Worked case
How much of the profit comes from the installed base?
Case
Ironfield Machines (a fictional company) sells 1,000 mining trucks a year at USD 250,000 each, with a 10 percent operating margin. It has 10,000 of its trucks working at customers. Each truck needs about USD 20,000 a year of parts and service, and Ironfield wins 60 percent of that spending at a 35 percent margin. The CEO wants steadier profit through the mining cycle and asks how much profit comes from new trucks and from the aftermarket.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
Where does Ironfield sell?
What the interviewer says
Mainly to miners in Australia, Chile, Canada and South Africa.
How is the brand seen?
What the interviewer says
The trucks are known for their yellow paint, and drivers rate the cab highly.
History
Has the capture rate changed?
What the interviewer says
It fell from 70 percent to 60 percent over five years as independent parts makers grew.
Objective
What does the CEO want?
What the interviewer says
Profit that holds up better when mining companies stop buying new trucks.
Financials
How long does a truck work?
What the interviewer says
About 15 years, so a truck bought today will need parts until about 2041.
Market
How cyclical is demand?
What the interviewer says
In the last downturn, truck orders fell 40 percent while parts and service spending fell about 10 percent.
Customers
How do customers buy service today?
What the interviewer says
About 30 percent of trucks in the field are on an Ironfield service contract. The rest buy parts order by order.
Competitors
Who takes the other 40 percent of spending?
What the interviewer says
Independent suppliers selling copies of fast-wearing parts at 20 to 30 percent below Ironfield's prices.
Operations
Does Ironfield know how its trucks are used?
What the interviewer says
Yes. Trucks sold in the last five years send sensor data that shows when parts are wearing out.
Constraints
Can customers be required to buy Ironfield parts?
What the interviewer says
No. Many purchase contracts let customers buy parts from any supplier.
Exhibit
Exhibit 1
| Business | Revenue | Profit | Profit in a downturn |
|---|---|---|---|
| New trucks | 250 | 25 | 15 |
| Aftermarket | 120 | 42 | 37.8 |
| Total | 370 | 67 | 52.8 |
Solution
Show the solutionHide the solution
Structure
- Profit = new equipment profit + aftermarket profit
- New equipment profit = units x price x margin
- Aftermarket revenue = installed base x spend per unit x capture rate
- Aftermarket profit = aftermarket revenue x margin
Analysis
1. New truck revenue
1,000 trucks at USD 250,000.
New equipment revenue (USD million): 1,000 × 250,000 ÷ 1,000,000 = 250
2. New truck profit
10 percent margin.
New equipment profit (USD million): 250 × 0.1 = 25
3. Aftermarket revenue
10,000 trucks, USD 20,000 each, 60 percent captured.
Aftermarket revenue (USD million): 10,000 × 20,000 × 0.6 ÷ 1,000,000 = 120
4. Aftermarket profit
35 percent margin.
Aftermarket profit (USD million): 120 × 0.35 = 42
5. Share of profit from the aftermarket
42 out of a total of 67.
Aftermarket share of profit (fraction): 42 ÷ (25 + 42) = 0.6269
6. Winning back capture
Equipment makers often earn most of their profit from the installed base, so the move is to sell more services. Test lifting capture from 60 to 70 percent.
Extra aftermarket profit at 70 percent capture (USD million): 10,000 × 20,000 × (0.7 - 0.6) × 0.35 ÷ 1,000,000 = 7
7. Profit in a downturn
In the last downturn truck orders fell 40 percent while parts spending fell about 10 percent.
Total profit in a downturn (USD million): 25 × 0.6 + 42 × 0.9 = 52.8
- The exhibit: The aftermarket is the smaller business but the larger and steadier profit.
Recommendation
Ironfield should invest in its aftermarket, because it is about a third of revenue but about 63 percent of profit. The aftermarket earns USD 42 million on USD 120 million of revenue, against USD 25 million from new trucks. It is also the stable part: in a downturn like the last one, total profit would fall only from USD 67 million to about USD 52.8 million. Raising capture from 60 to 70 percent, back to where it was five years ago, would add USD 20 million of revenue and USD 7 million of profit.
Risks
- Customers may keep switching to cheaper independent parts suppliers.
- Service contracts priced too low can lock in losses on old trucks.
- Some customer contracts allow them to buy parts from anyone, which limits capture.
Next steps
- Sell service contracts with each new truck and track the capture rate by region.
- Use the trucks' sensor data to offer planned part replacement before failure.
- Price fast-wearing parts closer to independent suppliers where Ironfield is losing share.
Overall equipment effectiveness (OEE)
OEE measures how much good output a machine or line produces compared with what it could produce if it ran all the planned time, at full speed, with no defects. It multiplies three rates. Availability: the share of planned time the machine actually runs (lost to breakdowns and changeovers). Performance: how fast it runs compared with its ideal speed (lost to slow cycles and small stops). Quality: the share of output that is good (lost to scrap and rework). OEE of 85 percent is often cited as world class for discrete manufacturing; many plants are far lower.
Worked case
OEE of a machining line in India
Case
A fictional auto parts maker runs a machining line in Pune planned for 480 minutes a shift, and it stops for 48 minutes of breakdowns and changeovers. The ideal cycle time is 0.8 minutes per part. In a shift it makes 459 parts, of which 450 are good. A carmaker customer wants 20 percent more parts, and the plant head asks for the line's OEE and its biggest loss before buying a new line.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the line make?
What the interviewer says
Steering knuckles for two carmakers. It runs three shifts a day, six days a week.
Has the plant won any recognition?
What the interviewer says
It won a state safety award last year. Its car park is being expanded.
History
Has OEE always been this level?
What the interviewer says
It was about 80 percent two years ago. Since then the line has gone from 4 to 9 part types.
Objective
What does the plant head need?
What the interviewer says
About 20 percent more good parts from next year, for one of its two carmaker customers.
Financials
What would a new line cost?
What the interviewer says
About INR 8 crore, with a lead time of nine months.
Customers
How strict is the customer?
What the interviewer says
It charges a penalty for late deliveries and audits quality twice a year.
Competitors
How do other plants compare?
What the interviewer says
The group's best plant runs similar lines at about 85 percent OEE.
Operations
What makes up the 48 minutes of stops?
What the interviewer says
One changeover of 30 minutes in a typical shift, and about 18 minutes of breakdowns.
Are short stops recorded?
What the interviewer says
No. Stops of one or two minutes are not logged by the operators.
Constraints
Can the line run more shifts?
What the interviewer says
No. The seventh day is kept for planned maintenance.
Exhibit
Exhibit 1
Bar chart: The three OEE factors on the Pune line (percent, illustrative). Values in percent. Availability: 90; Performance: 85; Quality: 98; OEE: 75.
Solution
Show the solutionHide the solution
Structure
- OEE = availability x performance x quality
- Availability = run time divided by planned time
- Performance = (parts made x ideal cycle time) divided by run time
- Quality = good parts divided by parts made
- Key: Extra output from fixing the losses, against a new line
Analysis
1. Availability
Run time is 480 minus 48, which is 432 minutes.
Availability (fraction): (480 - 48) ÷ 480 = 0.9
2. Performance
459 parts at 0.8 minutes ideal is 367.2 minutes of ideal work in 432 minutes of running.
Performance (fraction): 459 × 0.8 ÷ 432 = 0.85
3. Quality
450 good out of 459.
Quality (fraction): 450 ÷ 459 = 0.9804
4. OEE
Multiply the three rates.
OEE (fraction): 0.9 × 0.85 × (450 ÷ 459) = 0.75
5. Fix the speed loss
In manufacturing, hidden capacity is cheaper than new capacity. Test 95 percent performance in the same 432 minutes of running.
Parts per shift at 95 percent performance: 432 × 0.95 ÷ 0.8 = 513
6. Fix speed and changeovers
Halving changeover time from 30 to 15 minutes cuts stops to 24 minutes in each shift with one changeover. Run time becomes 456 minutes at 95 percent performance and the same quality.
Good parts per shift with both fixes: (480 - 24) × 0.95 ÷ 0.8 × (450 ÷ 459) = 531
7. Output gain
Compare with 450 good parts today.
Increase in good parts (percent): (530.88 ÷ 450 - 1) × 100 = 17.97
- The exhibit: Speed is the biggest loss, then stops; quality is fine.
Recommendation
The plant should fix the line before buying a new one. OEE is 75 percent, and the biggest loss is performance (85 percent: the line runs slower than it should), then availability (90 percent). Quality is already high. Raising performance to 95 percent and halving changeover time would lift good parts from 450 to about 531 a shift, about 18 percent more. That covers almost all of the 20 percent the customer wants, for far less than the INR 8 crore a new line would cost.
Risks
- A wrong ideal cycle time makes performance look better or worse than it is.
- Small stops are not recorded today, so the speed loss may have causes that are slow to fix.
- The last 2 percent of demand may still need overtime or a partner supplier.
Next steps
- Record every stop over one minute for two weeks to find the causes of the speed loss.
- Run a changeover reduction workshop on the most frequent part change.
- Agree with the customer how the extra volume ramps up over six months.
Make or buy
A make-or-buy decision asks whether to produce a part in-house or buy it from a supplier. The trap is to compare the supplier's price with the full cost of making the part, including allocated overheads. If those overheads stay even when the part is bought, they are not saved, so they should not count. Compare the supplier price with the costs that would actually disappear (the relevant costs), then add strategic points: control of key technology, quality, supply risk, and what else the freed capacity could make.
Worked case
Should we buy a valve body from a supplier?
Case
A fictional family-owned pump maker in Germany makes 100,000 valve bodies a year, and its CFO wants to cut costs. Its variable cost is EUR 40 per part (materials, direct labor, energy). The accounting system also allocates EUR 25 per part of factory overhead, which would not go away if production stopped. A supplier in Poland offers EUR 55 per part, and the CFO asks whether to buy.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What role does the valve body play?
What the interviewer says
It is a core part of the company's industrial pumps, which are sold mainly to chemical plants.
Has the plant invested recently?
What the interviewer says
It installed solar panels on the roof last year.
History
How long has it been made in-house?
What the interviewer says
For about 30 years. The scrap rate is about 2 percent.
Objective
What does the CFO want?
What the interviewer says
To cut costs by about EUR 1 million a year.
Financials
What is in the EUR 25 of overhead?
What the interviewer says
Building costs, supervisors, maintenance staff and IT. About EUR 10 per part is floor space that could be rented out.
Market
How reliable is the Polish supplier?
What the interviewer says
Its defect rate is about 1.5 percent, and trucks reach the plant in two days.
Customers
What do customers care about?
What the interviewer says
Reliability. A failed valve can stop a chemical plant for days.
Competitors
What do rivals do?
What the interviewer says
Two rivals already buy valve bodies from Eastern Europe.
Operations
What else could the machines make?
What the interviewer says
Pump housings for a new customer: about 60,000 a year at EUR 20 of contribution each.
Constraints
What happens to the operators if production stops?
What the interviewer says
The 12 operators would move to open jobs elsewhere in the plant. No one would be laid off.
Exhibit
Exhibit 1
| Option | Cost that changes (EUR per part) | Yearly cost (EUR) |
|---|---|---|
| Make in-house | 40 | 4,000,000 |
| Buy from Poland | 55 | 5,500,000 |
| Buy, and rent out the freed space | 45 | 4,500,000 |
Solution
Show the solutionHide the solution
Structure
- Compare the supplier price with the costs that would really be saved
- Relevant cost of making = variable cost only (overhead stays)
- Yearly difference = (supplier price minus relevant cost) x volume
- Then: strategy, quality, risk, other uses of the capacity
Analysis
1. Full cost on paper
Variable 40 plus allocated overhead 25.
Full cost per part (EUR): 40 + 25 = 65
2. Extra cost of buying
The supplier charges 55, but only 40 of cost disappears.
Extra cost of buying per year (EUR): (55 - 40) × 100,000 = 1,500,000
3. If some overhead can go
This is a make or buy decision, so count only costs that truly change. Renting out the freed floor space would remove about EUR 10 of overhead per part.
Extra cost of buying with EUR 10 of overhead removed (EUR): (55 - 40 - 10) × 100,000 = 500,000
4. Using the freed machines
The machines could instead make 60,000 pump housings a year for a new customer, at EUR 20 of contribution each.
Contribution from the freed capacity (EUR): 60,000 × 20 = 1,200,000
- The exhibit: Making stays cheapest even when some overhead can be removed.
Recommendation
The pump maker should keep making the valve body, because buying would cost EUR 1.5 million more a year. The EUR 25 of overhead per part stays whether or not production stops, so the real comparison is EUR 55 against the EUR 40 variable cost. The EUR 65 full cost makes buying look cheaper than it is. Even the best use of the freed machines earns EUR 1.2 million, less than the EUR 1.5 million extra. Renting out the space instead still leaves buying EUR 0.5 million a year dearer, and the two cannot be combined, since the machines stand on that floor space. The valve body is also critical to pump reliability, which customers value most.
Risks
- Ignoring other uses of the capacity: a better-paying order would change the answer.
- Energy and wage rises in Germany may lift the EUR 40 variable cost over time.
- Keeping the work in-house means the old machines must be replaced at some point.
Next steps
- Check whether the freed capacity could earn more than EUR 1.5 million a year.
- Find out whether any of the EUR 25 of overhead could truly be removed.
- Use the Polish offer to benchmark and cut the in-house variable cost.
Supply chain and operations
- Tiered supply base: a final assembler depends on tier 1 suppliers of systems, which depend on tier 2 and 3 suppliers of components, castings, forgings and raw materials. In aerospace, a few specialist suppliers of engines, castings and forgings can limit the whole industry.
- Long lead times: some parts take a year or more to make and must be certified, so switching suppliers is slow.
- Production systems: most plants use lean methods (remove waste, level the flow, fix problems at the source) and track OEE, lead time and on-time delivery.
- Ramp-up: raising the production rate, for example from 40 to 50 aircraft a month, needs every supplier to rise at the same time. The slowest one sets the pace.
- Aftermarket logistics: spare parts must be available fast anywhere in the world, so companies hold parts stock in regional warehouses and plan it by predicting failures.
- Footprint: where to build (near customers, in low-cost countries, or close to suppliers) is a common case, covered in the Capacity, supply chain, and footprint module.
Next lesson: Industrial and aerospace players, trends 2024 to 2026, and how to crack the cases
Sources
Math checked, facts checked against sources on 16 June 2026.
- Recognized public explanations of case-interview concepts and terms
Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.