So What Club

Data centres, cloud and AI compute

Companies build buildings full of computers, fill them with power and cooling, and rent out space or computing time to businesses, cloud users and AI labs.

36 min read

Overview

A data centre is a secure building full of computers, with power, cooling and fibre. This industry builds those buildings, fills them with chips, and rents out either the space and power (colocation) or the computing itself (cloud and AI compute). Customers are businesses, governments, app makers and AI labs. Cloud infrastructure spending reached about USD 143 billion in just the second quarter of 2026, and the largest cloud firms each plan to spend close to USD 200 billion on capital in 2026, mostly for AI.

How big it is

The sub-industries

  1. 1.Hyperscale public cloud
  2. 2.Retail colocation and interconnection
  3. 3.Hyperscale and build-to-suit developers
  4. 4.GPU clouds (neoclouds)
  5. 5.Power and cooling equipment for data centres
  6. 6.AI model and inference platforms

Equipment makers supply power and cooling kit; developers and colocation firms build and run the buildings. Hyperscale clouds and GPU clouds fill them with chips and sell computing by the hour. AI model companies rent that computing to train models and sell answers to apps and businesses.

How it works

Follow the product from raw inputs to the customer. Each step says what happens, what goes in and out, who does it, and how much margin it keeps.

  1. Power and land

    Margin varies

    Developers find land near a strong grid connection, sign long contracts for electricity, and wait for the utility to deliver the power.

    Inputs in
    Land with zoning, Grid connection, Power purchase agreements
    Outputs out
    A powered site ready to build on
    Who does it
    Developers, utilities and power producers, such as NextEra in the US, Adani Green in India and ACWA Power in Saudi Arabia.
    Value added
    A large grid connection can take years to get. A site with power secured is worth far more than land alone, because power is the bottleneck.
  2. Electrical and cooling equipment

    Medium margin

    Makers supply transformers, switchgear, backup generators, batteries, chillers and liquid cooling systems.

    Inputs in
    Copper, steel and electronics, Factory capacity, Engineering
    Outputs out
    Power distribution and backup systems, Air and liquid cooling systems
    Who does it
    Schneider Electric (France), Vertiv and Eaton (US), ABB (Switzerland), Siemens Energy and Hitachi Energy for transformers.
    Value added
    Keeps servers running without a single second of power loss and removes their heat. When everyone builds at once, delivery slots become scarce and valuable.
  3. Design and construction

    Thin margin

    Builders put up the shell, install power and cooling, and test the site before handing it over.

    Inputs in
    Construction labour, Concrete and steel, Equipment from suppliers
    Outputs out
    A finished data hall measured in MW of IT capacity
    Who does it
    Specialist contractors such as Turner and DPR (US), Mercury (Ireland) and Larsen and Toubro (India), or the hyperscaler's own teams.
    Value added
    Turns land, power and kit into usable capacity on time. Build costs rose about 21 percent per MW from late 2024 to 2026.
  4. Chips, servers and networking

    Fat margin

    AI chips and processors are built into servers and racks, joined by fast networks, and shipped to the site.

    Inputs in
    GPUs and processors, Memory and storage, Network switches and optical links
    Outputs out
    Server racks ready to plug in
    Who does it
    Nvidia and AMD for chips, plus custom chips from Google, Amazon and Microsoft; servers from Foxconn, Quanta, Dell and Supermicro.
    Value added
    Supplies the computing power itself. Chips make up more than half of the cost of an AI data centre, and the leading designer earns very high margins.
  5. Facility operation and colocation

    Medium margin

    Operators run the building all day and night, rent space and power to tenants, and connect them to networks and clouds.

    Inputs in
    Finished halls, Operations staff, Fibre connections
    Outputs out
    Rented capacity per kW, Cross-connects between customers and networks
    Who does it
    Equinix, Digital Realty, NTT Data, AirTrunk, Khazna (UAE), Yotta (India), STT GDC (Singapore).
    Value added
    Gives tenants secure, reliable space without building their own. Busy sites with many networks become meeting points worth paying extra for.
  6. Cloud and GPU computing

    Margin varies

    Cloud firms run servers in their own or rented halls and sell computing, storage and AI chips by the hour or by use.

    Inputs in
    Data centre capacity, Servers and chips, Software and engineers
    Outputs out
    Virtual servers, storage and databases, GPU hours, Managed AI services
    Who does it
    Amazon Web Services, Microsoft Azure, Google Cloud, Oracle, Alibaba Cloud, and GPU clouds such as CoreWeave and Nebius.
    Value added
    Lets customers rent exactly the computing they need, when they need it, without buying hardware. The cloud firm earns by keeping servers busy.
  7. AI models and platforms

    Margin varies

    AI labs train models on large GPU clusters, then sell answers through apps and programming interfaces.

    Inputs in
    GPU hours, Training data, Researchers
    Outputs out
    AI models, Chat apps and model access priced per token
    Who does it
    OpenAI, Anthropic and Google (US), Mistral AI (France), G42 (UAE), Sarvam AI (India), DeepSeek and Alibaba (China).
    Value added
    Turns raw computing into useful answers, code and content that businesses and people pay for.
  8. Software and end users

    Margin varies

    Software firms, banks, retailers, governments and consumers use cloud and AI services in their products and work.

    Inputs in
    Cloud and AI services, Their own data and staff
    Outputs out
    Apps, digital services and business processes
    Who does it
    Every kind of business, from Netflix and Shopify to banks and governments.
    Value added
    Where the computing finally creates value for customers, through faster service, lower cost or new products.
  9. Reuse and recycling

    Thin margin

    Old servers and chips are resold, reused for lighter work, or broken down to recover metals.

    Inputs in
    Retired servers and GPUs, Testing and data wiping
    Outputs out
    Second-hand hardware, Recovered metals
    Who does it
    IT asset disposal firms such as Sims Lifecycle Services and Iron Mountain, and second-hand GPU brokers.
    Value added
    Recovers some value from chips that are too old for frontier AI but still useful.

Value built step by step

How the price of one unit grows as it passes each step, and who gets each slice.

Illustrative, rounded figures. One unit: one AI GPU hour sold for USD 2.50 by a GPU cloud, with the chip busy 70 percent of the time (costs built up layer by layer).

Value built step by step: One AI GPU hour sold for USD 2.50 by a GPU cloud, with the chip busy 70 percent of the time (costs built up layer by layer)
StagePrice outValue addedWhere it goes
1. Electricity from the power producer and gridUSD 0.13+USD 0.13About 1.25 kW including cooling at about USD 0.10 per kWh, paid to the utility.
2. Data centre space, power delivery, cooling and networkUSD 0.36+USD 0.23Colocation rent and network fees paid to the building operator, which also pays back the equipment makers and builders.
3. Chip manufacture: foundry, memory and packagingUSD 0.56+USD 0.20Foundries such as TSMC and memory makers such as SK hynix, through the price of the chip spread over five years.
4. Chip designer's margin and researchUSD 1.01+USD 0.45The chip designer, such as Nvidia, which prices the chip far above its cost to make.
5. Server makers and network gearUSD 1.16+USD 0.15Server builders such as Foxconn or Supermicro, and network switch makers.
6. Cost of idle hoursUSD 1.65+USD 0.49Nobody pays for the 30 percent of hours the chip sits idle, so the cost of those hours lands on the hours that are sold.
7. Interest on money borrowed to buy chipsUSD 1.95+USD 0.30Lenders who funded the chips, often at high rates for newer GPU clouds.
8. GPU cloud staff, software, sales and profitUSD 2.50+USD 0.55The GPU cloud's own costs and a thin profit.

Each step's share of the final price (USD 2.50)

  1. 1. Electricity from the power producer and grid5.2%
  2. 2. Data centre space, power delivery, cooling and network9.2%
  3. 3. Chip manufacture: foundry, memory and packaging8%
  4. 4. Chip designer's margin and research18%
  5. 5. Server makers and network gear6%
  6. 6. Cost of idle hours20%
  7. 7. Interest on money borrowed to buy chips12%
  8. 8. GPU cloud staff, software, sales and profit22%

So what: The chip designer captures the largest single slice, while the GPU cloud keeps only part of the last 55 cents and carries the risk of idle time and debt. If utilization falls or prices drop by a third, the GPU cloud's margin vanishes first. That is why the profit sits with the chip makers and the hyperscalers today.

Inputs and outputs

Key inputs

The main costs and materials, and their weight in total cost.

Key inputs
InputWhat it is forShare of cost
ElectricityRunning servers and cooling all day and night; a site's size is measured in MW of power.usually passed on to colocation tenants; about 5 to 15 percent of a GPU cloud's costs
Grid connection and power contractsGetting enough firm power to a site, often the slowest step.power infrastructure is about 21 percent of build cost(source 5)
AI chips and serversThe computing itself; GPUs for AI, processors for general cloud.more than half of AI data centre capital spending; the largest cost for clouds(source 19)
Building and landShell, sitework and land for the halls.core, shell and sitework about 17 percent and land about 7 percent of build cost(source 5)
Cooling systemsRemoving heat; AI racks need liquid cooling piped to the chips.a large part of mechanical build cost, plus power for cooling every hour
Network and fibreLinking servers inside the site and the site to users and clouds.about 5 to 15 percent of a cloud's equipment cost, more for AI clusters
WaterCooling in many designs, especially in hot climates.small in cost but often limits where sites can be built
Skilled staffEngineers who run sites, software engineers who run clouds, researchers who build models.about 5 to 10 percent of revenue for colocation; larger for clouds and AI labs
Capital and debtFunding buildings and chips years before revenue arrives.interest was about 25 percent of revenue at one large GPU cloud in mid-2026(source 11)

Outputs

What the industry produces, by-products included.

  • Rented data centre capacity, priced per kW per month
  • Cloud computing, storage and databases sold by use
  • GPU hours for AI training and inference
  • AI model access priced per token, and AI apps
  • Interconnection between networks, clouds and businesses
  • By-products: large amounts of waste heat (sometimes reused for district heating in the Nordics) and retired servers

Business models

The ways companies here make money.

Business models
ModelHow it earnsExamplesTypical margin
Retail colocation and interconnectionRents racks and cages per kW per month and charges fees for each cross-connect between customers and networks.Equinix, Digital Realty, NTT Data, STT GDCEBITDA about 50 percent; operating about 20 percent
Wholesale and build-to-suitBuilds whole halls or campuses for one large tenant and rents them on leases of 10 to 15 years or more at a lower price per kW.AirTrunk, Vantage, QTS, Khazna, Yotta, CtrlSEBITDA 50 to 70 percent once leased; thin returns if halls sit empty
Hyperscale public cloudSells computing, storage, databases and AI services by the hour or by use to millions of customers.Amazon Web Services, Microsoft Azure, Google Cloud, Oracle, Alibaba Cloudoperating 25 to 40 percent at the leaders
GPU cloudRents AI chips by the hour or on contracts of one to five years, often funded with debt.CoreWeave, Nebius, Lambda, Crusoe, Yotta Shakti CloudEBITDA can be high, yet net losses are common after depreciation and interest
AI model accessCharges per token used through programming interfaces, or a monthly subscription for chat apps.OpenAI, Anthropic, Google, Mistral AIvaries widely; heavy training costs mean many labs lose money
Equipment supplySells power and cooling systems for new builds, then earns service fees.Schneider Electric, Vertiv, Eaton, ABBoperating 15 to 25 percent

Business model patterns: fill the assets, subscription, commodity. Spot the pattern in a new industry and you already know the first questions to ask.

Revenue and profit

What drives revenue

MW leased or chips rented
Revenue grows with capacity sold; every leased MW or busy GPU earns, while empty ones earn nothing.
Price per kW or per GPU hour
Tight supply lifts rents; new chips push down prices for older GPUs, so price can fall by a third in a year.
AI demand from labs and enterprises
Training and inference both need large clusters; big AI contracts can fill a campus at once.
Contract length
Long leases and multi-year GPU contracts lock in revenue and make borrowing cheaper.
Interconnection density
In retail colocation, each new customer adds value to the others, so cross-connect fees grow faster than space.
Data residency and sovereign AI
Laws that keep data in the country and government AI programmes create local demand in India, the Gulf and Europe.
Range of cloud services
Clouds sell databases, analytics and AI on top of basic computing, which lifts revenue per customer.

What drives profit

Utilization
Buildings and chips cost the same whether busy or idle. A GPU renting 70 percent of hours makes money; at about 46 percent it only breaks even.
Chip life and depreciation
Writing chips off over three years instead of five makes yearly cost much higher, so the assumed life can swing profit more than price.
Cost of power
Cheap, steady power lowers cost per GPU hour and is the main reason sites move to the Nordics, the Gulf, Texas or Johor.
PUE (power efficiency)
A lower PUE means less power wasted on cooling. The industry average was about 1.54 in 2025; new AI sites aim for 1.1 to 1.3.
Build cost and speed
Faster builds start earning sooner. Build costs of about USD 8.9 million to 23.3 million per MW decide the yield on each project.
Cost of capital
Most capacity is funded with debt, so interest rates and lender confidence move profit directly.
Custom chips
Hyperscalers that design their own chips, such as Google's TPUs, pay less than buying from Nvidia.

How costs divide

For a typical company, as a share of revenue.

Costs as a share of revenue
Cost lineShare of revenue
Operating costs before depreciation at a colocation leader (staff, maintenance, power not passed through, rent, sales)about 50 percent of revenue; Equinix adjusted EBITDA margin about 49 percent in 2025(source 12)
Depreciation and other costs below EBITDA at a colocation leaderabout 30 percent of revenue(source 12)
Operating profit at a colocation leaderabout 20 percent of revenue(source 12)
Capital spending at a colocation leadernearly half of revenue (about 47 percent) in 2025(source 12)
Interest at a GPU cloudabout 25 percent of revenue at CoreWeave in the second quarter of 2026(source 11)
Depreciation of chips at a GPU cloudoften 40 to 50 percent of revenue
Electricity at a GPU cloudabout 5 to 10 percent of revenue

Worked example: one unit

  1. Start with the revenue

    One AI GPU rented out by the hour for a year: USD 15,330 comes in.

    GPU hours sold: 8,760 hours x 70 percent x USD 2.50

  2. Take away the unit's own costs

    3 costs take USD 10,095, 66% of revenue.

    The biggest: depreciation: USD 35,000 GPU and server share over five years, at 46%.

  3. See what is left

    USD 5,235 is left, 34% of revenue. This is the unit's contribution.

See the numbers
The unit: One AI GPU rented out by the hour for a year (busy 70 percent of the time at USD 2.50 an hour). Illustrative, rounded figures.
LineAmountShare
GPU hours sold: 8,760 hours x 70 percent x USD 2.50USD 15,330100%
Minus Depreciation: USD 35,000 GPU and server share over five yearsUSD 7,00046%
Minus Electricity: 1.25 kW including cooling x 8,760 hours x USD 0.10 per kWhUSD 1,0957.1%
Minus Colocation rent, network and supportUSD 2,00013%
What is left (contribution)USD 5,23534%

Check: USD 15,330 minus USD 10,095 of costs leaves USD 5,235.

So what: The GPU breaks even at about 46 percent utilisation, and profit swings far more than revenue. Price and chip life move it most: at USD 1.80 an hour profit falls below USD 1,000, and writing the chip off over three years instead of five cuts it below USD 600, before any interest on the money borrowed to buy it.

Who keeps the profit

Most profit today sits with the chip makers, above all Nvidia, and with the hyperscalers that sell cloud at scale. Colocation earns a steady, property-like return on long leases. GPU clouds and new builders earn the thinnest and riskiest margins, because they borrow to buy chips that lose value quickly. AI labs spend heavily on computing and are still proving they can earn more than they spend.

What wins

Selling points

What lets the best companies win customers.

Power in hand
A site with a signed, large grid connection can sign tenants now, while rivals wait years. In 2026 power, not land, decides who wins.
Interconnection hubs
Equinix sites in cities such as London, Frankfurt and Singapore host hundreds of networks, so customers go there to connect to everyone at once.
Breadth of cloud services
AWS, Azure and Google Cloud offer hundreds of services in one place, which makes it simpler for businesses to build everything on one cloud.
Access to the newest chips
Clouds that get new Nvidia chips first win AI labs, which need the fastest hardware to train frontier models.
Speed to build
Developers that can deliver a 100 MW hall in under two years win hyperscale contracts.
Local presence and trust
Governments and banks in India, the Gulf and Europe prefer providers that keep data in the country, such as Yotta, Khazna or center3.

Moats

Defences that keep competitors out for years.

Secured power and permits
Grid connections and planning permits take years and are limited in many cities, such as Dublin, Amsterdam and Singapore, so existing sites are hard to copy.
Network effects in interconnection
Each extra network in a retail colocation site makes it more valuable to the next tenant, so busy sites stay busy.
Scale in cloud
Hyperscalers buy chips, power and equipment at volumes no rival can match, giving them lower cost per unit.
Customer switching costs
Moving data and software out of one cloud is slow and costly, and moving racks between buildings is disruptive.
Long leases with strong tenants
Leases of 10 to 15 years with hyperscalers give steady income that lenders fund cheaply.
Custom chips and software
Hyperscalers' own chips and software stacks lower their costs and tie customers in.

SWOT

Strengths and weaknesses of the industry today, and the opportunities and threats ahead.

Strengths

  • Demand growing faster than at any time in years: cloud spending grew about 43 percent in the second quarter of 2026.
  • Long leases and contracted backlogs that give revenue visibility.
  • High barriers to entry from power, permits and capital.
  • Essential to almost every business and to AI.
  • Hyperscalers' deep pockets and existing customer bases.

Weaknesses

  • Huge capital needs, often funded by debt.
  • Chips lose value in a few years while buildings last decades, a mismatch that is easy to misprice.
  • Dependence on one main chip supplier for AI.
  • Heavy use of power and water, which draws public and regulatory pushback.
  • Customer concentration: a few hyperscalers and AI labs sign most large leases.

Opportunities

  • AI inference as millions of businesses add AI to daily work.
  • Sovereign AI programmes in India, the Gulf and Europe.
  • New markets with power to spare, such as Saudi Arabia, the UAE, the Nordics, Johor in Malaysia and parts of India.
  • Liquid cooling and heat reuse.
  • Renewable power and on-site generation deals.

Threats

  • An AI spending slowdown leaving new capacity empty just as it comes online.
  • GPU prices falling fast as newer chips arrive.
  • Grid limits and moratoriums on new sites, as some cities have imposed.
  • Export controls that limit which countries can buy advanced chips.
  • Rising interest rates that raise funding costs.
  • More efficient AI models that need less computing per answer.

Rules and risks

Rules that shape the money

  • Data protection and residency laws, such as the EU GDPR, India's Digital Personal Data Protection Act 2023 and Saudi Arabia's Personal Data Protection Law, push some data to stay in the country and create local demand.
  • Grid connections and planning permits are controlled locally. In Ireland data centres used 23 percent of metered electricity in 2025, and new connections near Dublin have been tightly limited.(source 15)
  • The EU Energy Efficiency Directive requires larger data centres to report energy and water use.
  • US export rules decide which countries and buyers can get advanced AI chips. From January 2026, licences for chips such as Nvidia's H200 to China are reviewed case by case.(source 20)
  • Governments fund AI compute directly: India's IndiaAI Mission offers more than 38,000 GPUs to startups and researchers at about INR 65 per GPU hour.(source 16)
  • The EU plans EUR 20 billion for AI gigafactories within its InvestAI programme.(source 17)

Cycles and risks

  • Data centres are built in waves. Chips, transformers and cooling are ordered at once, capacity arrives two or three years later, and if demand slows, rents and GPU prices fall just as it opens.
  • GPU prices fell from their 2024 peak on many platforms; AWS cut on-demand H100 instance prices by up to about 45 percent in June 2025, which squeezed smaller GPU clouds.(source 8)
  • Investors now question when record capital spending will pay back, and a cut in hyperscaler budgets would hit equipment makers, developers and chip makers together.(source 10)
  • Power shortages delay projects: the IEA expects data centre electricity use to roughly double from 2024 to 2030.(source 1)
  • Long equipment lead times, such as about a year for large transformers, can leave a building finished but unpowered.
  • Each new chip generation makes older GPUs worth less, so the assumed useful life of chips is a key risk.

Sub-industries

Each one broken down the same way. Open the ones you need.

Hyperscale public cloudVery large companies that rent computing, storage and AI tools over the internet to millions of customers.

Hyperscale public cloud: How it differs

They own both the buildings and the servers and sell computing by use, not by space. Three US firms hold about two thirds of the market, and they also design their own chips. Their scale lets them earn strong margins even while spending record sums on AI capacity.

Hyperscale public cloud: Customers

Startups, large companies, governments, app makers and AI labs.

Hyperscale public cloud: Supply chain

  1. Sites and power

    Medium margin

    The cloud builds its own campuses or leases halls from developers.

    Inputs in
    Land and power, Construction
    Outputs out
    Cloud regions
    Who does it
    The hyperscalers with developers such as Vantage and AirTrunk.
    Value added
    Gives capacity close to customers.
  2. Servers and chips

    Fat margin

    The cloud buys or designs chips and servers and fills the halls.

    Inputs in
    Chips from Nvidia, AMD and its own designs, Servers from contract makers
    Outputs out
    Compute and storage pools
    Who does it
    Nvidia, AMD, Google TPU, Amazon Trainium, Foxconn, Quanta.
    Value added
    Supplies the raw computing.
  3. Cloud services

    Fat margin

    Software turns hardware into services customers rent by the hour.

    Inputs in
    Software engineers, Global network
    Outputs out
    Computing, storage, databases, AI services
    Who does it
    AWS, Azure, Google Cloud, Oracle, Alibaba Cloud.
    Value added
    Lets customers rent what they need without owning hardware.

Hyperscale public cloud: Business models

Hyperscale public cloud: business models
ModelHow it earnsExamplesTypical margin
Pay as you go and committed useCharges by the hour, gigabyte or request, with discounts for one to three year commitments.AWS, Microsoft Azure, Google Cloud, Oracle, Alibaba Cloudoperating 25 to 40 percent at the leaders

Hyperscale public cloud: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: USD 100 of cloud revenue.

Hyperscale public cloud: one unit, revenue, costs and profit
LineAmountShare of revenue
Cloud services billedUSD 100100%
Minus Depreciation of servers and chipsUSD 2525%
Minus Data centre space, power and coolingUSD 1212%
Minus NetworkUSD 55%
Minus Operations staffUSD 1010%
Minus Research and developmentUSD 1010%
Minus Sales and marketingUSD 88%
ProfitUSD 3030%

Check: USD 100 minus USD 70 of costs leaves USD 30.

So what: Servers and buildings are the biggest costs and are mostly fixed, so keeping them busy is how clouds earn a high margin. Heavy AI spending now raises depreciation, which pressures margins unless AI revenue grows fast.

Hyperscale public cloud: How costs divide

Hyperscale public cloud: costs as a share of revenue
Cost lineShare of revenue
Depreciation of servers and buildingsabout 20 to 30 percent of revenue, rising with AI spending
Power, space and networkabout 15 to 20 percent of revenue
Staff and researchabout 15 to 25 percent of revenue
Sales and marketingabout 5 to 10 percent of revenue
Capital spending (cash)very high; Amazon guided to about USD 200 billion for 2026(source 10)

Hyperscale public cloud: What drives revenue

Workloads moving to the cloud
Businesses still run many systems in their own sites; each move adds cloud revenue.
AI services
Renting GPUs and selling AI models adds fast-growing revenue.
Committed contracts
Large multi-year deals lock in spend from big customers.

Hyperscale public cloud: What drives profit

Server utilization
Sharing servers among many customers keeps them busy.
Custom chips
Own chips cut the cost of AI compute compared with buying GPUs.
Server life
Longer assumed lives lower depreciation each year.

Hyperscale public cloud: Key inputs and outputs

Hyperscale public cloud: key inputs
InputWhat it is forShare of cost
Servers and chipsComputing and storage.the largest capital cost
PowerRunning and cooling servers.about 5 to 10 percent of revenue
Software engineersBuilding and running services.a large part of staff and research cost

Outputs: Virtual servers; Storage and databases; AI services and GPU hours; Analytics and security tools.

Hyperscale public cloud: Selling points

Hundreds of services
Customers can build everything in one place.
Global regions
Data can sit close to users and inside each country.

Hyperscale public cloud: Moats

Switching costs
Moving data and software out is slow and costly, and data leaving the cloud is charged.
Scale
Buying power and chips at huge volume lowers costs for each unit.

Hyperscale public cloud: SWOT

Hyperscale public cloud: Strengths

  • Huge scale
  • Strong margins
  • Broad customer base

Hyperscale public cloud: Weaknesses

  • Record capital needs
  • Dependence on Nvidia for AI chips
  • Outages affect many customers at once

Hyperscale public cloud: Opportunities

  • AI services
  • Sovereign cloud regions
  • Moving more enterprise systems

Hyperscale public cloud: Threats

  • Regulation of cloud switching and data
  • AI spending slowdown
  • Customers moving some work back to own sites

Hyperscale public cloud: Key measures

Market share
Share of cloud infrastructure spending.Typical: Amazon about 28 percent, Microsoft about 20 percent, Google about 15 percent in Q2 2026(source 9)
Revenue growth
Growth in cloud revenue.Typical: market up about 43 percent a year in Q2 2026(source 9)
Capital spending
Cash spent on buildings and servers.Typical: about USD 195 to 205 billion guided at Alphabet for 2026(source 10)

Hyperscale public cloud: Margin and capital

Typical margin
Operating 25 to 40 percent at the leaders
Capital intensity
Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.

Hyperscale public cloud: Players

Amazon Web Services (US), Microsoft Azure (US), Google Cloud (US), Oracle (US), Alibaba Cloud, Tencent Cloud and Huawei Cloud (China), OVHcloud (France), Jio and Yotta clouds (India).

Hyperscale public cloud: How it comes up in a case

  • Should a hyperscaler build its own sites or lease from developers?
  • Should a cloud open a new region in Saudi Arabia or India?
  • Our cloud margins fell as AI spending rose. What should we do?
Retail colocation and interconnectionCompanies that rent space and power for a customer's own servers and connect them to many networks.

Retail colocation and interconnection: How it differs

Customers bring their own servers and rent racks or cages, usually a few kW to a few MW. The most valuable sites are city hubs where hundreds of networks and clouds meet, so interconnection fees grow faster than space. It earns a steady, property-like return.

Retail colocation and interconnection: Customers

Banks, telecom firms, content firms, cloud providers and enterprises.

Retail colocation and interconnection: Supply chain

  1. Site and build

    Medium margin

    The operator builds or buys sites in big cities near fibre routes.

    Inputs in
    Land and power, Construction
    Outputs out
    Data halls
    Who does it
    Equinix, Digital Realty, NTT Data.
    Value added
    Creates secure, connected space.
  2. Leasing

    Medium margin

    Customers rent racks and cages per kW per month.

    Inputs in
    Sales teams, Power capacity
    Outputs out
    Rent contracts
    Who does it
    Colocation operators.
    Value added
    Gives customers space without building their own.
  3. Interconnection

    Fat margin

    Customers link to each other, to networks and to clouds with cables inside the building.

    Inputs in
    Fibre cross-connects, Network exchanges
    Outputs out
    Cross-connects and exchange ports
    Who does it
    Equinix, DE-CIX, LINX.
    Value added
    Lets customers reach partners directly, faster and cheaper than over the internet.

Retail colocation and interconnection: Business models

Retail colocation and interconnection: business models
ModelHow it earnsExamplesTypical margin
Rent plus interconnectionCharges per kW per month for space and power, plus a monthly fee for each cross-connect.Equinix, Digital Realty, NTT Data, STT GDC, SifyEBITDA about 50 percent; operating about 20 percent

Retail colocation and interconnection: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one 10 kW rack in a city colocation site for one year.

Retail colocation and interconnection: one unit, revenue, costs and profit
LineAmountShare of revenue
Rent and cross-connect feesUSD 33,000100%
Minus Power and cooling not passed throughUSD 3,0009.1%
Minus Staff and maintenanceUSD 5,50017%
Minus Property tax, ground rent and insuranceUSD 2,5007.6%
Minus Sales and administrationUSD 4,00012%
Minus Depreciation of building and equipmentUSD 10,00030%
ProfitUSD 8,00024%

Check: USD 33,000 minus USD 25,000 of costs leaves USD 8,000.

So what: Customers usually pay for their own electricity, so power is not the operator's biggest cost. Depreciation is. Filling empty space and adding cross-connects lifts profit fastest.

Retail colocation and interconnection: How costs divide

Retail colocation and interconnection: costs as a share of revenue
Cost lineShare of revenue
Operating costs before depreciationabout 50 percent of revenue(source 12)
Depreciationabout 25 to 30 percent of revenue
Operating profitabout 20 percent of revenue(source 12)
Capital spending (cash)nearly half of revenue in 2025(source 12)

Retail colocation and interconnection: What drives revenue

Rent per kW
Tight markets let operators raise rents on renewal.
Cross-connects
Each new link between customers adds a monthly fee.
Occupancy
Filling empty space adds revenue at little extra cost.

Retail colocation and interconnection: What drives profit

Occupancy
Fixed costs spread over more tenants.
Power efficiency
Lower PUE cuts the power the operator pays for.
Pricing on renewal
Contracts reprice every few years, lifting margins in tight markets.

Retail colocation and interconnection: Key inputs and outputs

Retail colocation and interconnection: key inputs
InputWhat it is forShare of cost
City sitesBeing close to networks and users.land about 7 percent of build cost(source 5)
Power capacityServing tenants' servers.usually passed through to tenants
Operations staffRunning sites all day and night.about 5 to 10 percent of revenue

Outputs: Rented racks and cages; Cross-connects; Internet exchange ports.

Retail colocation and interconnection: Selling points

Network density
Hundreds of networks in one building save customers money and time.
Global footprint
Customers can use the same provider in many cities.

Retail colocation and interconnection: Moats

Network effects
Each new network makes the site more valuable to everyone else.
Scarce city sites
Power and permits in big cities are hard to get.

Retail colocation and interconnection: SWOT

Retail colocation and interconnection: Strengths

  • Steady recurring rent
  • Network effects
  • Diverse customers

Retail colocation and interconnection: Weaknesses

  • High capital needs
  • Limited power in city centres
  • Slower growth than AI builds

Retail colocation and interconnection: Opportunities

  • AI inference close to users
  • Private links to clouds
  • New hubs in India, the Gulf and Africa

Retail colocation and interconnection: Threats

  • Customers moving fully to cloud
  • Power limits in cities
  • Rising build costs

Retail colocation and interconnection: Key measures

Adjusted EBITDA margin
Cash profit over revenue.Typical: about 49 percent at Equinix in 2025(source 12)
Rent per kW per month
Typical price for space and power.Typical: about USD 180 to 275 in Silicon Valley in late 2025(source 4)
PUE
Total site power over IT power.Typical: industry average about 1.54 in 2025(source 2)

Retail colocation and interconnection: Margin and capital

Typical margin
Operating about 20 percent; EBITDA about 50 percent
Capital intensity
Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.

Retail colocation and interconnection: Players

Equinix (US), Digital Realty (US), NTT Data (Japan), STT GDC (Singapore), Sify and CtrlS (India), Khazna (UAE), Teraco (South Africa), Data4 (France).

Retail colocation and interconnection: How it comes up in a case

  • Should a telecom operator in Southeast Asia enter colocation?
  • Should we buy a colocation firm in India?
Hyperscale and build-to-suit developersCompanies that build huge data centre campuses and rent whole buildings to big cloud firms on long leases.

Hyperscale and build-to-suit developers: How it differs

They sell to a handful of giant tenants on leases of 10 to 15 years or more, at a lower price per kW than retail colocation. The business is closest to property development: find power, sign an anchor tenant, build, then refinance. Much of the money comes from infrastructure and private equity funds.

Hyperscale and build-to-suit developers: Customers

Hyperscalers such as Microsoft, Amazon, Google, Meta and Oracle, and AI labs and GPU clouds.

Hyperscale and build-to-suit developers: Supply chain

  1. Power and land

    Margin varies

    The developer secures land and a large grid connection.

    Inputs in
    Land, Grid and power contracts
    Outputs out
    Powered land
    Who does it
    Developers such as Vantage, QTS, AirTrunk and AdaniConneX.
    Value added
    Creates the scarcest input, power at scale.
  2. Build

    Thin margin

    Contractors build halls to the tenant's design.

    Inputs in
    Equipment, Construction labour
    Outputs out
    Finished halls
    Who does it
    Contractors with equipment from Schneider, Vertiv and Eaton.
    Value added
    Delivers capacity on time.
  3. Lease and operate

    Medium margin

    The tenant moves in and pays rent for 10 to 15 years or more.

    Inputs in
    Operations staff, Maintenance
    Outputs out
    Rental income
    Who does it
    The developer.
    Value added
    Gives the tenant capacity without tying up its own capital.

Hyperscale and build-to-suit developers: Business models

Hyperscale and build-to-suit developers: business models
ModelHow it earnsExamplesTypical margin
Develop and leaseBuilds campuses for anchor tenants and earns long-term rent, often selling stakes to funds after leasing.Vantage, QTS (Blackstone), AirTrunk (Blackstone), Khazna, Yotta, AdaniConneXEBITDA 50 to 70 percent once leased

Hyperscale and build-to-suit developers: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one MW leased to a hyperscaler for one year.

Hyperscale and build-to-suit developers: one unit, revenue, costs and profit
LineAmountShare of revenue
Rent at USD 130 per kW per monthUSD 1,560,000100%
Minus Depreciation of a USD 12 million buildUSD 600,00038%
Minus Operations staff and maintenanceUSD 150,0009.6%
Minus Property tax and insuranceUSD 60,0003.8%
Minus Interest on borrowingUSD 450,00029%
Minus OverheadsUSD 50,0003.2%
ProfitUSD 250,00016%

Check: USD 1,560,000 minus USD 1,310,000 of costs leaves USD 250,000.

So what: Profit is steady once leased, but depends on build cost and interest rates. An empty MW still carries the depreciation and interest, so signing tenants before building is key.

Hyperscale and build-to-suit developers: How costs divide

Hyperscale and build-to-suit developers: costs as a share of revenue
Cost lineShare of revenue
Depreciationabout 35 to 45 percent of revenue
Interestabout 20 to 30 percent of revenue
Operations and maintenanceabout 8 to 12 percent of revenue
Property tax, insurance and overheadsabout 5 to 8 percent of revenue

Hyperscale and build-to-suit developers: What drives revenue

MW leased
Each MW signed adds years of rent.
Rent per kW
Shortages let developers raise rents on new deals.
Power pipeline
More secured power means more capacity to sell.

Hyperscale and build-to-suit developers: What drives profit

Build cost per MW
Lower cost raises yield on each project.
Pre-leasing
Signing an anchor before building removes empty-hall risk.
Cheap financing
Long leases with strong tenants attract low cost debt.

Hyperscale and build-to-suit developers: Key inputs and outputs

Hyperscale and build-to-suit developers: key inputs
InputWhat it is forShare of cost
PowerRunning the campus.power infrastructure about 21 percent of build cost(source 5)
ConstructionBuilding halls.about USD 8.9 million to 23.3 million per MW all in(source 5)
CapitalFunding builds years before rent.interest about 20 to 30 percent of revenue

Outputs: Leased data halls; Powered land banks; Stakes sold to infrastructure funds.

Hyperscale and build-to-suit developers: Selling points

Speed to power
Hyperscalers sign with whoever can deliver powered capacity first.
Scale of campus
AI training needs hundreds of MW in one place.

Hyperscale and build-to-suit developers: Moats

Power and land banks
Secured grid connections take years to replicate.
Long leases
Tenants rarely move once installed.

Hyperscale and build-to-suit developers: SWOT

Hyperscale and build-to-suit developers: Strengths

  • Long contracts
  • Strong tenants
  • Record low vacancy

Hyperscale and build-to-suit developers: Weaknesses

  • Few tenants
  • Heavy debt
  • Long build times

Hyperscale and build-to-suit developers: Opportunities

  • AI training campuses
  • New markets in the Gulf, India and Southeast Asia
  • Selling stakes to funds

Hyperscale and build-to-suit developers: Threats

  • Hyperscalers cutting spending
  • Grid delays
  • Rising build costs

Hyperscale and build-to-suit developers: Key measures

MW leased and under construction
Capacity signed and being built.Typical: a record 7,481 MW under construction in primary North American markets in H1 2026(source 3)
Vacancy
Share of built capacity not leased.Typical: about 1.4 percent in primary North American markets(source 3)
Yield on cost
Yearly operating profit over build cost.Typical: often 10 to 12 percent targeted

Hyperscale and build-to-suit developers: Margin and capital

Typical margin
EBITDA 50 to 70 percent once leased
Capital intensity
Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.

Hyperscale and build-to-suit developers: Players

Vantage and QTS (US), AirTrunk (Australia and Asia), Khazna (UAE), Humain (Saudi Arabia), AdaniConneX and Yotta (India), Princeton Digital Group (Singapore), atNorth (Nordics).

Hyperscale and build-to-suit developers: How it comes up in a case

  • Where should we build a 300 MW AI campus?
  • A private equity fund wants to buy a data centre developer. Is it a good investment?
GPU clouds (neoclouds)Newer companies that rent out AI chips by the hour to AI labs and businesses.

GPU clouds (neoclouds): How it differs

They focus only on AI computing, often renting space from developers and buying chips with debt. Revenue can grow very fast with large contracts from AI labs, but chips lose value in a few years and prices fall as new chips arrive, so profit is fragile.

GPU clouds (neoclouds): Customers

AI labs, startups, enterprises training models, and hyperscalers needing extra capacity.

GPU clouds (neoclouds): Supply chain

  1. Chips and servers

    Fat margin

    The GPU cloud buys GPUs and servers, usually from Nvidia and its partners.

    Inputs in
    GPUs, Debt funding
    Outputs out
    GPU clusters
    Who does it
    Nvidia, Supermicro, Dell.
    Value added
    Supplies scarce AI chips.
  2. Space and power

    Medium margin

    Clusters go into leased halls with liquid cooling.

    Inputs in
    Colocation leases, Power
    Outputs out
    Running clusters
    Who does it
    Developers such as Core Scientific and Applied Digital.
    Value added
    Hosts dense AI racks of about 120 kW.
  3. Compute sales

    Margin varies

    GPU hours are sold on demand or on contracts with software to manage them.

    Inputs in
    Sales teams, Orchestration software
    Outputs out
    GPU hours
    Who does it
    CoreWeave, Nebius, Lambda, Crusoe.
    Value added
    Gives customers ready AI clusters fast.

GPU clouds (neoclouds): Business models

GPU clouds (neoclouds): business models
ModelHow it earnsExamplesTypical margin
Contracted capacitySigns one to five year take-or-pay contracts with AI labs and hyperscalers.CoreWeave, Nebius, CrusoeEBITDA can be high (about 59 percent at CoreWeave), yet net losses after interest
On-demand GPU hoursRents GPUs by the hour at list prices.Lambda, RunPod, Yotta Shakti Cloudthin and volatile

GPU clouds (neoclouds): One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one AI GPU rented for a year, busy 70 percent of the time at USD 2.50 an hour.

GPU clouds (neoclouds): one unit, revenue, costs and profit
LineAmountShare of revenue
GPU hours sold: 8,760 hours x 70 percent x USD 2.50USD 15,330100%
Minus Depreciation of a USD 35,000 GPU and server share over five yearsUSD 7,00046%
Minus Electricity including coolingUSD 1,0957.1%
Minus Colocation rent, network and supportUSD 2,00013%
Minus Interest on money borrowed to buy the chipUSD 2,50016%
ProfitUSD 2,73518%

Check: USD 15,330 minus USD 12,595 of costs leaves USD 2,735.

So what: Profit is thin after interest. At USD 1.80 an hour, or with a three-year chip life, the GPU loses money, which is why contract length and utilization matter more than growth.

GPU clouds (neoclouds): How costs divide

GPU clouds (neoclouds): costs as a share of revenue
Cost lineShare of revenue
Depreciation of chipsabout 40 to 50 percent of revenue
Interestabout 25 percent of revenue at CoreWeave in Q2 2026(source 11)
Colocation and networkabout 10 to 15 percent of revenue
Electricityabout 5 to 10 percent of revenue

GPU clouds (neoclouds): What drives revenue

Contract backlog
Large signed contracts turn into revenue as capacity goes live.
Price per GPU hour
Newer chips earn more; older chips' prices fall.
Utilization
More hours rented means more revenue from the same chips.

GPU clouds (neoclouds): What drives profit

Chip life
A longer useful life lowers yearly depreciation.
Funding cost
Cheaper debt raises profit after interest.
Customer quality
Contracts with strong customers lower the risk of unpaid bills and empty chips.

GPU clouds (neoclouds): Key inputs and outputs

GPU clouds (neoclouds): key inputs
InputWhat it is forShare of cost
GPUsThe product being rented.about 40 to 50 percent of revenue as depreciation
DebtBuying chips before revenue arrives.interest about 25 percent of revenue at one leader(source 11)
Power and spaceRunning dense AI racks.about 15 to 25 percent of revenue

Outputs: GPU hours; Dedicated AI clusters; Managed training and inference.

GPU clouds (neoclouds): Selling points

Speed to capacity
Can stand up large clusters faster than many hyperscalers.
AI focus
Software and support built only for AI work.

GPU clouds (neoclouds): Moats

Early access to chips
Close ties with Nvidia secure supply in shortages.
Signed backlog
Long contracts lock in customers for years.

GPU clouds (neoclouds): SWOT

GPU clouds (neoclouds): Strengths

  • Fast growth
  • AI specialist
  • Large backlogs

GPU clouds (neoclouds): Weaknesses

  • Heavy debt
  • Few customers
  • Chips lose value fast

GPU clouds (neoclouds): Opportunities

  • Inference demand
  • Sovereign AI clouds
  • Hyperscalers buying overflow capacity

GPU clouds (neoclouds): Threats

  • GPU price falls
  • Hyperscalers cutting prices
  • AI spending slowdown

GPU clouds (neoclouds): Key measures

Contracted backlog
Future revenue customers have committed to.Typical: about USD 104 billion at CoreWeave in mid-2026(source 11)
Price per GPU hour
What customers pay for one GPU for one hour.Typical: about USD 4 on-demand list price for an H100 in September 2026(source 7)
Utilization
Share of GPU hours rented.Typical: break-even near half in the illustrative example

GPU clouds (neoclouds): Margin and capital

Typical margin
High EBITDA but often a net loss after depreciation and interest
Capital intensity
Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.

GPU clouds (neoclouds): Players

CoreWeave, Lambda and Crusoe (US), Nebius (Netherlands), Yotta Shakti Cloud (India), Core42 (UAE), Fluidstack (UK), GMI Cloud (US and Taiwan).

GPU clouds (neoclouds): How it comes up in a case

  • Our GPU cloud is growing fast but losing money. What should we do?
  • How should we price GPU capacity: on demand or on multi-year contracts?
Power and cooling equipment for data centresCompanies that make the transformers, backup power and cooling systems that keep data centres running.

Power and cooling equipment for data centres: How it differs

They sell equipment, not computing, and benefit from every new build whoever the tenant is. Order books grow when everyone builds at once, and delivery slots become a source of pricing power. AI racks need liquid cooling, a fast-growing niche.

Power and cooling equipment for data centres: Customers

Developers, hyperscalers, colocation operators and contractors.

Power and cooling equipment for data centres: Supply chain

  1. Materials and components

    Thin margin

    Suppliers provide copper, steel, electrical steel, electronics and pumps.

    Inputs in
    Copper and steel, Electronics
    Outputs out
    Components
    Who does it
    Metal and component makers worldwide.
    Value added
    Supplies the raw parts.
  2. Manufacturing

    Medium margin

    Makers build switchgear, UPS systems, generators, chillers and liquid cooling units.

    Inputs in
    Components, Factory labour
    Outputs out
    Power and cooling systems
    Who does it
    Schneider Electric, Vertiv, Eaton, ABB, Cummins.
    Value added
    Turns parts into reliable systems.
  3. Install and service

    Fat margin

    Systems are installed, tested and maintained for years.

    Inputs in
    Field engineers, Spare parts
    Outputs out
    Running systems, Service contracts
    Who does it
    The makers and their partners.
    Value added
    Keeps sites running without power loss.

Power and cooling equipment for data centres: Business models

Power and cooling equipment for data centres: business models
ModelHow it earnsExamplesTypical margin
Equipment plus serviceSells systems for new builds and earns service fees on the installed base.Schneider Electric, Vertiv, Eaton, ABB, Legrandoperating 15 to 25 percent

Power and cooling equipment for data centres: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one power and cooling package for a 2 MW data hall.

Power and cooling equipment for data centres: one unit, revenue, costs and profit
LineAmountShare of revenue
Package priceUSD 3,000,000100%
Minus Materials and componentsUSD 1,500,00050%
Minus Factory labourUSD 300,00010%
Minus Engineering and researchUSD 150,0005%
Minus Installation and commissioningUSD 200,0006.7%
Minus Sales and administrationUSD 330,00011%
ProfitUSD 520,00017%

Check: USD 3,000,000 minus USD 2,480,000 of costs leaves USD 520,000.

So what: Margins rise when demand outruns factory capacity. Service on installed systems keeps earning after the building boom slows.

Power and cooling equipment for data centres: How costs divide

Power and cooling equipment for data centres: costs as a share of revenue
Cost lineShare of revenue
Materials and componentsabout 45 to 55 percent of revenue
Factory labourabout 8 to 12 percent of revenue
Research and engineeringabout 4 to 6 percent of revenue
Sales and administrationabout 10 to 15 percent of revenue

Power and cooling equipment for data centres: What drives revenue

Data centre construction
Every new MW needs power and cooling kit.
Liquid cooling
AI racks need new, higher value cooling systems.
Service base
More installed systems means more service income.

Power and cooling equipment for data centres: What drives profit

Factory capacity
Full factories spread fixed cost and allow higher prices.
Copper and steel prices
Metal costs swing margins unless passed through.
Service mix
Service earns higher margins than new equipment.

Power and cooling equipment for data centres: Key inputs and outputs

Power and cooling equipment for data centres: key inputs
InputWhat it is forShare of cost
Copper and electrical steelTransformers, cables and switchgear.a large part of materials cost
ElectronicsControls and UPS systems.a significant share of materials
Skilled field engineersInstalling and servicing systems.most of service cost

Outputs: Switchgear and transformers; UPS and backup generators; Chillers and liquid cooling; Service contracts.

Power and cooling equipment for data centres: Selling points

Delivery slots
In a shortage, the maker that can ship on time wins the order.
Liquid cooling know-how
Few firms have proven systems for 120 kW AI racks.

Power and cooling equipment for data centres: Moats

Installed base
Operators stick with brands their staff know and have spares for.
Certification and track record
Uptime matters so much that customers avoid untested suppliers.

Power and cooling equipment for data centres: SWOT

Power and cooling equipment for data centres: Strengths

  • Benefit from every build
  • Service income
  • Long order books

Power and cooling equipment for data centres: Weaknesses

  • Factory limits
  • Metal price exposure
  • Cyclical new orders

Power and cooling equipment for data centres: Opportunities

  • Liquid cooling
  • Grid and on-site power
  • Heat reuse

Power and cooling equipment for data centres: Threats

  • Build slowdown
  • New low cost rivals
  • Supply shortages of transformers

Power and cooling equipment for data centres: Key measures

Order backlog
Orders not yet delivered.
Book-to-bill
New orders over sales; above 1 means growth.
Lead time
Time from order to delivery.Typical: about a year for large transformers

Power and cooling equipment for data centres: Margin and capital

Typical margin
Operating 15 to 25 percent
Capital intensity
MediumA fair amount of money is tied up, in things like stores, stock or equipment.

Power and cooling equipment for data centres: Players

Schneider Electric (France), Vertiv and Eaton (US), ABB (Switzerland), Legrand (France), Cummins (US, generators), Delta Electronics (Taiwan), Hitachi Energy (Japan and Switzerland).

Power and cooling equipment for data centres: How it comes up in a case

  • Should a cooling maker build a new factory for liquid cooling?
  • How big is the market for data centre power equipment in India?
AI model and inference platformsCompanies that build AI models and sell their answers to apps, businesses and people.

AI model and inference platforms: How it differs

They are the largest buyers of AI computing. Training a frontier model costs huge sums up front, then each answer (inference) costs a little computing, priced per token. Prices per token fall quickly as models get more efficient, so volume must grow faster.

AI model and inference platforms: Customers

Consumers paying for chat apps, software firms building on models, and large businesses and governments.

AI model and inference platforms: Supply chain

  1. Compute

    Margin varies

    Labs rent or build GPU clusters for training and inference.

    Inputs in
    GPU hours, Data centre capacity
    Outputs out
    Training and inference capacity
    Who does it
    Hyperscalers, GPU clouds and labs' own sites.
    Value added
    Supplies the computing to build and run models.
  2. Model training

    Margin varies

    Researchers train models on large data sets over weeks or months.

    Inputs in
    Researchers, Training data
    Outputs out
    Trained models
    Who does it
    OpenAI, Anthropic, Google, Mistral AI, DeepSeek.
    Value added
    Creates the model's abilities.
  3. Products and access

    Fat margin

    Models are sold through apps and programming interfaces.

    Inputs in
    Product teams, Sales and support
    Outputs out
    Chat apps, Model access priced per token
    Who does it
    The labs and cloud marketplaces.
    Value added
    Puts the model in customers' hands.

AI model and inference platforms: Business models

AI model and inference platforms: business models
ModelHow it earnsExamplesTypical margin
Usage priced model accessCharges per million tokens of input and output.OpenAI, Anthropic, Google, Mistral AIpositive gross margin on inference; heavy training costs often mean overall losses
SubscriptionsCharges a monthly fee for chat apps and business plans.ChatGPT, Claude, Gemini, Le Chatvaries
Open models with servicesReleases models freely and earns from hosting, support or custom work.Mistral AI, Alibaba Qwen, Sarvam AIvaries

AI model and inference platforms: One unit: revenue, costs and profit

Illustrative, rounded figures. One unit: one million tokens of model output sold for USD 10.

AI model and inference platforms: one unit, revenue, costs and profit
LineAmountShare of revenue
Price per million tokensUSD 10100%
Minus Inference compute (GPU hours)USD 440%
Minus Share of model training costUSD 2.5025%
Minus Research and staffUSD 1.5015%
Minus Sales, support and hosting overheadsUSD 110%
ProfitUSD 110%

Check: USD 10 minus USD 9 of costs leaves USD 1.

So what: Inference alone earns a healthy margin, but training the next model takes much of it. Cheaper compute per token and more users are what make the economics work.

AI model and inference platforms: How costs divide

AI model and inference platforms: costs as a share of revenue
Cost lineShare of revenue
Inference computeabout 30 to 50 percent of revenue
Training computecan exceed revenue at fast-growing labs
Research staffabout 10 to 25 percent of revenue
Sales and administrationabout 10 to 20 percent of revenue

AI model and inference platforms: What drives revenue

Users and usage
More users and more tokens per user lift revenue.
Model quality
Better models win business customers who pay more.
Enterprise contracts
Large companies sign yearly commitments.

AI model and inference platforms: What drives profit

Cost per token
Better chips and software cut inference cost.
Training budget
The size of each new training run sets fixed cost.
Price competition
Rival models, including free open models, push prices down.

AI model and inference platforms: Key inputs and outputs

AI model and inference platforms: key inputs
InputWhat it is forShare of cost
GPU computingTraining and running models.the largest cost
Researchers and engineersBuilding and improving models.about 10 to 25 percent of revenue
DataTraining material, some licensed.a growing cost through licensing deals

Outputs: AI models; Chat apps; Programming interfaces priced per token; AI agents for businesses.

AI model and inference platforms: Selling points

Model quality
Better reasoning and coding win business customers.
Trust and safety
Businesses and governments choose providers they trust with their data.

AI model and inference platforms: Moats

Compute and talent
Frontier training needs billions of dollars and scarce researchers.
Enterprise integration
Once built into workflows, models are slow to replace.

AI model and inference platforms: SWOT

AI model and inference platforms: Strengths

  • Fast revenue growth
  • High demand
  • Strong talent

AI model and inference platforms: Weaknesses

  • Huge training costs
  • Many labs lose money
  • Dependence on chip and cloud partners

AI model and inference platforms: Opportunities

  • AI agents doing whole tasks
  • Local language models for India and the Gulf
  • Government and enterprise deals

AI model and inference platforms: Threats

  • Falling prices per token
  • Free open models
  • Regulation such as the EU AI Act

AI model and inference platforms: Key measures

Tokens served
Volume of model output delivered.
Price per million tokens
What customers pay for model use.
Inference gross margin
Revenue minus inference compute, over revenue.

AI model and inference platforms: Margin and capital

Typical margin
Varies; inference can be profitable, but training costs often mean overall losses
Capital intensity
Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.

AI model and inference platforms: Players

OpenAI, Anthropic and Google (US), Mistral AI (France), G42 and Core42 (UAE), Sarvam AI (India), DeepSeek, Alibaba Qwen and Moonshot (China), Cohere (Canada).

AI model and inference platforms: How it comes up in a case

  • Should a Gulf government fund a national AI model and compute cluster?
  • How should an AI lab price its models as costs per token fall?

Key measures

The numbers people in this industry track (also called KPIs, key performance indicators). Ask for the first one or two early in a case.

IT capacity (MW)
The power the servers can draw; the main measure of size, capacity sold and capacity under construction.
Leased share or utilisation
Share of built capacity that is rented (colocation) or busy (cloud and GPUs).Typical: primary North American markets had record-low vacancy of about 1.4 percent in the first half of 2026(source 3)
PUE (power usage effectiveness)
Total site power divided by the power used by the servers; lower is better, 1.0 is the floor.Typical: industry average about 1.54 in 2025; new AI sites aim for about 1.1 to 1.3(source 2)
Rack density (kW per rack)
Power drawn by one cabinet of servers; it decides whether a building can host AI and whether liquid cooling is needed.Typical: most racks 10 to 30 kW; the newest AI racks about 120 kW, with power supplies rated for about 132 kW(source 6)
Rent per kW per month
The usual colocation price for space, power delivery and cooling.Typical: about USD 180 to 275 in Silicon Valley in late 2025; far lower per kW for large hyperscale leases(source 4)
Price per GPU hour
What customers pay to rent one AI chip for one hour; falls as newer chips arrive.Typical: about USD 4 on-demand for an H100 on a specialist GPU cloud list price in September 2026; long contracts cost less(source 7)
Contracted backlog
Revenue customers have committed to pay in future; shows how much new capacity is already sold.Typical: CoreWeave reported about USD 104 billion in mid 2026(source 11)
Capex as a share of revenue
How much of each year's revenue is spent on new buildings and equipment.Typical: nearly half (about 47 percent) for Equinix in 2025(source 12)
Time to power
How long until the grid can deliver the power a new site needs; often the deciding factor.
Benchmarks: typical figures to check a client's numbers against
Adjusted EBITDA margin, colocation leader
about 49 percent (Equinix 2025), guided to about 51 percent for 2026(source 12)
Operating margin, colocation leader
about 20 percent (Equinix 2025)(source 12)Worked out from operating income of about USD 1.8 billion on about USD 9.2 billion of revenue.
Adjusted EBITDA margin, GPU cloud
about 59 percent (CoreWeave, second quarter 2026), yet a net loss after interest(source 11)
All-in build cost of a new site, US and Canada, excluding chips
about USD 8.9 million to 23.3 million per MW(source 5)
Data centres' share of world electricity use
about 1.5 percent in 2024 (about 415 TWh), heading for about 945 TWh by 2030(source 1)
Data centres' share of Ireland's metered electricity
23 percent in 2025, up from 5 percent in 2015(source 15)

In a case

First questions to ask

When a case lands in this industry, these get you to the numbers that matter.

  1. How much power is available, when can the grid deliver it, at what price, and how clean is it?
  2. How much capacity is already signed with customers, for how long, and with whom?
  3. Is this colocation (rent for space and power) or compute (renting chips by the hour)?
  4. What is the utilisation or leased share today, and what happens if prices fall by a third?
  5. Over how many years are the chips written off, and how is the investment funded?

Common traps

Mistakes candidates make in this industry, and what to do instead.

  • Starting a site case with land price or tax. Start with power: amount, date, price and source.
  • Treating the building and the chips as one asset. The building lasts decades; the chips a few years.
  • Assuming electricity is the colocation operator's main cost. Customers usually pay for their own power on top of rent.
  • Assuming today's GPU prices last. Prices fell sharply after 2024 on many platforms, and newer chips keep arriving.
  • Counting announced capacity as if it were built, powered and leased.
  • Reaching for a generic framework instead of the real driver of this industry. Instead, start from power: megawatts secured, the date and the price. Then look at rent per kW and utilization.
Typical case prompts in this industry
  • Where should we build a 300 MW AI data centre campus?
  • Should a telecom operator in Southeast Asia enter the colocation business?
  • Our GPU cloud is growing fast but losing money. What should we do?
  • Should a Gulf government fund a national AI compute cluster, and how?
  • A private equity fund wants to buy a data centre developer. Is it a good investment?
  • How should we price GPU capacity: on demand, or on multi-year contracts?
  • Should a hyperscaler build its own sites or lease from colocation developers?

Go further

Optional. Open what you need.

Players by region

Well-known companies in each region. You do not need to learn them by heart; they help you picture the market.

Global
Amazon Web Services, Microsoft Azure, Google Cloud, Oracle, Equinix and Digital Realty (colocation), Nvidia (AI chips)
United States
CoreWeave, Lambda and Crusoe (GPU clouds), Meta (builds for its own use), Vantage and QTS (hyperscale developers)
Europe
Nebius (Netherlands, GPU cloud), Data4 (France), atNorth (Nordics), Mistral AI compute (France)
Middle East
G42 and Khazna (UAE), Humain (Saudi Arabia, owned by the Public Investment Fund), center3 (stc, Saudi Arabia)
India
Yotta, CtrlS, Sify, AdaniConneX, Reliance Jio
Southeast Asia
STT GDC and Keppel (Singapore), Princeton Digital Group, AirTrunk, large campuses in Johor (Malaysia) and Batam (Indonesia)
China
Alibaba Cloud, Tencent Cloud, Huawei Cloud, GDS
What changed, 2024 to 2026
  • Cloud demand accelerated: cloud infrastructure spending reached about USD 143 billion in the second quarter of 2026, up about 43 percent on a year earlier, with Amazon at about 28 percent share, Microsoft about 20 percent and Google about 15 percent.(source 9)
  • Record capital spending: for 2026 Amazon guided to about USD 200 billion, Alphabet to about USD 195 to 205 billion and Microsoft to about USD 175 billion (after a lease accounting change; about USD 190 billion on the old basis), much of it for AI data centres, and investors are asking when it will pay back.(source 10)
  • Capacity ran short: primary North American vacancy fell to a record low of about 1.4 percent in the first half of 2026, with a record 7,481 MW under construction, and rents kept rising.(source 3)
  • GPU prices fell from their 2024 peak on many platforms; AWS cut on-demand H100 instance prices by up to about 45 percent in June 2025, which squeezed smaller GPU clouds.(source 8)
  • Sovereign AI: India's IndiaAI Mission offers more than 38,000 GPUs at about INR 65 per GPU hour to startups and researchers; the EU plans EUR 20 billion for AI gigafactories; the UAE's Stargate UAE targets a first 200 MW phase in 2026.(source 16)
  • Power became the limit: the IEA expects data centre electricity use to roughly double from 2024 to 2030, so sites now follow available power, not just customers.(source 1)
Words to know

Linked words have a fuller entry in the glossary.

Data centre
A secure building full of servers, with power supply, cooling and network connections.
MW of IT load
Megawatts of power the servers can draw; how data centres are sized and sold.
Colocation
Renting space, power and cooling in a shared data centre for your own servers.
Hyperscaler
A very large cloud company, such as Amazon, Microsoft or Google, that builds huge data centres.
Neocloud (GPU cloud)
A newer company that rents out AI chips by the hour, such as CoreWeave or Lambda.
GPU
Graphics processing unit: a chip that does many small calculations at once, used for AI.
Training and inference
Training builds an AI model on huge data; inference uses the model to answer each question.
PUE (glossary entry)
Power usage effectiveness: total site power divided by server power; lower is better.
Rack density
Power drawn by one cabinet of servers, in kW.
Sovereign AI
AI computing built and controlled inside a country for security and independence.
Power purchase agreement (PPA) (glossary entry)
A long contract to buy electricity from a producer at an agreed price.
EBITDA (glossary entry)
Profit before interest, tax, depreciation and amortisation: a rough measure of cash profit from operations.
Sources

Facts checked on . Worked numbers are illustrative, shaped by these sources rather than one company's figures.

  1. International Energy Agency: Energy and AI, executive summary (official, April 2025) (opens in a new tab)
  2. Business Wire: Uptime Institute 15th annual Global Data Center Survey, average PUE 1.54 (July 2025) (opens in a new tab)
  3. CBRE: North America Data Center Trends H1 2026 (September 2026) (opens in a new tab)
  4. CBRE press release: Silicon Valley data center market in the second half of 2025, asking rents USD 180 to 275 per kW per month (26 February 2026) (opens in a new tab)
  5. CRE Daily: data center construction costs jump 21 percent since 2024, USD 8.9 million to 23.3 million per MW, with the cost split (citing Cushman & Wakefield) (opens in a new tab)
  6. Supermicro: SuperServer SRS-GB200-NVL72 rack specification, power supplies rated at a total of 132 kW (official product page) (opens in a new tab)
  7. Lambda: GPU cloud on-demand pricing page (official price list, checked September 2026) (opens in a new tab)
  8. AWS News Blog: up to 45 percent price reduction for Amazon EC2 NVIDIA GPU-accelerated instances (June 2025, official) (opens in a new tab)
  9. Synergy Research Group: Q2 cloud market passes USD 143 billion, highest growth rate in eight years (2026) (opens in a new tab)
  10. CNBC: hyperscalers face capex scrutiny after the Alphabet report (July 2026) (opens in a new tab)
  11. CoreWeave: second quarter 2026 results, revenue, margins and backlog (official) (opens in a new tab)
  12. Equinix: fourth quarter and full year 2025 results and 2026 guidance (February 2026, official press release filed with the SEC) (opens in a new tab)
  13. NVIDIA: financial results for the fourth quarter and fiscal 2026 (official) (opens in a new tab)
  14. Let's Data Science: Microsoft keeps its AI infrastructure plan as reported 2026 capex falls to about USD 175 billion after a lease accounting change (29 July 2026) (opens in a new tab)
  15. Central Statistics Office Ireland: Data Centres Metered Electricity Consumption 2025 (official, July 2026) (opens in a new tab)
  16. Press Information Bureau, Government of India: IndiaAI Mission expands AI ecosystem with affordable compute (official) (opens in a new tab)
  17. European Commission: EU launches InvestAI to mobilise EUR 200 billion of investment in AI, with EUR 20 billion for AI gigafactories (February 2025, official) (opens in a new tab)
  18. The National: Stargate UAE first phase to be completed in the third quarter of 2026 (December 2025) (opens in a new tab)
  19. Semiconductor Industry Association: 2026 State of the Industry Report, chips are more than half of AI data centre capital spending (July 2026, official) (opens in a new tab)
  20. US Bureau of Industry and Security: Commerce revises license review policy for semiconductors exported to China (January 2026, official) (opens in a new tab)

Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.