands a year. Labor saved: four fewer staff a day, total: 120; Maintenance and power, change: -40; Net yearly saving, total: 80.

Source: illustrative supplier and company estimates.

Solution

Show the solution
Hypothesis

A three-year payback on a six-year machine looks healthy. My hypothesis is that it clears the 10 percent cost of capital comfortably, and that the real question is whether it beats the 15 percent software alternative.

Structure
  • Payback, NPV, and IRR versus the alternativesThis comes from NPV = yearly savings discounted at the cost of capital minus the price of the machine, compared with the other use of the money.
    • Payback
    • Key: NPV at the 10 percent cost of capital
    • IRR versus the 15 percent alternative
Analysis
  1. 1. Payback

    SGD 240,000 against SGD 80,000 saved a year.

    Payback (years): 240,000 ÷ 80,000 = 3

  2. 2. Savings before discounting

    SGD 80,000 a year for six years, twice the cost. This is a 2 times cash multiple (a 100 percent net gain), but it ignores the time value of money.

    Undiscounted savings (SGD): 80,000 × 6 = 480,000

  3. 3. Present value at 10 percent

    Divide each year's saving by 1.1 once per year of waiting (1.21 is 1.1 x 1.1, and so on).

    Present value of savings (SGD): 80,000 ÷ 1.1 + 80,000 ÷ 1.21 + 80,000 ÷ 1.331 + 80,000 ÷ 1.4641 + 80,000 ÷ 1.61051 + 80,000 ÷ 1.771561 = 348,421

  4. 4. NPV

    Present value of savings minus the cost.

    NPV at 10 percent (SGD): 348,420.86 - 240,000 = 108,421

  5. 5. Bracket the IRR: try 24 percent

    At 24 percent the savings are still worth slightly more than the SGD 240,000 cost.

    Present value at 24 percent (SGD): 80,000 ÷ 1.24 + 80,000 ÷ (1.24 × 1.24) + 80,000 ÷ (1.24 × 1.24 × 1.24) + 80,000 ÷ (1.24 × 1.24 × 1.24 × 1.24) + 80,000 ÷ (1.24 × 1.24 × 1.24 × 1.24 × 1.24) + 80,000 ÷ (1.24 × 1.24 × 1.24 × 1.24 × 1.24 × 1.24) = 241,638

  6. 6. Bracket the IRR: try 25 percent

    At 25 percent they are worth slightly less than the cost, so the IRR is about 24 percent.

    Present value at 25 percent (SGD): 80,000 ÷ 1.25 + 80,000 ÷ (1.25 × 1.25) + 80,000 ÷ (1.25 × 1.25 × 1.25) + 80,000 ÷ (1.25 × 1.25 × 1.25 × 1.25) + 80,000 ÷ (1.25 × 1.25 × 1.25 × 1.25 × 1.25) + 80,000 ÷ (1.25 × 1.25 × 1.25 × 1.25 × 1.25 × 1.25) = 236,114

  • Exhibit 1: Both options use the same budget, so the machine must beat the software upgrade's 15 percent, not only the 10 percent cost of capital.
  • Exhibit 2: The saving rests on labor; a third of it is eaten by running costs.
Recommendation

I recommend buying the machine. First, it pays back in three years. Its savings are worth about SGD 348,000 in today's money against a cost of SGD 240,000. That is an NPV of about SGD 108,000 at the 10 percent cost of capital. Second, its IRR is about 24 percent, above both the cost of capital and the 15 percent software alternative. Third, savings could fall by about 30 percent before the NPV reaches zero. The move in play is automation of a labor-heavy step. Warehousing runs on thin margins and parcel volumes keep growing, so replacing hand sorting with a machine locks in a lower cost per parcel as volume rises. Confirm the savings at a reference site before signing.

Risks
  • Savings may be lower if volumes fall
  • Maintenance costs may rise in later years
Next steps
  • Visit a reference site using the same machine
  • Negotiate a performance guarantee with the supplier
Strong and weak answers

A strong candidate

Computed payback, NPV, and a bracketed IRR, and compared the return with both the cost of capital and the alternative.

A weak candidate

Said yes because it "saves 80,000 a year" and "doubles the money," without discounting or comparing.

Worked case

Electric or diesel vans for a UK parcel company

Case

A UK parcel company must replace 100 of its diesel delivery vans this year, because they have reached the end of their life. Electric vans cost more to buy but less to run, and chargers could be installed at the company's depot. The fleet director asks whether to buy electric vans instead of new diesel ones.

Candidate-led: you set up the comparison, ask for costs, and choose the measures; the interviewer answers and then tests your answer with a change.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What does the company do?

    What the interviewer says

    Same-day and next-day parcel delivery around Greater Manchester, with about 300 vans in all.

History

  • Why must these vans be replaced now?

    What the interviewer says

    They are about seven years old and at the end of their life.

Objective

  • Are we comparing a new electric van with a new diesel van, or with keeping the old vans?

    What the interviewer says

    With a new diesel van. Keeping the old vans is not an option.

Financials

  • What do the two vans cost?

    What the interviewer says

    Electric GBP 45,000, diesel GBP 30,000, plus about GBP 3,000 per electric van for depot chargers. The full cost comparison is in the exhibit.

  • And the running costs?

    What the interviewer says

    Diesel costs about GBP 6,000 a year per van and electricity about GBP 2,000. Electric vans save about GBP 1,000 a year in maintenance.

  • What cost of capital should I use, and how long do the vans last?

    What the interviewer says

    8 percent a year. Both types last about six years, with little value at the end.

Customers

  • Do customers care which vans we use?

    What the interviewer says

    Two large retail clients want lower-emission delivery in their next contracts, but neither will pay more for it.

Competitors

  • What are rivals doing?

    What the interviewer says

    The largest national carriers are moving their city fleets to electric vans in stages.

Operations

  • How far does a van drive each day?

    What the interviewer says

    It depends on the route; the split is in the second exhibit. The electric van's range is about 250 km in winter.

  • Can the depot power 100 chargers?

    What the interviewer says

    Not known yet. The local power network must confirm, and an upgrade could cost extra.

  • Do drivers need new licences or training?

    What the interviewer says

    No new licences. A half-day training session covers charging.

Constraints

  • Are any rules about to change?

    What the interviewer says

    The city is discussing a clean-air charge for older vans, but nothing is decided, so leave it out.

Exhibits

Exhibit 1

Cost of one new van, diesel versus electric (GBP)
Cost of one new van, diesel versus electric (GBP)
Cost itemDiesel van (GBP)Electric van (GBP)
Purchase price30,00045,000
Depot charger, per van03,000
Fuel or electricity, per year6,0002,000
Maintenance, per year2,5001,500

Source: illustrative supplier quotes and fleet records.

Exhibit 2

Vans to replace by route type
Vans to replace by route type
Route typeVansTypical distance a day (km)
City40120
Suburban35180
Rural25250

Source: illustrative fleet records.

Solution

Show the solution

Hypothesis

Electric vans cost more to buy but less to run. My hypothesis is that the running-cost saving pays back the extra price within the van's life, and that the answer is most sensitive to the price of electricity.

Structure

  • Extra upfront cost versus running-cost savings, in today's moneyThis comes from NPV = yearly running-cost savings in today's money minus the extra upfront cost per van.
    • Extra upfront cost per van, including charging
    • Yearly saving per van: fuel and maintenance
    • Key: Payback and NPV at 8 percent
    • Sensitivity: electricity price

Analysis

  1. 1. Extra upfront cost

    Candidate: "What do the two vans cost?" Interviewer: "Electric GBP 45,000, diesel GBP 30,000, plus about GBP 3,000 per van for depot chargers."

    Extra upfront cost per electric van (GBP): 45,000 - 30,000 + 3,000 = 18,000

  2. 2. Yearly saving

    Candidate: "And running costs?" Interviewer: "Diesel costs about GBP 6,000 a year per van, electricity about GBP 2,000, and electric vans save about GBP 1,000 a year in maintenance."

    Yearly saving per van (GBP): (6,000 - 2,000) + 1,000 = 5,000

  3. 3. Payback

    The extra cost divided by the yearly saving: inside the six-year life, but not by much.

    Payback (years): 18,000 ÷ 5,000 = 3.6

  4. 4. Savings in today's money

    Discount six years of GBP 5,000 at 8 percent (1.1664 is 1.08 x 1.08, and so on). Six years of savings are worth about 4.62 years of savings today.

    Present value of savings per van (GBP): 5,000 ÷ 1.08 + 5,000 ÷ 1.1664 + 5,000 ÷ 1.259712 + 5,000 ÷ 1.360489 + 5,000 ÷ 1.469328 + 5,000 ÷ 1.586874 = 23,114

  5. 5. NPV per van and for the fleet

    Present value of savings minus the extra upfront cost, then times 100 vans.

    Fleet NPV (GBP): 100 × (5,000 × 4.62288 - 18,000) = 511,440

  6. 6. Test: electricity price rises by half

    Interviewer: "What if electricity prices rise 50 percent?" Candidate: "Electricity would cost GBP 3,000 a van, so the yearly saving falls to GBP 4,000, and the NPV per van almost disappears."

    NPV per van if electricity rises 50 percent (GBP): 4,000 × 4.62288 - 18,000 = 492

  • Exhibit 1: The electric van costs GBP 18,000 more up front but GBP 5,000 a year less to run.
  • Exhibit 2: Rural vans would use the electric van's whole winter range, so city routes are the safe place to start.

Recommendation

Buy electric vans, but in phases and with electricity costs fixed where possible. First, each electric van costs GBP 18,000 more including charging but saves about GBP 5,000 a year, a payback of 3.6 years within a six-year life. Second, at an 8 percent cost of capital each van adds about GBP 5,100 of value in today's money, about GBP 511,000 for the fleet. Third, the answer depends on electricity prices: if they rise by half, the value per van almost disappears. So agree a fixed-price electricity contract for the depot before committing the whole fleet. The move in play is trading a higher upfront cost for lower running costs. Parcel delivery runs on thin margins and fuel is one of its largest costs, so the price of energy decides the answer. Start with the 40 vans on the shortest urban routes, where range is not a concern.

Risks

  • Electricity prices may rise more than expected
  • Battery life may be shorter than six years on long routes
  • Depot power supply may need an upgrade that costs more than GBP 3,000 a van

Next steps

  • Get quotes for a fixed-price electricity contract
  • Ask the local power network whether the depot can take 100 chargers
  • Run 10 electric vans for three months and measure real running costs

Strong and weak answers

A strong candidate

Compared the right alternative (a new diesel van, not the old one), computed payback and NPV, and tested the one assumption that could flip the answer.

A weak candidate

Added six years of undiscounted savings, GBP 30,000 against GBP 18,000, and called it a clear win without discounting or testing electricity prices.

Prompt: "Should we buy this machine?"

Weaker answer

Says yes because it "saves 80,000 a year" and "doubles the money," without discounting, IRR, or alternatives.

Stronger answer

Finds a three-year payback, an NPV of about SGD 108,000 at 10 percent, and an IRR of about 24 percent, then shows it beats the 15 percent alternative as well as the 10 percent cost of capital.

Why the stronger answer wins: The strong answer judges the project fully and in context. The weak one reacts to one undiscounted number.

Common mistakes, traps, and curveballs

  • Adding up future cash without discounting it
  • Approving any project with a positive return, ignoring the alternatives
  • Forgetting running costs such as maintenance and power
  • Treating risky and safe returns as equal
  • Mixing up a cash multiple (2 times) with a return (100 percent)

How firms often vary on this type

Investment cases reward clean arithmetic and an explicit comparison with alternatives. Interviewers may add a second project to force a real choice under one budget. Formats differ by office and change over time, so check the current process for your target office.

Practice

Timed math drill

What is EUR 1,210 received in two years worth today, at 10 percent a year?

Timed math drill

A solar installation for a factory in the UAE costs AED 900,000 and saves AED 150,000 a year in power. What is the payback, in years?

Timed math drill

What is GBP 1,000 received in three years worth today, at 5 percent a year?

Quick check

Two projects cost the same. A has an NPV of +50 and a payback of 5 years; B has an NPV of +20 and a payback of 2 years. Cash is not tight. Which adds more value?

Quick check

A project's NPV is positive at an 8 percent discount rate and negative at 12 percent. What do you know about its IRR?

Quick check

An electric van costs more than a diesel van. Which comparison is correct?

The one thing to remember

Discount future cash at the cost of capital: a project is worth doing if its NPV is positive and it beats the other uses of the money.

Next module: Market study and industry analysis

Sources

Math checked, facts checked against sources on 16 June 2026.

  • Recognized public explanations of case-interview concepts and terms

Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.