So What Club

Building materials economics: cost per tonne, delivered cost and carbon

What one tonne of cement costs to make and deliver, why the plant with the lowest delivered cost wins each city, how utilization moves cost per tonne, and what a carbon price adds.

Lesson 2 of 3 · 13 min

The idea

Customers compare delivered cost: the cost at the plant gate plus freight to their site. A plant with a low gate cost can still lose a distant city to a slightly more expensive plant next door. So in building materials, think in tonnes, kilometres and kiln utilization.

Worked case

Cost and EBITDA per tonne of cement

Case

Kalinga Cement, a fictional cement maker in Indonesia, sells about 8 million tonnes a year. Its profit has slipped for two years even though volumes held up. The new chief executive wants to know what Kalinga earns on each tonne and where to look first to raise it. What is its EBITDA per tonne, and where should it focus?

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • Tell me about Kalinga.

    What the interviewer says

    A fictional cement maker in Indonesia with three plants on Java, selling about 8 million tonnes a year to builders and ready-mix concrete firms.

History

  • What happened to profit?

    What the interviewer says

    It has slipped for two years while volumes held steady. Coal and power prices rose over the same period.

Objective

  • What does the chief executive want?

    What the interviewer says

    To know what each tonne earns and where to act first to raise profit.

Financials

  • What does Kalinga sell cement for?

    What the interviewer says

    An average of USD 70 a tonne, delivered to the customer.

  • What are its costs per tonne?

    What the interviewer says

    Power and fuel USD 20, raw materials USD 10, freight USD 14, staff and other plant costs USD 9, and selling and administration USD 5.

Market

  • How is demand moving?

    What the interviewer says

    Steady, with housing and roads growing. New plants in the region have added capacity, so prices have not kept pace with costs.

Customers

  • How do customers choose a supplier?

    What the interviewer says

    On delivered price per tonne. Most cement is sold within a few hundred kilometres of a plant.

Competitors

  • How do rivals compare?

    What the interviewer says

    Rival A spends about USD 17 a tonne on power and fuel and ships about 90 km on average. Rival B spends about USD 21 and ships about 160 km.

Operations

  • How far does Kalinga ship?

    What the interviewer says

    About 140 kilometres on average, by road, at about USD 0.10 per tonne per kilometre.

  • Could the kilns burn other fuels?

    What the interviewer says

    Yes, with some changes. Rice husks and other waste fuels are available near two of the plants.

  • Is anything else changing?

    What the interviewer says

    Kalinga is redesigning its cement bags and moving its head office within Jakarta.

Constraints

  • Can Kalinga raise prices?

    What the interviewer says

    Not easily. A rival with spare capacity would win customers who face a higher price.

Exhibits

Exhibit 1

From price to EBITDA for one tonne of Kalinga cement (USD)(USD per tonne)

Waterfall chart: From price to EBITDA for one tonne of Kalinga cement (USD). Values in USD per tonne. Delivered price, total: 70; Power and fuel, change: -20; Raw materials, change: -10; Freight, change: -14; Staff and plant, change: -9; Selling and admin, change: -5; EBITDA, total: 12.

Illustrative figures for a fictional company.

Exhibit 2

Kalinga and its two closest rivals
Kalinga and its two closest rivals
CompanyPower and fuel (USD per tonne)Average delivery distance (km)
Kalinga20140
Rival A1790
Rival B21160

Illustrative figures.

Solution

Show the solution

Structure

  • EBITDA per tonne = price per tonne minus cash costs per tonneThis comes from the goal: profit per tonne, then times tonnes sold.
    • Price per tonne (after discounts)
    • Cash costs per tonne: power and fuel, raw materials, freight, plant costs, selling and administration

Analysis

  1. 1. Total cash cost

    Add the five cost lines.

    Cash cost (USD per tonne): 20 + 10 + 14 + 9 + 5 = 58

  2. 2. EBITDA per tonne

    Price 70 minus cash cost 58.

    EBITDA (USD per tonne): 70 - (20 + 10 + 14 + 9 + 5) = 12

  3. 3. EBITDA margin

    12 divided by 70.

    EBITDA margin (fraction): 12 ÷ 70 = 0.1714

  4. 4. Energy and freight share

    Power, fuel and freight together, as a share of price.

    Energy and freight share of price (fraction): (20 + 14) ÷ 70 = 0.4857

  5. 5. EBITDA a year

    USD 12 a tonne on about 8 million tonnes, in USD millions.

    EBITDA a year (USD millions): (70 - (20 + 10 + 14 + 9 + 5)) × 8 = 96

  6. 6. Exposure to fuel prices

    A 10 percent rise in power and fuel costs USD 2 a tonne, as a share of EBITDA.

    Share of EBITDA lost to a 10 percent fuel rise (fraction): 20 × 0.1 ÷ (70 - (20 + 10 + 14 + 9 + 5)) = 0.1667

  7. 7. Where freight comes from

    An average road haul of 140 kilometres at about USD 0.10 per tonne per kilometre.

    Freight per tonne (USD): 140 × 0.1 = 14

  • Exhibit 1: Energy and freight together are almost three times the EBITDA.
  • Exhibit 2: Rival A spends less on both fuel and freight, so Kalinga's gap is in its own costs, not in prices.

Recommendation

Kalinga earns about USD 12 of EBITDA per tonne, a margin of about 17 percent, so any plan to raise profit should start with energy and freight. Cement is heavy, cheap and energy hungry, so profit is won in the kiln and on the road. First, power, fuel and freight take about 49 percent of the price, far more than any other line. Second, this means a 10 percent rise in fuel prices costs USD 2 a tonne, a sixth of EBITDA, unless prices rise too. Third, Kalinga hauls cement about 140 kilometres on average, against 90 for its lowest-cost rival, which spends about USD 3 less a tonne on power and fuel. The strategic move is cost restructuring: switch part of the kiln to cheaper alternative fuels and sell more near the plants. The risk is that cutting freight by selling only nearby lowers volume. As a next step, compare fuel cost per tonne and average lead distance with the two closest rivals.

Risks

  • Prices in a region move with the balance of local capacity and demand, not with costs
  • Fuel prices can swing quickly; a plant that can burn several fuels is less exposed
  • Alternative fuels such as rice husks need steady local supply and kiln changes

Next steps

  • Compare fuel cost per tonne and average delivery distance with the two closest rivals
  • Price a kiln change to burn more alternative fuel
  • Map customers by distance and the delivered price each one pays

Delivered cost decides who wins each city

Worked case

Can a low-cost plant win a distant city?

Case

Kalinga Cement's newest plant, Plant A, has the lowest cost at the gate of any plant in the region. The sales team wants to use it to win City Two, a fast-growing city 350 kilometres away. A rival's older plant, Plant B, sits just 20 kilometres from that city. Can Plant A win City Two by road, and what should Kalinga do?

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation
  • Tell me about Plant A.

    What the interviewer says

    Kalinga's newest plant, opened three years ago. Its cash cost at the gate is about USD 45 a tonne, the lowest in the region.

History
  • Has Kalinga tried to sell in City Two before?

    What the interviewer says

    Last year it offered discounts there and won very little volume.

Objective
  • What does the sales team want?

    What the interviewer says

    To fill Plant A by winning a large share of City Two.

Financials
  • What does the rival's plant cost to run?

    What the interviewer says

    We estimate Plant B's cash cost at about USD 52 a tonne at the gate.

Market
  • How big is City Two?

    What the interviewer says

    It uses about 3 million tonnes of cement a year, growing about 6 percent a year.

Customers
  • How do customers in City Two buy?

    What the interviewer says

    Ready-mix firms and builders buy on delivered price and want next-day delivery.

Competitors
  • Where is the rival plant?

    What the interviewer says

    Plant B sits 20 kilometres from City Two. City Two is 350 kilometres from Plant A.

Operations
  • What does road freight cost?

    What the interviewer says

    About USD 0.10 per tonne per kilometre.

  • Are there other ways to move cement?

    What the interviewer says

    A rail line runs near Plant A. Rail costs about USD 0.04 per tonne per kilometre, plus USD 4 a tonne to load and unload. City Two also has a port.

  • Is anything else changing at Plant A?

    What the interviewer says

    It is adding a solar farm on spare land and a new laboratory.

Constraints
  • Does Plant A have spare capacity?

    What the interviewer says

    Yes. It runs at about 75 percent of capacity.

Exhibit

Exhibit 1
Two plants and City Two
Two plants and City Two
PlantCash cost at the gate (USD per tonne)Distance to City Two (km)
Plant A (Kalinga)45350
Plant B (rival)5220

Illustrative figures.

Solution

Show the solution
Structure
  • Delivered cost = gate cost + freight per tonne per km x distance
    • Plant A: 45 + 0.10 x 350
    • Plant B: 52 + 0.10 x 20
Analysis
  1. 1. Plant A delivered

    Gate cost 45 plus 350 km of freight.

    Plant A delivered cost (USD per tonne): 45 + 0.1 × 350 = 80

  2. 2. Plant B delivered

    Gate cost 52 plus 20 km of freight.

    Plant B delivered cost (USD per tonne): 52 + 0.1 × 20 = 54

  3. 3. Gap

    How much more Plant A pays to reach City Two.

    Delivered cost gap (USD per tonne): (45 + 0.1 × 350) - (52 + 0.1 × 20) = 26

  4. 4. Break-even distance

    How far Plant A can ship before its USD 7 gate advantage is used up, against a rival at the customer's door.

    Distance where the gate advantage is used up (km): (52 - 45) ÷ 0.1 = 70

  5. 5. Plant A by rail

    Rail costs about USD 0.04 per tonne per kilometre, plus USD 4 a tonne to load and unload.

    Plant A delivered cost by rail (USD per tonne): 45 + 0.04 × 350 + 4 = 63

  6. 6. Gap that rail leaves

    Rail against Plant B by road.

    Gap to Plant B with rail (USD per tonne): (45 + 0.04 × 350 + 4) - (52 + 0.1 × 20) = 9

  • The exhibit: Plant A is USD 7 cheaper at the gate but 330 km further away.
Recommendation

Plant A should not try to win City Two by road. Its delivered cost is about USD 26 a tonne higher than Plant B's, even though its gate cost is USD 7 lower. In cement, customers compare delivered cost, so distance beats a cheap gate. First, 350 kilometres of road freight adds USD 35 a tonne. Second, this means Plant A's cost advantage only lasts for about 70 kilometres beyond a rival's door. Third, even rail at USD 0.04 per tonne per kilometre leaves Plant A about USD 9 a tonne behind. The strategic move to study is a grinding unit near City Two, fed with clinker, which brings Kalinga to the customer's door. The risk is that cheaper sea freight changes the answer. As a next step, check whether a rail link or a grinding unit near City Two would cut the delivered cost.

Risks
  • Rail and sea freight are much cheaper per tonne-kilometre than road, so a coastal plant can reach far cities
  • A rival may price below its full cost to keep its kiln full
  • A price cut to win City Two would lose money on every tonne shipped there
Next steps
  • Price a grinding unit near City Two and the clinker shipments it would need
  • Focus Plant A's sales on places no more than about 70 km further from it than from the nearest rival plant
  • Ask the port in City Two for sea freight and handling rates

This is why cement makers build grinding units close to big cities: they ship clinker, which is denser and easier to move in bulk, from the kiln near the limestone, and grind it into cement near the customers, often blending in local fly ash from power plants or slag from steel mills. It is also why imports by sea can set the ceiling on prices in coastal cities, while inland cities are protected by distance.

Utilization: why a half-empty kiln hurts

Worked case

Fixed cost per tonne at two utilization levels

Case

Riverkiln Cement (a fictional cement maker in northern Vietnam) runs one plant with capacity of 5 million tonnes a year and fixed costs (staff, maintenance, insurance, overheads) of USD 75 million a year. Last year the plant ran at 80 percent of capacity; this year it is running at about 60 percent. The owner wants to know what the fall does to cost and profit per tonne, and where to act first. What is the fixed cost per tonne at 80 percent and at 60 percent utilization, and what should Riverkiln do?

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation
  • What is the plant, and who does it sell to?

    What the interviewer says

    One kiln with capacity of 5 million tonnes a year in northern Vietnam. About 65 percent is sold in bags through dealers and 35 percent in bulk to ready-mix concrete firms.

History
  • How has volume moved?

    What the interviewer says

    The plant ran at about 80 percent last year, or 4 million tonnes. This year it is running at about 60 percent, a rate of 3 million tonnes.

  • Has the management team changed?

    What the interviewer says

    A new sales director joined in the spring from a steel company.

Objective
  • What does the owner want?

    What the interviewer says

    To know what the fall in volume does to cost and profit per tonne, and where to act first.

Financials
  • What are the fixed costs?

    What the interviewer says

    USD 75 million a year: staff USD 30 million, maintenance USD 25 million, and insurance and overheads USD 20 million.

  • What is the price, and which costs move with volume?

    What the interviewer says

    The average price is USD 60 a tonne after discounts. Power, fuel, raw materials and freight come to about USD 30 a tonne and move with volume.

Market
  • How is demand in the region?

    What the interviewer says

    Regional cement demand fell about 8 percent this year as property building slowed. Across Vietnam, capacity was more than 120 million tonnes against home use under 60 million in mid 2024, as reported by Global Cement.

Customers
  • How loyal are the dealers?

    What the interviewer says

    Most dealers stock two or three brands and move orders for a dollar or two a tonne.

Competitors
  • What are rivals doing?

    What the interviewer says

    A rival opened a 2 million tonne plant 100 kilometres away last year and sells about USD 3 a tonne below Riverkiln.

Operations
  • Could the plant export?

    What the interviewer says

    The plant is 40 kilometres from a port. A trader offers a netback of about USD 36 a tonne for up to 0.5 million tonnes of clinker a year, after freight and port costs.

  • Is anything else changing at the plant?

    What the interviewer says

    A new bag printing line goes in next month, and the staff canteen is being refitted.

Constraints
  • Can fixed costs be cut quickly?

    What the interviewer says

    Only about USD 5 million in the next year. The kiln needs the same crew whether it runs at 60 or 80 percent.

Exhibits

Exhibit 1
Riverkiln fixed cost per tonne by utilization (USD per tonne)

Bar chart: Riverkiln fixed cost per tonne by utilization (USD per tonne). Values in USD per tonne. 50 percent: 30; 60 percent: 25; 70 percent: 21.43; 80 percent: 18.75; 90 percent: 16.67.

Illustrative figures for a fictional company. Fixed costs USD 75 million a year; capacity 5 million tonnes.

Exhibit 2
Riverkiln last year and this year
Riverkiln last year and this year
Measure80 percent (last year)60 percent (this year)
Output (million tonnes)43
Fixed cost (USD per tonne)18.7525
EBITDA (USD per tonne)11.255
EBITDA (USD millions a year)4515

Illustrative figures for a fictional company. Price USD 60 and variable cost USD 30 a tonne in both years.

Solution

Show the solution
Structure
  • Fixed cost per tonne = fixed costs divided by tonnes produced
    • Tonnes produced = capacity x utilization
    • EBITDA per tonne = price minus variable cost minus fixed cost per tonne
    • Cause of the fall: our share of the market, or the whole market
    • Options: win back volume, export surplus tonnes, cut fixed costs
Analysis
  1. 1. At 80 percent

    Output 4 million tonnes.

    Fixed cost at 80 percent (USD per tonne): 75 ÷ (5 × 0.8) = 18.75

  2. 2. At 60 percent

    Output 3 million tonnes.

    Fixed cost at 60 percent (USD per tonne): 75 ÷ (5 × 0.6) = 25

  3. 3. Difference

    Extra fixed cost carried by each tonne.

    Increase in fixed cost (USD per tonne): 75 ÷ (5 × 0.6) - 75 ÷ (5 × 0.8) = 6.25

  4. 4. EBITDA per tonne at 80 percent

    Price USD 60 minus USD 30 of variable cost minus USD 18.75 of fixed cost.

    EBITDA at 80 percent (USD per tonne): 60 - 30 - 75 ÷ (5 × 0.8) = 11.25

  5. 5. EBITDA per tonne at 60 percent

    The same price and variable cost, with USD 25 of fixed cost.

    EBITDA at 60 percent (USD per tonne): 60 - 30 - 75 ÷ (5 × 0.6) = 5

  6. 6. Yearly EBITDA at each level

    At 80 percent: USD 30 of contribution on 4 million tonnes, minus USD 75 million of fixed costs, in USD millions.

    Yearly EBITDA at 80 percent (USD millions): (60 - 30) × 4 - 75 = 45

  7. 7. Yearly EBITDA at 60 percent

    USD 30 of contribution on 3 million tonnes, minus the same fixed costs, in USD millions.

    Yearly EBITDA at 60 percent (USD millions): (60 - 30) × 3 - 75 = 15

  8. 8. Exporting 0.5 million tonnes of clinker

    The export netback is USD 36 a tonne against a cash cost of USD 30, in USD millions a year.

    Extra EBITDA from exports (USD millions): (36 - 30) × 0.5 = 3

  • Exhibit 1: Fixed cost per tonne rises faster the emptier the kiln gets.
  • Exhibit 2: A quarter less volume cut yearly EBITDA by two thirds.
Recommendation

The plant should treat volume as its first lever, because falling from 80 to 60 percent utilization adds about USD 6 of fixed cost to every tonne. First, the same USD 75 million is spread over 3 million tonnes instead of 4 million. Second, against EBITDA of about USD 10 to 15 a tonne, this means a slump in volume can wipe out half the profit or more: EBITDA falls from USD 11.25 to USD 5 a tonne, and from USD 45 million to USD 15 million a year. Third, the slump comes partly from the market and partly from a new rival, so Riverkiln cannot simply wait for demand to return. Exporting 0.5 million tonnes of clinker at a USD 36 netback adds about USD 3 million a year and fills part of the kiln. The risk is that chasing volume with price cuts starts a price war that hurts every plant in the region. As a next step, map regional capacity and demand to see whether the slump is ours or the whole market's.

Risks
  • A price cut to win back dealers may be matched by the new rival, leaving volume flat and margin lower
  • Export netbacks move with freight rates and with prices in other oversupplied Asian markets
  • Cutting maintenance to save fixed costs can lead to kiln stoppages later
Next steps
  • Map regional capacity and demand to see how much of the fall is the market and how much is lost share
  • Ask the port for clinker export terms and test a first 100,000 tonne shipment
  • Find which dealers moved to the new rival and what price gap made them move

Carbon: a new cost line

Making clinker releases carbon dioxide twice: once from burning fuel to heat the kiln, and once from the limestone itself, which gives off carbon dioxide as it turns into lime. The second part cannot be avoided by switching fuel, which is why cement is one of the hardest industries to decarbonize. The main levers are a lower clinker factor (blending in fly ash, slag or calcined clay), alternative fuels such as waste, more efficient kilns, and carbon capture. Where carbon has a price, as in the EU Emissions Trading System, every tonne of carbon dioxide becomes a cost.

Try it yourself

Timed math drill

A tonne of cement contains 0.7 tonnes of clinker (a clinker factor of 0.7). Each tonne of clinker releases about 0.85 tonnes of carbon dioxide. If carbon costs EUR 70 per tonne of carbon dioxide, what is the carbon cost per tonne of cement, in EUR? (Illustrative figures.)

Timed math drill

An electric arc furnace mill makes rebar from scrap. One tonne of rebar needs about 1.1 tonnes of scrap. Scrap costs USD 380 per tonne and rebar sells for USD 600 per tonne. What is the metal spread per tonne of rebar, in USD? (Illustrative figures.)

Next lesson: Building materials players, trends 2024 to 2026, and how to crack the cases

Sources

Math checked, facts checked against sources on 16 June 2026.

  • Recognized public explanations of case-interview concepts and terms

Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.