Defence and space economics: contracts, backlog and reuse
Work out who carries a cost overrun, how many years of work a backlog covers, what a higher spending target adds, and why a reusable rocket cuts the cost per kilogram.
Lesson 2 of 3 · 12 min
The idea
Defence profit comes from winning long programmes, pricing the risk correctly and delivering on time; the margin is steady but rarely huge. In space launch, the big idea is reuse: a rocket stage that flies many times spreads its cost over many launches.
| Company | Sales | Margin | Backlog |
|---|---|---|---|
| Rheinmetall (Germany) | About EUR 5.2 billion in the first half, up 39 percent | Operating margin about 15 percent | About EUR 80.5 billion, including expected call-offs from framework agreements |
| BAE Systems (UK) | About GBP 15.8 billion in the first half, up 9 percent | Underlying EBIT about GBP 1.7 billion, roughly 11 percent of sales | About GBP 84 billion, a record |
| Lockheed Martin (US) | About USD 20.1 billion in the second quarter alone | Net earnings about USD 1.8 billion in the quarter, roughly 9 percent of sales | About USD 230 billion, a record |
So-what
Margins of roughly 9 to 15 percent are typical of large defence contractors. The backlogs are several times a year's sales, which is why these companies can plan factories years ahead, and why a slow ramp-up, not a lack of orders, is now their main risk.
Worked case
Fixed price or cost-plus for an armoured vehicle programme in Poland
Case
A European defence company is negotiating a programme to build armoured vehicles for Poland and reports in EUR. It estimates the programme will cost EUR 400 million. The ministry offers two contracts: a fixed price of EUR 440 million, or cost-plus with a fixed fee of 7 percent of the estimated cost. The company thinks there is a real chance that costs run 15 percent over the estimate, because some suppliers are new. What profit does each contract give if costs are on estimate and if they overrun, and what does the ministry pay under cost-plus with the overrun? (Figures are illustrative.)
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What is the programme?
What the interviewer says
120 tracked armoured vehicles for the Polish army, delivered from 2028 over four years.
History
Has the company run fixed-price work like this before?
What the interviewer says
Yes. Its last fixed-price vehicle programme, for another country, overran by 12 percent in 2022 because steel and energy prices rose.
Objective
What does the company want?
What the interviewer says
To win the programme and earn close to its usual margin of about 9 to 10 percent of sales.
Financials
What makes up the EUR 400 million estimate?
What the interviewer says
Bought-in parts and systems about 60 percent, the company's own labour about 25 percent, and overheads about 15 percent.
What are the two contract offers?
What the interviewer says
A fixed price of EUR 440 million, or cost-plus with a fixed fee of 7 percent of the EUR 400 million estimate.
Market
Why is Poland buying now?
What the interviewer says
NATO allies agreed at The Hague in June 2025 to raise core defence spending to 3.5 percent of GDP, and Poland is expanding its army.
Customers
What does the ministry need besides vehicles?
What the interviewer says
About half the work must be done in Poland, through local suppliers and a local assembly partner.
Competitors
Who else is bidding?
What the interviewer says
A South Korean firm and a Polish state-owned firm. The Korean firm has accepted fixed prices on past export deals.
Operations
Why might costs overrun?
What the interviewer says
Three of the ten main suppliers are new Polish firms, together about 30 percent of bought-in cost. The company puts the chance of a 15 percent overrun at about one in three.
Anything else going on at the company?
What the interviewer says
It is also bidding for a bridge-laying vehicle in Norway, and the vehicles will be painted at a plant near Warsaw.
Constraints
Does the ministry have a budget limit?
What the interviewer says
Yes. Its approved budget for the programme is EUR 470 million, including a reserve.
Exhibits
Exhibit 1
| Contract | Company profit, on estimate | Company profit, 15 percent overrun | Ministry bill, on estimate | Ministry bill, 15 percent overrun |
|---|---|---|---|---|
| Fixed price | 40 | -20 | 440 | 440 |
| Cost-plus, 7 percent fee | 28 | 28 | 428 | 488 |
| Incentive, 50/50 share | 34 | 4 | 434 | 464 |
Illustrative figures.
Exhibit 2
Pie chart: What makes up the EUR 400 million cost estimate (percent). Bought-in parts and systems: 60 percent; Own labour: 25 percent; Overheads: 15 percent.
Illustrative figures.
Solution
Show the solutionHide the solution
Structure
- Profit = what the company is paid minus what it costs
- Fixed price: profit = price minus actual cost
- Cost-plus: profit = the fee; the government pays actual cost plus the fee
- Compare both in the base case and the overrun case
Analysis
1. Fixed price, on estimate
EUR 440 million minus EUR 400 million of cost.
Fixed-price profit on estimate (EUR millions): 440 - 400 = 40
2. Cost with a 15 percent overrun
EUR 400 million times 1.15.
Cost after the overrun (EUR millions): 400 × 1.15 = 460
3. Fixed price, with the overrun
The price stays at EUR 440 million, so the company loses money.
Fixed-price profit after the overrun (EUR millions): 440 - 400 × 1.15 = -20
4. Cost-plus fee
7 percent of the EUR 400 million estimate, the same whatever happens to cost.
Cost-plus fee (EUR millions): 400 × 0.07 = 28
5. What the ministry pays under cost-plus with the overrun
Actual cost of EUR 460 million plus the EUR 28 million fee.
Ministry's bill under cost-plus with the overrun (EUR millions): 400 × 1.15 + 28 = 488
6. Expected profit under a fixed price
The company puts the chance of the overrun at about one in three.
Expected fixed-price profit (EUR millions): (2 ÷ 3) × 40 + (1 ÷ 3) × (440 - 460) = 20
7. Incentive contract, with the overrun
A target cost of EUR 400 million and a target profit of EUR 34 million; each side carries half of any overrun.
Incentive profit after the overrun (EUR millions): 34 - 0.5 × (460 - 400) = 4
8. Ministry's bill under the incentive, with the overrun
Actual cost plus the reduced profit.
Ministry's bill under the incentive with the overrun (EUR millions): 460 + 34 - 0.5 × (460 - 400) = 464
- Exhibit 1: The incentive contract is the only one where neither side faces its worst case.
- Exhibit 2: Most of the cost sits with suppliers, so their quotes decide how much risk the company can take.
Recommendation
The company should propose an incentive contract that shares any overrun, and accept a fixed price only if it can lock in its supplier prices. A fixed price earns EUR 40 million on estimate but loses EUR 20 million if costs overrun by 15 percent. First, the cost-plus fee of EUR 28 million is lower than the fixed-price profit on estimate, but it is safe. With a one in three chance of the overrun, the fixed price is worth only about EUR 20 million in expectation. Second, the ministry faces the mirror image. Under cost-plus it would pay EUR 488 million if costs overrun, against EUR 440 million fixed, so it will push for a fixed price or a shared incentive. Its budget of EUR 470 million rules out the cost-plus overrun case. Third, an incentive contract that splits overruns 50/50 gives the company EUR 34 million on estimate and EUR 4 million with the overrun. The ministry pays EUR 464 million at worst. That is the deal both sides can sign. The risk is that insisting on cost-plus loses the competition to a rival willing to accept a fixed price. As a next step, get firm quotes from the new suppliers and propose an incentive contract that shares any overrun.
Risks
- A rival may accept a fixed price and win
- Inflation in steel, energy and wages can push costs above the estimate even without mistakes
- Late delivery can bring penalties on top of the cost overrun
Next steps
- Get firm quotes from the three new Polish suppliers before the final bid
- Propose the incentive contract with a ceiling price inside the ministry's EUR 470 million budget
- Price steel and energy escalation clauses separately from the overrun share
Rheinmetall reported a backlog of about EUR 80.5 billion at the end of June 2026 and expects 2026 sales of EUR 13.7 billion to EUR 14.2 billion. Using the middle of that range, how many years of sales does the backlog cover? Round to one decimal place.
A European country has a GDP of EUR 3,000 billion and spends 2 percent of it on defence. If it moves to the NATO core target of 3.5 percent of GDP, how much more does it spend each year, in EUR billions? (Figures are illustrative; GDP is held flat.)
Why reusable rockets changed launch
A rocket used to be thrown away after one flight, so every launch paid for a whole new rocket. The first stage (the large lower part with most of the engines) is the most expensive piece. If it lands and flies again, its cost is shared across many launches, and each flight only pays for checks and repairs, fuel, a new upper stage and launch operations. Reuse costs some payload, because fuel must be kept for landing. SpaceX has flown one Falcon 9 first stage 37 times (Spaceflight Now, August 2026).
Worked case
Cost per kilogram: an expendable rocket versus a reusable one
Case
A launch company compares two versions of its rocket and reports in USD. Expendable: a first stage costing USD 40 million, an upper stage costing USD 10 million, and USD 10 million for the nose cone, fuel and launch operations; it carries 20,000 kg. Reusable: the first stage costs USD 50 million to build (it needs landing legs and more engineering) and flies 20 times. Each flight needs USD 1.5 million of recovery and refurbishment, and the upper stage and other costs are the same. It carries 15,000 kg because it keeps fuel for landing. What is the cost per launch and per kilogram of each, and how many flights must the reusable stage make to beat the expendable one per kilogram? (Figures are illustrative.)
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
Who is the launch company?
What the interviewer says
A European medium-lift launcher company. Its expendable rocket has flown four times, all successfully.
History
Has the company landed a stage before?
What the interviewer says
Not yet. A smaller test vehicle made three short hops in 2025.
Objective
What is the decision?
What the interviewer says
Whether to spend USD 300 million developing a reusable first stage.
Financials
What does an expendable launch cost?
What the interviewer says
First stage USD 40 million, upper stage USD 10 million, and USD 10 million for the nose cone, fuel and launch operations. It carries 20,000 kg.
And the reusable version?
What the interviewer says
The first stage costs USD 50 million to build and is designed for 20 flights, with USD 1.5 million of recovery and refurbishment per flight. It carries 15,000 kg.
Market
How big is the launch market?
What the interviewer says
The Satellite Industry Association puts commercial launch at about USD 12.4 billion in 2025. SpaceX has flown one Falcon 9 first stage 37 times.
Customers
Who wants launches, and how heavy are their payloads?
What the interviewer says
Letters of intent cover about 10 launches a year. Eight are for satellite constellations under 15,000 kg; two are government payloads near 18,000 kg.
Competitors
Who are the main rivals?
What the interviewer says
SpaceX dominates commercial launch. Two other European firms are developing reusable stages for first flight around 2028.
Operations
How would recovery work?
What the interviewer says
The stage lands on a drone ship and returns to port. Refurbishment is planned at about six weeks per flight.
What else is in the budget?
What the interviewer says
A new engine test stand is already funded, and the head office is moving within Bremen.
Constraints
Anything limiting where it can land or launch?
What the interviewer says
European government payloads must launch from its current site, and the sea landing zone needs a permit renewed every two years.
Exhibits
Exhibit 1
| Line | Expendable | Reusable |
|---|---|---|
| First stage, per flight | 40 | 2.5 |
| Recovery and refurbishment | none | 1.5 |
| Upper stage | 10 | 10 |
| Nose cone, fuel and operations | 10 | 10 |
| Cost per launch | 60 | 24 |
| Payload (kg) | 20,000 | 15,000 |
| Cost per kg (USD) | 3,000 | 1,600 |
Illustrative figures.
Exhibit 2
Bar chart: Reusable cost per kilogram by number of flights per first stage (USD). Values in USD per kg. 1 flight: 4,766.67; 2 flights: 3,100; 3 flights: 2,544.44; 5 flights: 2,100; 10 flights: 1,766.67; 20 flights: 1,600.
Illustrative. Expendable cost is USD 3,000 per kg.
Solution
Show the solutionHide the solution
Structure
- Cost per kg = cost per launch / payload
- Expendable: every part is new each time
- Reusable: first stage cost / number of flights + refurbishment + upper stage + operations
- Break-even flights: when the reusable cost per kg equals the expendable one
Analysis
1. Expendable cost per launch
USD 40 million plus 10 plus 10, in USD millions.
Expendable cost per launch (USD millions): 40 + 10 + 10 = 60
2. Expendable cost per kg
USD 60 million divided by 20,000 kg.
Expendable cost per kg (USD): 60,000,000 ÷ 20,000 = 3,000
3. Reusable cost per launch
First stage share of 50 divided by 20, plus 1.5 of refurbishment, plus 10 for the upper stage and 10 of other costs.
Reusable cost per launch (USD millions): 50 ÷ 20 + 1.5 + 10 + 10 = 24
4. Reusable cost per kg
USD 24 million divided by 15,000 kg.
Reusable cost per kg (USD): 24,000,000 ÷ 15,000 = 1,600
5. Flights needed to break even
To match USD 3,000 per kg on 15,000 kg, a launch may cost up to USD 45 million. Take away the 21.5 million of costs paid every flight, which leaves 23.5 million for the first stage share: 50 divided by 23.5 is about 2.1, so the third flight already beats the expendable rocket.
Flights at which reuse breaks even: 50 ÷ (3,000 × 15,000 ÷ 1,000,000 - 1.5 - 10 - 10) = 2.13
6. Saving per reusable launch
Carrying 15,000 kg at USD 1,600 instead of USD 3,000 per kg.
Saving per launch (USD millions): (3,000 - 1,600) × 15,000 ÷ 1,000,000 = 21
7. Launches to repay the development cost
Building the reusable version costs USD 300 million of one-off development.
Launches to repay development: 300 ÷ 21 = 14.29
8. Years to repay at the expected launch rate
The company has letters of intent for about 10 launches a year, 8 of which fit the reusable payload.
Years to repay development: 300 ÷ (21 × 8) = 1.79
- Exhibit 1: The first stage drops from two thirds of the cost to about a tenth.
- Exhibit 2: The third flight beats the expendable rocket; most of the gain comes in the first ten flights.
Recommendation
The company should build the reusable version if it has enough launches to fly each first stage many times. On these numbers the cost per kilogram falls from about USD 3,000 to about USD 1,600, almost half. First, reuse spreads a USD 50 million stage over 20 flights, so it adds only USD 2.5 million per launch. Second, reuse pays for itself from about the third flight, so the real question is demand: a stage that flies twice a year gains little. Third, each reusable launch saves about USD 21 million. So the USD 300 million of development is repaid after about 14 launches, under two years at 8 suitable launches a year. This is a cost and capacity move: reuse turns the most expensive part into a shared asset. The risk is that refurbishment costs more than planned or that a lost stage wipes out the saving. As a next step, check how many launches a year the company can sell, including its own satellites.
Risks
- A failed landing loses the stage and its future flights
- Refurbishment may cost more and take longer than planned
- Without enough demand, stages sit idle and the saving shrinks
Next steps
- Turn the letters of intent into firm launch contracts with deposits
- Keep an expendable option for the heavy government payloads above 15,000 kg
- Test refurbishment cost and turnaround on the first three recovered stages before scaling
Demand is not the constraint; capacity is
With record backlogs, the question for many defence suppliers since 2024 has been how fast they can produce, not whether they will sell. Ramp-up depends on the slowest input: explosives and propellants, specialist steel, chips, test ranges, and skilled workers. In a capacity case, map the supply chain for the single slowest part before building a new final assembly line.
Check your understanding
Quick check
Why can a reusable rocket have a lower cost per kilogram even though it carries less?
Firm processes and online tests change from year to year and differ by office. Confirm the current steps on the firm’s own careers page.
Next lesson: Defence and space: players, trends, rules and cases
Sources
Math checked, facts checked against sources on 30 September 2026.
- Rheinmetall: half-yearly financial report H1 2026 (August 2026, official)
- Lockheed Martin: second quarter 2026 financial results (July 2026, official)
- BAE Systems: 2026 half year results (July 2026, official announcement)
- NATO: The Hague Summit Declaration, 25 June 2025 (official text)
- Spaceflight Now: Falcon 9 booster B1067 lands after a record 37th flight (August 2026)
- Recognized public explanations of case-interview concepts and terms
Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.