Data centres, cloud and AI compute
Companies build buildings full of computers, fill them with power and cooling, and rent out space or computing time to businesses, cloud users and AI labs.
36 min read
Overview
A data centre is a secure building full of computers, with power, cooling and fibre. This industry builds those buildings, fills them with chips, and rents out either the space and power (colocation) or the computing itself (cloud and AI compute). Customers are businesses, governments, app makers and AI labs. Cloud infrastructure spending reached about USD 143 billion in just the second quarter of 2026, and the largest cloud firms each plan to spend close to USD 200 billion on capital in 2026, mostly for AI.
How big it is
- Cloud infrastructure spending was about USD 143 billion in the second quarter of 2026, up about 43 percent on a year earlier. Amazon held about 28 percent, Microsoft about 20 percent and Google about 15 percent.Source [9]: Synergy Research Group: Q2 cloud market passes USD 143 billion, highest growth rate in eight years (2026) (opens in a new tab)
- For 2026, Amazon guided to about USD 200 billion of capital spending and Alphabet to about USD 195 to 205 billion, much of it for AI data centres.Source [10]: CNBC: hyperscalers face capex scrutiny after the Alphabet report (July 2026) (opens in a new tab)
- Nvidia earned USD 193.7 billion of data centre revenue in fiscal 2026.Source [13]: NVIDIA: financial results for the fourth quarter and fiscal 2026 (official) (opens in a new tab)
- Data centres used about 415 TWh of electricity in 2024, about 1.5 percent of world use, and the IEA expects about 945 TWh by 2030.Source [1]: International Energy Agency: Energy and AI, executive summary (official, April 2025) (opens in a new tab)
- Primary North American markets had a record-low vacancy of about 1.4 percent in the first half of 2026, with a record 7,481 MW under construction.Source [3]: CBRE: North America Data Center Trends H1 2026 (September 2026) (opens in a new tab)
The sub-industries
- 1.Hyperscale public cloud
- 2.Retail colocation and interconnection
- 3.Hyperscale and build-to-suit developers
- 4.GPU clouds (neoclouds)
- 5.Power and cooling equipment for data centres
- 6.AI model and inference platforms
Equipment makers supply power and cooling kit; developers and colocation firms build and run the buildings. Hyperscale clouds and GPU clouds fill them with chips and sell computing by the hour. AI model companies rent that computing to train models and sell answers to apps and businesses.
How it works
Follow the product from raw inputs to the customer. Each step says what happens, what goes in and out, who does it, and how much margin it keeps.
Power and land
Margin variesDevelopers find land near a strong grid connection, sign long contracts for electricity, and wait for the utility to deliver the power.
- Inputs in
- Land with zoning, Grid connection, Power purchase agreements
- Outputs out
- A powered site ready to build on
- Who does it
- Developers, utilities and power producers, such as NextEra in the US, Adani Green in India and ACWA Power in Saudi Arabia.
- Value added
- A large grid connection can take years to get. A site with power secured is worth far more than land alone, because power is the bottleneck.
Electrical and cooling equipment
Medium marginMakers supply transformers, switchgear, backup generators, batteries, chillers and liquid cooling systems.
- Inputs in
- Copper, steel and electronics, Factory capacity, Engineering
- Outputs out
- Power distribution and backup systems, Air and liquid cooling systems
- Who does it
- Schneider Electric (France), Vertiv and Eaton (US), ABB (Switzerland), Siemens Energy and Hitachi Energy for transformers.
- Value added
- Keeps servers running without a single second of power loss and removes their heat. When everyone builds at once, delivery slots become scarce and valuable.
Design and construction
Thin marginBuilders put up the shell, install power and cooling, and test the site before handing it over.
- Inputs in
- Construction labour, Concrete and steel, Equipment from suppliers
- Outputs out
- A finished data hall measured in MW of IT capacity
- Who does it
- Specialist contractors such as Turner and DPR (US), Mercury (Ireland) and Larsen and Toubro (India), or the hyperscaler's own teams.
- Value added
- Turns land, power and kit into usable capacity on time. Build costs rose about 21 percent per MW from late 2024 to 2026.
Chips, servers and networking
Fat marginAI chips and processors are built into servers and racks, joined by fast networks, and shipped to the site.
- Inputs in
- GPUs and processors, Memory and storage, Network switches and optical links
- Outputs out
- Server racks ready to plug in
- Who does it
- Nvidia and AMD for chips, plus custom chips from Google, Amazon and Microsoft; servers from Foxconn, Quanta, Dell and Supermicro.
- Value added
- Supplies the computing power itself. Chips make up more than half of the cost of an AI data centre, and the leading designer earns very high margins.
Facility operation and colocation
Medium marginOperators run the building all day and night, rent space and power to tenants, and connect them to networks and clouds.
- Inputs in
- Finished halls, Operations staff, Fibre connections
- Outputs out
- Rented capacity per kW, Cross-connects between customers and networks
- Who does it
- Equinix, Digital Realty, NTT Data, AirTrunk, Khazna (UAE), Yotta (India), STT GDC (Singapore).
- Value added
- Gives tenants secure, reliable space without building their own. Busy sites with many networks become meeting points worth paying extra for.
Cloud and GPU computing
Margin variesCloud firms run servers in their own or rented halls and sell computing, storage and AI chips by the hour or by use.
- Inputs in
- Data centre capacity, Servers and chips, Software and engineers
- Outputs out
- Virtual servers, storage and databases, GPU hours, Managed AI services
- Who does it
- Amazon Web Services, Microsoft Azure, Google Cloud, Oracle, Alibaba Cloud, and GPU clouds such as CoreWeave and Nebius.
- Value added
- Lets customers rent exactly the computing they need, when they need it, without buying hardware. The cloud firm earns by keeping servers busy.
AI models and platforms
Margin variesAI labs train models on large GPU clusters, then sell answers through apps and programming interfaces.
- Inputs in
- GPU hours, Training data, Researchers
- Outputs out
- AI models, Chat apps and model access priced per token
- Who does it
- OpenAI, Anthropic and Google (US), Mistral AI (France), G42 (UAE), Sarvam AI (India), DeepSeek and Alibaba (China).
- Value added
- Turns raw computing into useful answers, code and content that businesses and people pay for.
Software and end users
Margin variesSoftware firms, banks, retailers, governments and consumers use cloud and AI services in their products and work.
- Inputs in
- Cloud and AI services, Their own data and staff
- Outputs out
- Apps, digital services and business processes
- Who does it
- Every kind of business, from Netflix and Shopify to banks and governments.
- Value added
- Where the computing finally creates value for customers, through faster service, lower cost or new products.
Reuse and recycling
Thin marginOld servers and chips are resold, reused for lighter work, or broken down to recover metals.
- Inputs in
- Retired servers and GPUs, Testing and data wiping
- Outputs out
- Second-hand hardware, Recovered metals
- Who does it
- IT asset disposal firms such as Sims Lifecycle Services and Iron Mountain, and second-hand GPU brokers.
- Value added
- Recovers some value from chips that are too old for frontier AI but still useful.
Value built step by step
How the price of one unit grows as it passes each step, and who gets each slice.
Illustrative, rounded figures. One unit: one AI GPU hour sold for USD 2.50 by a GPU cloud, with the chip busy 70 percent of the time (costs built up layer by layer).
| Stage | Price out | Value added | Where it goes |
|---|---|---|---|
| 1. Electricity from the power producer and grid | USD 0.13 | +USD 0.13 | About 1.25 kW including cooling at about USD 0.10 per kWh, paid to the utility. |
| 2. Data centre space, power delivery, cooling and network | USD 0.36 | +USD 0.23 | Colocation rent and network fees paid to the building operator, which also pays back the equipment makers and builders. |
| 3. Chip manufacture: foundry, memory and packaging | USD 0.56 | +USD 0.20 | Foundries such as TSMC and memory makers such as SK hynix, through the price of the chip spread over five years. |
| 4. Chip designer's margin and research | USD 1.01 | +USD 0.45 | The chip designer, such as Nvidia, which prices the chip far above its cost to make. |
| 5. Server makers and network gear | USD 1.16 | +USD 0.15 | Server builders such as Foxconn or Supermicro, and network switch makers. |
| 6. Cost of idle hours | USD 1.65 | +USD 0.49 | Nobody pays for the 30 percent of hours the chip sits idle, so the cost of those hours lands on the hours that are sold. |
| 7. Interest on money borrowed to buy chips | USD 1.95 | +USD 0.30 | Lenders who funded the chips, often at high rates for newer GPU clouds. |
| 8. GPU cloud staff, software, sales and profit | USD 2.50 | +USD 0.55 | The GPU cloud's own costs and a thin profit. |
Each step's share of the final price (USD 2.50)
- 1. Electricity from the power producer and grid5.2%
- 2. Data centre space, power delivery, cooling and network9.2%
- 3. Chip manufacture: foundry, memory and packaging8%
- 4. Chip designer's margin and research18%
- 5. Server makers and network gear6%
- 6. Cost of idle hours20%
- 7. Interest on money borrowed to buy chips12%
- 8. GPU cloud staff, software, sales and profit22%
So what: The chip designer captures the largest single slice, while the GPU cloud keeps only part of the last 55 cents and carries the risk of idle time and debt. If utilization falls or prices drop by a third, the GPU cloud's margin vanishes first. That is why the profit sits with the chip makers and the hyperscalers today.
Inputs and outputs
Key inputs
The main costs and materials, and their weight in total cost.
| Input | What it is for | Share of cost |
|---|---|---|
| Electricity | Running servers and cooling all day and night; a site's size is measured in MW of power. | usually passed on to colocation tenants; about 5 to 15 percent of a GPU cloud's costs |
| Grid connection and power contracts | Getting enough firm power to a site, often the slowest step. | power infrastructure is about 21 percent of build cost(source 5) |
| AI chips and servers | The computing itself; GPUs for AI, processors for general cloud. | more than half of AI data centre capital spending; the largest cost for clouds(source 19) |
| Building and land | Shell, sitework and land for the halls. | core, shell and sitework about 17 percent and land about 7 percent of build cost(source 5) |
| Cooling systems | Removing heat; AI racks need liquid cooling piped to the chips. | a large part of mechanical build cost, plus power for cooling every hour |
| Network and fibre | Linking servers inside the site and the site to users and clouds. | about 5 to 15 percent of a cloud's equipment cost, more for AI clusters |
| Water | Cooling in many designs, especially in hot climates. | small in cost but often limits where sites can be built |
| Skilled staff | Engineers who run sites, software engineers who run clouds, researchers who build models. | about 5 to 10 percent of revenue for colocation; larger for clouds and AI labs |
| Capital and debt | Funding buildings and chips years before revenue arrives. | interest was about 25 percent of revenue at one large GPU cloud in mid-2026(source 11) |
Outputs
What the industry produces, by-products included.
- Rented data centre capacity, priced per kW per month
- Cloud computing, storage and databases sold by use
- GPU hours for AI training and inference
- AI model access priced per token, and AI apps
- Interconnection between networks, clouds and businesses
- By-products: large amounts of waste heat (sometimes reused for district heating in the Nordics) and retired servers
Business models
The ways companies here make money.
| Model | How it earns | Examples | Typical margin |
|---|---|---|---|
| Retail colocation and interconnection | Rents racks and cages per kW per month and charges fees for each cross-connect between customers and networks. | Equinix, Digital Realty, NTT Data, STT GDC | EBITDA about 50 percent; operating about 20 percent |
| Wholesale and build-to-suit | Builds whole halls or campuses for one large tenant and rents them on leases of 10 to 15 years or more at a lower price per kW. | AirTrunk, Vantage, QTS, Khazna, Yotta, CtrlS | EBITDA 50 to 70 percent once leased; thin returns if halls sit empty |
| Hyperscale public cloud | Sells computing, storage, databases and AI services by the hour or by use to millions of customers. | Amazon Web Services, Microsoft Azure, Google Cloud, Oracle, Alibaba Cloud | operating 25 to 40 percent at the leaders |
| GPU cloud | Rents AI chips by the hour or on contracts of one to five years, often funded with debt. | CoreWeave, Nebius, Lambda, Crusoe, Yotta Shakti Cloud | EBITDA can be high, yet net losses are common after depreciation and interest |
| AI model access | Charges per token used through programming interfaces, or a monthly subscription for chat apps. | OpenAI, Anthropic, Google, Mistral AI | varies widely; heavy training costs mean many labs lose money |
| Equipment supply | Sells power and cooling systems for new builds, then earns service fees. | Schneider Electric, Vertiv, Eaton, ABB | operating 15 to 25 percent |
Business model patterns: fill the assets, subscription, commodity. Spot the pattern in a new industry and you already know the first questions to ask.
Revenue and profit
What drives revenue
- MW leased or chips rented
- Revenue grows with capacity sold; every leased MW or busy GPU earns, while empty ones earn nothing.
- Price per kW or per GPU hour
- Tight supply lifts rents; new chips push down prices for older GPUs, so price can fall by a third in a year.
- AI demand from labs and enterprises
- Training and inference both need large clusters; big AI contracts can fill a campus at once.
- Contract length
- Long leases and multi-year GPU contracts lock in revenue and make borrowing cheaper.
- Interconnection density
- In retail colocation, each new customer adds value to the others, so cross-connect fees grow faster than space.
- Data residency and sovereign AI
- Laws that keep data in the country and government AI programmes create local demand in India, the Gulf and Europe.
- Range of cloud services
- Clouds sell databases, analytics and AI on top of basic computing, which lifts revenue per customer.
What drives profit
- Utilization
- Buildings and chips cost the same whether busy or idle. A GPU renting 70 percent of hours makes money; at about 46 percent it only breaks even.
- Chip life and depreciation
- Writing chips off over three years instead of five makes yearly cost much higher, so the assumed life can swing profit more than price.
- Cost of power
- Cheap, steady power lowers cost per GPU hour and is the main reason sites move to the Nordics, the Gulf, Texas or Johor.
- PUE (power efficiency)
- A lower PUE means less power wasted on cooling. The industry average was about 1.54 in 2025; new AI sites aim for 1.1 to 1.3.
- Build cost and speed
- Faster builds start earning sooner. Build costs of about USD 8.9 million to 23.3 million per MW decide the yield on each project.
- Cost of capital
- Most capacity is funded with debt, so interest rates and lender confidence move profit directly.
- Custom chips
- Hyperscalers that design their own chips, such as Google's TPUs, pay less than buying from Nvidia.
How costs divide
For a typical company, as a share of revenue.
| Cost line | Share of revenue |
|---|---|
| Operating costs before depreciation at a colocation leader (staff, maintenance, power not passed through, rent, sales) | about 50 percent of revenue; Equinix adjusted EBITDA margin about 49 percent in 2025(source 12) |
| Depreciation and other costs below EBITDA at a colocation leader | about 30 percent of revenue(source 12) |
| Operating profit at a colocation leader | about 20 percent of revenue(source 12) |
| Capital spending at a colocation leader | nearly half of revenue (about 47 percent) in 2025(source 12) |
| Interest at a GPU cloud | about 25 percent of revenue at CoreWeave in the second quarter of 2026(source 11) |
| Depreciation of chips at a GPU cloud | often 40 to 50 percent of revenue |
| Electricity at a GPU cloud | about 5 to 10 percent of revenue |
Worked example: one unit
Start with the revenue
One AI GPU rented out by the hour for a year: USD 15,330 comes in.
GPU hours sold: 8,760 hours x 70 percent x USD 2.50
Take away the unit's own costs
3 costs take USD 10,095, 66% of revenue.
The biggest: depreciation: USD 35,000 GPU and server share over five years, at 46%.
See what is left
USD 5,235 is left, 34% of revenue. This is the unit's contribution.
See the numbers
| Line | Amount | ShareShare of revenue |
|---|---|---|
| GPU hours sold: 8,760 hours x 70 percent x USD 2.50 | USD 15,330 | 100% |
| Minus Depreciation: USD 35,000 GPU and server share over five years | USD 7,000 | 46% |
| Minus Electricity: 1.25 kW including cooling x 8,760 hours x USD 0.10 per kWh | USD 1,095 | 7.1% |
| Minus Colocation rent, network and support | USD 2,000 | 13% |
| What is left (contribution) | USD 5,235 | 34% |
Check: USD 15,330 minus USD 10,095 of costs leaves USD 5,235.
So what: The GPU breaks even at about 46 percent utilisation, and profit swings far more than revenue. Price and chip life move it most: at USD 1.80 an hour profit falls below USD 1,000, and writing the chip off over three years instead of five cuts it below USD 600, before any interest on the money borrowed to buy it.
Who keeps the profit
Most profit today sits with the chip makers, above all Nvidia, and with the hyperscalers that sell cloud at scale. Colocation earns a steady, property-like return on long leases. GPU clouds and new builders earn the thinnest and riskiest margins, because they borrow to buy chips that lose value quickly. AI labs spend heavily on computing and are still proving they can earn more than they spend.
What wins
Selling points
What lets the best companies win customers.
- Power in hand
- A site with a signed, large grid connection can sign tenants now, while rivals wait years. In 2026 power, not land, decides who wins.
- Interconnection hubs
- Equinix sites in cities such as London, Frankfurt and Singapore host hundreds of networks, so customers go there to connect to everyone at once.
- Breadth of cloud services
- AWS, Azure and Google Cloud offer hundreds of services in one place, which makes it simpler for businesses to build everything on one cloud.
- Access to the newest chips
- Clouds that get new Nvidia chips first win AI labs, which need the fastest hardware to train frontier models.
- Speed to build
- Developers that can deliver a 100 MW hall in under two years win hyperscale contracts.
- Local presence and trust
- Governments and banks in India, the Gulf and Europe prefer providers that keep data in the country, such as Yotta, Khazna or center3.
Moats
Defences that keep competitors out for years.
- Secured power and permits
- Grid connections and planning permits take years and are limited in many cities, such as Dublin, Amsterdam and Singapore, so existing sites are hard to copy.
- Network effects in interconnection
- Each extra network in a retail colocation site makes it more valuable to the next tenant, so busy sites stay busy.
- Scale in cloud
- Hyperscalers buy chips, power and equipment at volumes no rival can match, giving them lower cost per unit.
- Customer switching costs
- Moving data and software out of one cloud is slow and costly, and moving racks between buildings is disruptive.
- Long leases with strong tenants
- Leases of 10 to 15 years with hyperscalers give steady income that lenders fund cheaply.
- Custom chips and software
- Hyperscalers' own chips and software stacks lower their costs and tie customers in.
SWOT
Strengths and weaknesses of the industry today, and the opportunities and threats ahead.
Strengths
- Demand growing faster than at any time in years: cloud spending grew about 43 percent in the second quarter of 2026.
- Long leases and contracted backlogs that give revenue visibility.
- High barriers to entry from power, permits and capital.
- Essential to almost every business and to AI.
- Hyperscalers' deep pockets and existing customer bases.
Weaknesses
- Huge capital needs, often funded by debt.
- Chips lose value in a few years while buildings last decades, a mismatch that is easy to misprice.
- Dependence on one main chip supplier for AI.
- Heavy use of power and water, which draws public and regulatory pushback.
- Customer concentration: a few hyperscalers and AI labs sign most large leases.
Opportunities
- AI inference as millions of businesses add AI to daily work.
- Sovereign AI programmes in India, the Gulf and Europe.
- New markets with power to spare, such as Saudi Arabia, the UAE, the Nordics, Johor in Malaysia and parts of India.
- Liquid cooling and heat reuse.
- Renewable power and on-site generation deals.
Threats
- An AI spending slowdown leaving new capacity empty just as it comes online.
- GPU prices falling fast as newer chips arrive.
- Grid limits and moratoriums on new sites, as some cities have imposed.
- Export controls that limit which countries can buy advanced chips.
- Rising interest rates that raise funding costs.
- More efficient AI models that need less computing per answer.
Rules and risks
Rules that shape the money
- Data protection and residency laws, such as the EU GDPR, India's Digital Personal Data Protection Act 2023 and Saudi Arabia's Personal Data Protection Law, push some data to stay in the country and create local demand.
- Grid connections and planning permits are controlled locally. In Ireland data centres used 23 percent of metered electricity in 2025, and new connections near Dublin have been tightly limited.(source 15)
- The EU Energy Efficiency Directive requires larger data centres to report energy and water use.
- US export rules decide which countries and buyers can get advanced AI chips. From January 2026, licences for chips such as Nvidia's H200 to China are reviewed case by case.(source 20)
- Governments fund AI compute directly: India's IndiaAI Mission offers more than 38,000 GPUs to startups and researchers at about INR 65 per GPU hour.(source 16)
- The EU plans EUR 20 billion for AI gigafactories within its InvestAI programme.(source 17)
Cycles and risks
- Data centres are built in waves. Chips, transformers and cooling are ordered at once, capacity arrives two or three years later, and if demand slows, rents and GPU prices fall just as it opens.
- GPU prices fell from their 2024 peak on many platforms; AWS cut on-demand H100 instance prices by up to about 45 percent in June 2025, which squeezed smaller GPU clouds.(source 8)
- Investors now question when record capital spending will pay back, and a cut in hyperscaler budgets would hit equipment makers, developers and chip makers together.(source 10)
- Power shortages delay projects: the IEA expects data centre electricity use to roughly double from 2024 to 2030.(source 1)
- Long equipment lead times, such as about a year for large transformers, can leave a building finished but unpowered.
- Each new chip generation makes older GPUs worth less, so the assumed useful life of chips is a key risk.
Sub-industries
Each one broken down the same way. Open the ones you need.
Hyperscale public cloudVery large companies that rent computing, storage and AI tools over the internet to millions of customers.
Hyperscale public cloud: How it differs
They own both the buildings and the servers and sell computing by use, not by space. Three US firms hold about two thirds of the market, and they also design their own chips. Their scale lets them earn strong margins even while spending record sums on AI capacity.
Hyperscale public cloud: Customers
Startups, large companies, governments, app makers and AI labs.
Hyperscale public cloud: Supply chain
Sites and power
Medium marginThe cloud builds its own campuses or leases halls from developers.
- Inputs in
- Land and power, Construction
- Outputs out
- Cloud regions
- Who does it
- The hyperscalers with developers such as Vantage and AirTrunk.
- Value added
- Gives capacity close to customers.
Servers and chips
Fat marginThe cloud buys or designs chips and servers and fills the halls.
- Inputs in
- Chips from Nvidia, AMD and its own designs, Servers from contract makers
- Outputs out
- Compute and storage pools
- Who does it
- Nvidia, AMD, Google TPU, Amazon Trainium, Foxconn, Quanta.
- Value added
- Supplies the raw computing.
Cloud services
Fat marginSoftware turns hardware into services customers rent by the hour.
- Inputs in
- Software engineers, Global network
- Outputs out
- Computing, storage, databases, AI services
- Who does it
- AWS, Azure, Google Cloud, Oracle, Alibaba Cloud.
- Value added
- Lets customers rent what they need without owning hardware.
Hyperscale public cloud: Business models
| Model | How it earns | Examples | Typical margin |
|---|---|---|---|
| Pay as you go and committed use | Charges by the hour, gigabyte or request, with discounts for one to three year commitments. | AWS, Microsoft Azure, Google Cloud, Oracle, Alibaba Cloud | operating 25 to 40 percent at the leaders |
Hyperscale public cloud: One unit: revenue, costs and profit
Illustrative, rounded figures. One unit: USD 100 of cloud revenue.
| Line | Amount | Share of revenue |
|---|---|---|
| Cloud services billed | USD 100 | 100% |
| Minus Depreciation of servers and chips | USD 25 | 25% |
| Minus Data centre space, power and cooling | USD 12 | 12% |
| Minus Network | USD 5 | 5% |
| Minus Operations staff | USD 10 | 10% |
| Minus Research and development | USD 10 | 10% |
| Minus Sales and marketing | USD 8 | 8% |
| Profit | USD 30 | 30% |
Check: USD 100 minus USD 70 of costs leaves USD 30.
So what: Servers and buildings are the biggest costs and are mostly fixed, so keeping them busy is how clouds earn a high margin. Heavy AI spending now raises depreciation, which pressures margins unless AI revenue grows fast.
Hyperscale public cloud: How costs divide
| Cost line | Share of revenue |
|---|---|
| Depreciation of servers and buildings | about 20 to 30 percent of revenue, rising with AI spending |
| Power, space and network | about 15 to 20 percent of revenue |
| Staff and research | about 15 to 25 percent of revenue |
| Sales and marketing | about 5 to 10 percent of revenue |
| Capital spending (cash) | very high; Amazon guided to about USD 200 billion for 2026(source 10) |
Hyperscale public cloud: What drives revenue
- Workloads moving to the cloud
- Businesses still run many systems in their own sites; each move adds cloud revenue.
- AI services
- Renting GPUs and selling AI models adds fast-growing revenue.
- Committed contracts
- Large multi-year deals lock in spend from big customers.
Hyperscale public cloud: What drives profit
- Server utilization
- Sharing servers among many customers keeps them busy.
- Custom chips
- Own chips cut the cost of AI compute compared with buying GPUs.
- Server life
- Longer assumed lives lower depreciation each year.
Hyperscale public cloud: Key inputs and outputs
| Input | What it is for | Share of cost |
|---|---|---|
| Servers and chips | Computing and storage. | the largest capital cost |
| Power | Running and cooling servers. | about 5 to 10 percent of revenue |
| Software engineers | Building and running services. | a large part of staff and research cost |
Outputs: Virtual servers; Storage and databases; AI services and GPU hours; Analytics and security tools.
Hyperscale public cloud: Selling points
- Hundreds of services
- Customers can build everything in one place.
- Global regions
- Data can sit close to users and inside each country.
Hyperscale public cloud: Moats
- Switching costs
- Moving data and software out is slow and costly, and data leaving the cloud is charged.
- Scale
- Buying power and chips at huge volume lowers costs for each unit.
Hyperscale public cloud: SWOT
Hyperscale public cloud: Strengths
- Huge scale
- Strong margins
- Broad customer base
Hyperscale public cloud: Weaknesses
- Record capital needs
- Dependence on Nvidia for AI chips
- Outages affect many customers at once
Hyperscale public cloud: Opportunities
- AI services
- Sovereign cloud regions
- Moving more enterprise systems
Hyperscale public cloud: Threats
- Regulation of cloud switching and data
- AI spending slowdown
- Customers moving some work back to own sites
Hyperscale public cloud: Key measures
- Market share
- Share of cloud infrastructure spending.Typical: Amazon about 28 percent, Microsoft about 20 percent, Google about 15 percent in Q2 2026(source 9)
- Revenue growth
- Growth in cloud revenue.Typical: market up about 43 percent a year in Q2 2026(source 9)
- Capital spending
- Cash spent on buildings and servers.Typical: about USD 195 to 205 billion guided at Alphabet for 2026(source 10)
Hyperscale public cloud: Margin and capital
- Typical margin
- Operating 25 to 40 percent at the leaders
- Capital intensity
- Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.
Hyperscale public cloud: Players
Amazon Web Services (US), Microsoft Azure (US), Google Cloud (US), Oracle (US), Alibaba Cloud, Tencent Cloud and Huawei Cloud (China), OVHcloud (France), Jio and Yotta clouds (India).
Hyperscale public cloud: How it comes up in a case
- Should a hyperscaler build its own sites or lease from developers?
- Should a cloud open a new region in Saudi Arabia or India?
- Our cloud margins fell as AI spending rose. What should we do?
Retail colocation and interconnectionCompanies that rent space and power for a customer's own servers and connect them to many networks.
Retail colocation and interconnection: How it differs
Customers bring their own servers and rent racks or cages, usually a few kW to a few MW. The most valuable sites are city hubs where hundreds of networks and clouds meet, so interconnection fees grow faster than space. It earns a steady, property-like return.
Retail colocation and interconnection: Customers
Banks, telecom firms, content firms, cloud providers and enterprises.
Retail colocation and interconnection: Supply chain
Site and build
Medium marginThe operator builds or buys sites in big cities near fibre routes.
- Inputs in
- Land and power, Construction
- Outputs out
- Data halls
- Who does it
- Equinix, Digital Realty, NTT Data.
- Value added
- Creates secure, connected space.
Leasing
Medium marginCustomers rent racks and cages per kW per month.
- Inputs in
- Sales teams, Power capacity
- Outputs out
- Rent contracts
- Who does it
- Colocation operators.
- Value added
- Gives customers space without building their own.
Interconnection
Fat marginCustomers link to each other, to networks and to clouds with cables inside the building.
- Inputs in
- Fibre cross-connects, Network exchanges
- Outputs out
- Cross-connects and exchange ports
- Who does it
- Equinix, DE-CIX, LINX.
- Value added
- Lets customers reach partners directly, faster and cheaper than over the internet.
Retail colocation and interconnection: Business models
| Model | How it earns | Examples | Typical margin |
|---|---|---|---|
| Rent plus interconnection | Charges per kW per month for space and power, plus a monthly fee for each cross-connect. | Equinix, Digital Realty, NTT Data, STT GDC, Sify | EBITDA about 50 percent; operating about 20 percent |
Retail colocation and interconnection: One unit: revenue, costs and profit
Illustrative, rounded figures. One unit: one 10 kW rack in a city colocation site for one year.
| Line | Amount | Share of revenue |
|---|---|---|
| Rent and cross-connect fees | USD 33,000 | 100% |
| Minus Power and cooling not passed through | USD 3,000 | 9.1% |
| Minus Staff and maintenance | USD 5,500 | 17% |
| Minus Property tax, ground rent and insurance | USD 2,500 | 7.6% |
| Minus Sales and administration | USD 4,000 | 12% |
| Minus Depreciation of building and equipment | USD 10,000 | 30% |
| Profit | USD 8,000 | 24% |
Check: USD 33,000 minus USD 25,000 of costs leaves USD 8,000.
So what: Customers usually pay for their own electricity, so power is not the operator's biggest cost. Depreciation is. Filling empty space and adding cross-connects lifts profit fastest.
Retail colocation and interconnection: How costs divide
| Cost line | Share of revenue |
|---|---|
| Operating costs before depreciation | about 50 percent of revenue(source 12) |
| Depreciation | about 25 to 30 percent of revenue |
| Operating profit | about 20 percent of revenue(source 12) |
| Capital spending (cash) | nearly half of revenue in 2025(source 12) |
Retail colocation and interconnection: What drives revenue
- Rent per kW
- Tight markets let operators raise rents on renewal.
- Cross-connects
- Each new link between customers adds a monthly fee.
- Occupancy
- Filling empty space adds revenue at little extra cost.
Retail colocation and interconnection: What drives profit
- Occupancy
- Fixed costs spread over more tenants.
- Power efficiency
- Lower PUE cuts the power the operator pays for.
- Pricing on renewal
- Contracts reprice every few years, lifting margins in tight markets.
Retail colocation and interconnection: Key inputs and outputs
| Input | What it is for | Share of cost |
|---|---|---|
| City sites | Being close to networks and users. | land about 7 percent of build cost(source 5) |
| Power capacity | Serving tenants' servers. | usually passed through to tenants |
| Operations staff | Running sites all day and night. | about 5 to 10 percent of revenue |
Outputs: Rented racks and cages; Cross-connects; Internet exchange ports.
Retail colocation and interconnection: Selling points
- Network density
- Hundreds of networks in one building save customers money and time.
- Global footprint
- Customers can use the same provider in many cities.
Retail colocation and interconnection: Moats
- Network effects
- Each new network makes the site more valuable to everyone else.
- Scarce city sites
- Power and permits in big cities are hard to get.
Retail colocation and interconnection: SWOT
Retail colocation and interconnection: Strengths
- Steady recurring rent
- Network effects
- Diverse customers
Retail colocation and interconnection: Weaknesses
- High capital needs
- Limited power in city centres
- Slower growth than AI builds
Retail colocation and interconnection: Opportunities
- AI inference close to users
- Private links to clouds
- New hubs in India, the Gulf and Africa
Retail colocation and interconnection: Threats
- Customers moving fully to cloud
- Power limits in cities
- Rising build costs
Retail colocation and interconnection: Key measures
- Adjusted EBITDA margin
- Cash profit over revenue.Typical: about 49 percent at Equinix in 2025(source 12)
- Rent per kW per month
- Typical price for space and power.Typical: about USD 180 to 275 in Silicon Valley in late 2025(source 4)
- PUE
- Total site power over IT power.Typical: industry average about 1.54 in 2025(source 2)
Retail colocation and interconnection: Margin and capital
- Typical margin
- Operating about 20 percent; EBITDA about 50 percent
- Capital intensity
- Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.
Retail colocation and interconnection: Players
Equinix (US), Digital Realty (US), NTT Data (Japan), STT GDC (Singapore), Sify and CtrlS (India), Khazna (UAE), Teraco (South Africa), Data4 (France).
Retail colocation and interconnection: How it comes up in a case
- Should a telecom operator in Southeast Asia enter colocation?
- Should we buy a colocation firm in India?
Hyperscale and build-to-suit developersCompanies that build huge data centre campuses and rent whole buildings to big cloud firms on long leases.
Hyperscale and build-to-suit developers: How it differs
They sell to a handful of giant tenants on leases of 10 to 15 years or more, at a lower price per kW than retail colocation. The business is closest to property development: find power, sign an anchor tenant, build, then refinance. Much of the money comes from infrastructure and private equity funds.
Hyperscale and build-to-suit developers: Customers
Hyperscalers such as Microsoft, Amazon, Google, Meta and Oracle, and AI labs and GPU clouds.
Hyperscale and build-to-suit developers: Supply chain
Power and land
Margin variesThe developer secures land and a large grid connection.
- Inputs in
- Land, Grid and power contracts
- Outputs out
- Powered land
- Who does it
- Developers such as Vantage, QTS, AirTrunk and AdaniConneX.
- Value added
- Creates the scarcest input, power at scale.
Build
Thin marginContractors build halls to the tenant's design.
- Inputs in
- Equipment, Construction labour
- Outputs out
- Finished halls
- Who does it
- Contractors with equipment from Schneider, Vertiv and Eaton.
- Value added
- Delivers capacity on time.
Lease and operate
Medium marginThe tenant moves in and pays rent for 10 to 15 years or more.
- Inputs in
- Operations staff, Maintenance
- Outputs out
- Rental income
- Who does it
- The developer.
- Value added
- Gives the tenant capacity without tying up its own capital.
Hyperscale and build-to-suit developers: Business models
| Model | How it earns | Examples | Typical margin |
|---|---|---|---|
| Develop and lease | Builds campuses for anchor tenants and earns long-term rent, often selling stakes to funds after leasing. | Vantage, QTS (Blackstone), AirTrunk (Blackstone), Khazna, Yotta, AdaniConneX | EBITDA 50 to 70 percent once leased |
Hyperscale and build-to-suit developers: One unit: revenue, costs and profit
Illustrative, rounded figures. One unit: one MW leased to a hyperscaler for one year.
| Line | Amount | Share of revenue |
|---|---|---|
| Rent at USD 130 per kW per month | USD 1,560,000 | 100% |
| Minus Depreciation of a USD 12 million build | USD 600,000 | 38% |
| Minus Operations staff and maintenance | USD 150,000 | 9.6% |
| Minus Property tax and insurance | USD 60,000 | 3.8% |
| Minus Interest on borrowing | USD 450,000 | 29% |
| Minus Overheads | USD 50,000 | 3.2% |
| Profit | USD 250,000 | 16% |
Check: USD 1,560,000 minus USD 1,310,000 of costs leaves USD 250,000.
So what: Profit is steady once leased, but depends on build cost and interest rates. An empty MW still carries the depreciation and interest, so signing tenants before building is key.
Hyperscale and build-to-suit developers: How costs divide
| Cost line | Share of revenue |
|---|---|
| Depreciation | about 35 to 45 percent of revenue |
| Interest | about 20 to 30 percent of revenue |
| Operations and maintenance | about 8 to 12 percent of revenue |
| Property tax, insurance and overheads | about 5 to 8 percent of revenue |
Hyperscale and build-to-suit developers: What drives revenue
- MW leased
- Each MW signed adds years of rent.
- Rent per kW
- Shortages let developers raise rents on new deals.
- Power pipeline
- More secured power means more capacity to sell.
Hyperscale and build-to-suit developers: What drives profit
- Build cost per MW
- Lower cost raises yield on each project.
- Pre-leasing
- Signing an anchor before building removes empty-hall risk.
- Cheap financing
- Long leases with strong tenants attract low cost debt.
Hyperscale and build-to-suit developers: Key inputs and outputs
| Input | What it is for | Share of cost |
|---|---|---|
| Power | Running the campus. | power infrastructure about 21 percent of build cost(source 5) |
| Construction | Building halls. | about USD 8.9 million to 23.3 million per MW all in(source 5) |
| Capital | Funding builds years before rent. | interest about 20 to 30 percent of revenue |
Outputs: Leased data halls; Powered land banks; Stakes sold to infrastructure funds.
Hyperscale and build-to-suit developers: Selling points
- Speed to power
- Hyperscalers sign with whoever can deliver powered capacity first.
- Scale of campus
- AI training needs hundreds of MW in one place.
Hyperscale and build-to-suit developers: Moats
- Power and land banks
- Secured grid connections take years to replicate.
- Long leases
- Tenants rarely move once installed.
Hyperscale and build-to-suit developers: SWOT
Hyperscale and build-to-suit developers: Strengths
- Long contracts
- Strong tenants
- Record low vacancy
Hyperscale and build-to-suit developers: Weaknesses
- Few tenants
- Heavy debt
- Long build times
Hyperscale and build-to-suit developers: Opportunities
- AI training campuses
- New markets in the Gulf, India and Southeast Asia
- Selling stakes to funds
Hyperscale and build-to-suit developers: Threats
- Hyperscalers cutting spending
- Grid delays
- Rising build costs
Hyperscale and build-to-suit developers: Key measures
- MW leased and under construction
- Capacity signed and being built.Typical: a record 7,481 MW under construction in primary North American markets in H1 2026(source 3)
- Vacancy
- Share of built capacity not leased.Typical: about 1.4 percent in primary North American markets(source 3)
- Yield on cost
- Yearly operating profit over build cost.Typical: often 10 to 12 percent targeted
Hyperscale and build-to-suit developers: Margin and capital
- Typical margin
- EBITDA 50 to 70 percent once leased
- Capital intensity
- Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.
Hyperscale and build-to-suit developers: Players
Vantage and QTS (US), AirTrunk (Australia and Asia), Khazna (UAE), Humain (Saudi Arabia), AdaniConneX and Yotta (India), Princeton Digital Group (Singapore), atNorth (Nordics).
Hyperscale and build-to-suit developers: How it comes up in a case
- Where should we build a 300 MW AI campus?
- A private equity fund wants to buy a data centre developer. Is it a good investment?
GPU clouds (neoclouds)Newer companies that rent out AI chips by the hour to AI labs and businesses.
GPU clouds (neoclouds): How it differs
They focus only on AI computing, often renting space from developers and buying chips with debt. Revenue can grow very fast with large contracts from AI labs, but chips lose value in a few years and prices fall as new chips arrive, so profit is fragile.
GPU clouds (neoclouds): Customers
AI labs, startups, enterprises training models, and hyperscalers needing extra capacity.
GPU clouds (neoclouds): Supply chain
Chips and servers
Fat marginThe GPU cloud buys GPUs and servers, usually from Nvidia and its partners.
- Inputs in
- GPUs, Debt funding
- Outputs out
- GPU clusters
- Who does it
- Nvidia, Supermicro, Dell.
- Value added
- Supplies scarce AI chips.
Space and power
Medium marginClusters go into leased halls with liquid cooling.
- Inputs in
- Colocation leases, Power
- Outputs out
- Running clusters
- Who does it
- Developers such as Core Scientific and Applied Digital.
- Value added
- Hosts dense AI racks of about 120 kW.
Compute sales
Margin variesGPU hours are sold on demand or on contracts with software to manage them.
- Inputs in
- Sales teams, Orchestration software
- Outputs out
- GPU hours
- Who does it
- CoreWeave, Nebius, Lambda, Crusoe.
- Value added
- Gives customers ready AI clusters fast.
GPU clouds (neoclouds): Business models
| Model | How it earns | Examples | Typical margin |
|---|---|---|---|
| Contracted capacity | Signs one to five year take-or-pay contracts with AI labs and hyperscalers. | CoreWeave, Nebius, Crusoe | EBITDA can be high (about 59 percent at CoreWeave), yet net losses after interest |
| On-demand GPU hours | Rents GPUs by the hour at list prices. | Lambda, RunPod, Yotta Shakti Cloud | thin and volatile |
GPU clouds (neoclouds): One unit: revenue, costs and profit
Illustrative, rounded figures. One unit: one AI GPU rented for a year, busy 70 percent of the time at USD 2.50 an hour.
| Line | Amount | Share of revenue |
|---|---|---|
| GPU hours sold: 8,760 hours x 70 percent x USD 2.50 | USD 15,330 | 100% |
| Minus Depreciation of a USD 35,000 GPU and server share over five years | USD 7,000 | 46% |
| Minus Electricity including cooling | USD 1,095 | 7.1% |
| Minus Colocation rent, network and support | USD 2,000 | 13% |
| Minus Interest on money borrowed to buy the chip | USD 2,500 | 16% |
| Profit | USD 2,735 | 18% |
Check: USD 15,330 minus USD 12,595 of costs leaves USD 2,735.
So what: Profit is thin after interest. At USD 1.80 an hour, or with a three-year chip life, the GPU loses money, which is why contract length and utilization matter more than growth.
GPU clouds (neoclouds): How costs divide
| Cost line | Share of revenue |
|---|---|
| Depreciation of chips | about 40 to 50 percent of revenue |
| Interest | about 25 percent of revenue at CoreWeave in Q2 2026(source 11) |
| Colocation and network | about 10 to 15 percent of revenue |
| Electricity | about 5 to 10 percent of revenue |
GPU clouds (neoclouds): What drives revenue
- Contract backlog
- Large signed contracts turn into revenue as capacity goes live.
- Price per GPU hour
- Newer chips earn more; older chips' prices fall.
- Utilization
- More hours rented means more revenue from the same chips.
GPU clouds (neoclouds): What drives profit
- Chip life
- A longer useful life lowers yearly depreciation.
- Funding cost
- Cheaper debt raises profit after interest.
- Customer quality
- Contracts with strong customers lower the risk of unpaid bills and empty chips.
GPU clouds (neoclouds): Key inputs and outputs
| Input | What it is for | Share of cost |
|---|---|---|
| GPUs | The product being rented. | about 40 to 50 percent of revenue as depreciation |
| Debt | Buying chips before revenue arrives. | interest about 25 percent of revenue at one leader(source 11) |
| Power and space | Running dense AI racks. | about 15 to 25 percent of revenue |
Outputs: GPU hours; Dedicated AI clusters; Managed training and inference.
GPU clouds (neoclouds): Selling points
- Speed to capacity
- Can stand up large clusters faster than many hyperscalers.
- AI focus
- Software and support built only for AI work.
GPU clouds (neoclouds): Moats
- Early access to chips
- Close ties with Nvidia secure supply in shortages.
- Signed backlog
- Long contracts lock in customers for years.
GPU clouds (neoclouds): SWOT
GPU clouds (neoclouds): Strengths
- Fast growth
- AI specialist
- Large backlogs
GPU clouds (neoclouds): Weaknesses
- Heavy debt
- Few customers
- Chips lose value fast
GPU clouds (neoclouds): Opportunities
- Inference demand
- Sovereign AI clouds
- Hyperscalers buying overflow capacity
GPU clouds (neoclouds): Threats
- GPU price falls
- Hyperscalers cutting prices
- AI spending slowdown
GPU clouds (neoclouds): Key measures
- Contracted backlog
- Future revenue customers have committed to.Typical: about USD 104 billion at CoreWeave in mid-2026(source 11)
- Price per GPU hour
- What customers pay for one GPU for one hour.Typical: about USD 4 on-demand list price for an H100 in September 2026(source 7)
- Utilization
- Share of GPU hours rented.Typical: break-even near half in the illustrative example
GPU clouds (neoclouds): Margin and capital
- Typical margin
- High EBITDA but often a net loss after depreciation and interest
- Capital intensity
- Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.
GPU clouds (neoclouds): Players
CoreWeave, Lambda and Crusoe (US), Nebius (Netherlands), Yotta Shakti Cloud (India), Core42 (UAE), Fluidstack (UK), GMI Cloud (US and Taiwan).
GPU clouds (neoclouds): How it comes up in a case
- Our GPU cloud is growing fast but losing money. What should we do?
- How should we price GPU capacity: on demand or on multi-year contracts?
Power and cooling equipment for data centresCompanies that make the transformers, backup power and cooling systems that keep data centres running.
Power and cooling equipment for data centres: How it differs
They sell equipment, not computing, and benefit from every new build whoever the tenant is. Order books grow when everyone builds at once, and delivery slots become a source of pricing power. AI racks need liquid cooling, a fast-growing niche.
Power and cooling equipment for data centres: Customers
Developers, hyperscalers, colocation operators and contractors.
Power and cooling equipment for data centres: Supply chain
Materials and components
Thin marginSuppliers provide copper, steel, electrical steel, electronics and pumps.
- Inputs in
- Copper and steel, Electronics
- Outputs out
- Components
- Who does it
- Metal and component makers worldwide.
- Value added
- Supplies the raw parts.
Manufacturing
Medium marginMakers build switchgear, UPS systems, generators, chillers and liquid cooling units.
- Inputs in
- Components, Factory labour
- Outputs out
- Power and cooling systems
- Who does it
- Schneider Electric, Vertiv, Eaton, ABB, Cummins.
- Value added
- Turns parts into reliable systems.
Install and service
Fat marginSystems are installed, tested and maintained for years.
- Inputs in
- Field engineers, Spare parts
- Outputs out
- Running systems, Service contracts
- Who does it
- The makers and their partners.
- Value added
- Keeps sites running without power loss.
Power and cooling equipment for data centres: Business models
| Model | How it earns | Examples | Typical margin |
|---|---|---|---|
| Equipment plus service | Sells systems for new builds and earns service fees on the installed base. | Schneider Electric, Vertiv, Eaton, ABB, Legrand | operating 15 to 25 percent |
Power and cooling equipment for data centres: One unit: revenue, costs and profit
Illustrative, rounded figures. One unit: one power and cooling package for a 2 MW data hall.
| Line | Amount | Share of revenue |
|---|---|---|
| Package price | USD 3,000,000 | 100% |
| Minus Materials and components | USD 1,500,000 | 50% |
| Minus Factory labour | USD 300,000 | 10% |
| Minus Engineering and research | USD 150,000 | 5% |
| Minus Installation and commissioning | USD 200,000 | 6.7% |
| Minus Sales and administration | USD 330,000 | 11% |
| Profit | USD 520,000 | 17% |
Check: USD 3,000,000 minus USD 2,480,000 of costs leaves USD 520,000.
So what: Margins rise when demand outruns factory capacity. Service on installed systems keeps earning after the building boom slows.
Power and cooling equipment for data centres: How costs divide
| Cost line | Share of revenue |
|---|---|
| Materials and components | about 45 to 55 percent of revenue |
| Factory labour | about 8 to 12 percent of revenue |
| Research and engineering | about 4 to 6 percent of revenue |
| Sales and administration | about 10 to 15 percent of revenue |
Power and cooling equipment for data centres: What drives revenue
- Data centre construction
- Every new MW needs power and cooling kit.
- Liquid cooling
- AI racks need new, higher value cooling systems.
- Service base
- More installed systems means more service income.
Power and cooling equipment for data centres: What drives profit
- Factory capacity
- Full factories spread fixed cost and allow higher prices.
- Copper and steel prices
- Metal costs swing margins unless passed through.
- Service mix
- Service earns higher margins than new equipment.
Power and cooling equipment for data centres: Key inputs and outputs
| Input | What it is for | Share of cost |
|---|---|---|
| Copper and electrical steel | Transformers, cables and switchgear. | a large part of materials cost |
| Electronics | Controls and UPS systems. | a significant share of materials |
| Skilled field engineers | Installing and servicing systems. | most of service cost |
Outputs: Switchgear and transformers; UPS and backup generators; Chillers and liquid cooling; Service contracts.
Power and cooling equipment for data centres: Selling points
- Delivery slots
- In a shortage, the maker that can ship on time wins the order.
- Liquid cooling know-how
- Few firms have proven systems for 120 kW AI racks.
Power and cooling equipment for data centres: Moats
- Installed base
- Operators stick with brands their staff know and have spares for.
- Certification and track record
- Uptime matters so much that customers avoid untested suppliers.
Power and cooling equipment for data centres: SWOT
Power and cooling equipment for data centres: Strengths
- Benefit from every build
- Service income
- Long order books
Power and cooling equipment for data centres: Weaknesses
- Factory limits
- Metal price exposure
- Cyclical new orders
Power and cooling equipment for data centres: Opportunities
- Liquid cooling
- Grid and on-site power
- Heat reuse
Power and cooling equipment for data centres: Threats
- Build slowdown
- New low cost rivals
- Supply shortages of transformers
Power and cooling equipment for data centres: Key measures
- Order backlog
- Orders not yet delivered.
- Book-to-bill
- New orders over sales; above 1 means growth.
- Lead time
- Time from order to delivery.Typical: about a year for large transformers
Power and cooling equipment for data centres: Margin and capital
- Typical margin
- Operating 15 to 25 percent
- Capital intensity
- MediumA fair amount of money is tied up, in things like stores, stock or equipment.
Power and cooling equipment for data centres: Players
Schneider Electric (France), Vertiv and Eaton (US), ABB (Switzerland), Legrand (France), Cummins (US, generators), Delta Electronics (Taiwan), Hitachi Energy (Japan and Switzerland).
Power and cooling equipment for data centres: How it comes up in a case
- Should a cooling maker build a new factory for liquid cooling?
- How big is the market for data centre power equipment in India?
AI model and inference platformsCompanies that build AI models and sell their answers to apps, businesses and people.
AI model and inference platforms: How it differs
They are the largest buyers of AI computing. Training a frontier model costs huge sums up front, then each answer (inference) costs a little computing, priced per token. Prices per token fall quickly as models get more efficient, so volume must grow faster.
AI model and inference platforms: Customers
Consumers paying for chat apps, software firms building on models, and large businesses and governments.
AI model and inference platforms: Supply chain
Compute
Margin variesLabs rent or build GPU clusters for training and inference.
- Inputs in
- GPU hours, Data centre capacity
- Outputs out
- Training and inference capacity
- Who does it
- Hyperscalers, GPU clouds and labs' own sites.
- Value added
- Supplies the computing to build and run models.
Model training
Margin variesResearchers train models on large data sets over weeks or months.
- Inputs in
- Researchers, Training data
- Outputs out
- Trained models
- Who does it
- OpenAI, Anthropic, Google, Mistral AI, DeepSeek.
- Value added
- Creates the model's abilities.
Products and access
Fat marginModels are sold through apps and programming interfaces.
- Inputs in
- Product teams, Sales and support
- Outputs out
- Chat apps, Model access priced per token
- Who does it
- The labs and cloud marketplaces.
- Value added
- Puts the model in customers' hands.
AI model and inference platforms: Business models
| Model | How it earns | Examples | Typical margin |
|---|---|---|---|
| Usage priced model access | Charges per million tokens of input and output. | OpenAI, Anthropic, Google, Mistral AI | positive gross margin on inference; heavy training costs often mean overall losses |
| Subscriptions | Charges a monthly fee for chat apps and business plans. | ChatGPT, Claude, Gemini, Le Chat | varies |
| Open models with services | Releases models freely and earns from hosting, support or custom work. | Mistral AI, Alibaba Qwen, Sarvam AI | varies |
AI model and inference platforms: One unit: revenue, costs and profit
Illustrative, rounded figures. One unit: one million tokens of model output sold for USD 10.
| Line | Amount | Share of revenue |
|---|---|---|
| Price per million tokens | USD 10 | 100% |
| Minus Inference compute (GPU hours) | USD 4 | 40% |
| Minus Share of model training cost | USD 2.50 | 25% |
| Minus Research and staff | USD 1.50 | 15% |
| Minus Sales, support and hosting overheads | USD 1 | 10% |
| Profit | USD 1 | 10% |
Check: USD 10 minus USD 9 of costs leaves USD 1.
So what: Inference alone earns a healthy margin, but training the next model takes much of it. Cheaper compute per token and more users are what make the economics work.
AI model and inference platforms: How costs divide
| Cost line | Share of revenue |
|---|---|
| Inference compute | about 30 to 50 percent of revenue |
| Training compute | can exceed revenue at fast-growing labs |
| Research staff | about 10 to 25 percent of revenue |
| Sales and administration | about 10 to 20 percent of revenue |
AI model and inference platforms: What drives revenue
- Users and usage
- More users and more tokens per user lift revenue.
- Model quality
- Better models win business customers who pay more.
- Enterprise contracts
- Large companies sign yearly commitments.
AI model and inference platforms: What drives profit
- Cost per token
- Better chips and software cut inference cost.
- Training budget
- The size of each new training run sets fixed cost.
- Price competition
- Rival models, including free open models, push prices down.
AI model and inference platforms: Key inputs and outputs
| Input | What it is for | Share of cost |
|---|---|---|
| GPU computing | Training and running models. | the largest cost |
| Researchers and engineers | Building and improving models. | about 10 to 25 percent of revenue |
| Data | Training material, some licensed. | a growing cost through licensing deals |
Outputs: AI models; Chat apps; Programming interfaces priced per token; AI agents for businesses.
AI model and inference platforms: Selling points
- Model quality
- Better reasoning and coding win business customers.
- Trust and safety
- Businesses and governments choose providers they trust with their data.
AI model and inference platforms: Moats
- Compute and talent
- Frontier training needs billions of dollars and scarce researchers.
- Enterprise integration
- Once built into workflows, models are slow to replace.
AI model and inference platforms: SWOT
AI model and inference platforms: Strengths
- Fast revenue growth
- High demand
- Strong talent
AI model and inference platforms: Weaknesses
- Huge training costs
- Many labs lose money
- Dependence on chip and cloud partners
AI model and inference platforms: Opportunities
- AI agents doing whole tasks
- Local language models for India and the Gulf
- Government and enterprise deals
AI model and inference platforms: Threats
- Falling prices per token
- Free open models
- Regulation such as the EU AI Act
AI model and inference platforms: Key measures
- Tokens served
- Volume of model output delivered.
- Price per million tokens
- What customers pay for model use.
- Inference gross margin
- Revenue minus inference compute, over revenue.
AI model and inference platforms: Margin and capital
- Typical margin
- Varies; inference can be profitable, but training costs often mean overall losses
- Capital intensity
- Very highVery large sums must be tied up before the business earns anything, so the cost of that money weighs heavily on profit.
AI model and inference platforms: Players
OpenAI, Anthropic and Google (US), Mistral AI (France), G42 and Core42 (UAE), Sarvam AI (India), DeepSeek, Alibaba Qwen and Moonshot (China), Cohere (Canada).
AI model and inference platforms: How it comes up in a case
- Should a Gulf government fund a national AI model and compute cluster?
- How should an AI lab price its models as costs per token fall?
Key measures
The numbers people in this industry track (also called KPIs, key performance indicators). Ask for the first one or two early in a case.
- IT capacity (MW)
- The power the servers can draw; the main measure of size, capacity sold and capacity under construction.
- Leased share or utilisation
- Share of built capacity that is rented (colocation) or busy (cloud and GPUs).Typical: primary North American markets had record-low vacancy of about 1.4 percent in the first half of 2026(source 3)
- PUE (power usage effectiveness)
- Total site power divided by the power used by the servers; lower is better, 1.0 is the floor.Typical: industry average about 1.54 in 2025; new AI sites aim for about 1.1 to 1.3(source 2)
- Rack density (kW per rack)
- Power drawn by one cabinet of servers; it decides whether a building can host AI and whether liquid cooling is needed.Typical: most racks 10 to 30 kW; the newest AI racks about 120 kW, with power supplies rated for about 132 kW(source 6)
- Rent per kW per month
- The usual colocation price for space, power delivery and cooling.Typical: about USD 180 to 275 in Silicon Valley in late 2025; far lower per kW for large hyperscale leases(source 4)
- Price per GPU hour
- What customers pay to rent one AI chip for one hour; falls as newer chips arrive.Typical: about USD 4 on-demand for an H100 on a specialist GPU cloud list price in September 2026; long contracts cost less(source 7)
- Contracted backlog
- Revenue customers have committed to pay in future; shows how much new capacity is already sold.Typical: CoreWeave reported about USD 104 billion in mid 2026(source 11)
- Capex as a share of revenue
- How much of each year's revenue is spent on new buildings and equipment.Typical: nearly half (about 47 percent) for Equinix in 2025(source 12)
- Time to power
- How long until the grid can deliver the power a new site needs; often the deciding factor.
Benchmarks: typical figures to check a client's numbers against
- Adjusted EBITDA margin, colocation leader
- about 49 percent (Equinix 2025), guided to about 51 percent for 2026(source 12)
- Operating margin, colocation leader
- about 20 percent (Equinix 2025)(source 12)Worked out from operating income of about USD 1.8 billion on about USD 9.2 billion of revenue.
- Adjusted EBITDA margin, GPU cloud
- about 59 percent (CoreWeave, second quarter 2026), yet a net loss after interest(source 11)
- All-in build cost of a new site, US and Canada, excluding chips
- about USD 8.9 million to 23.3 million per MW(source 5)
- Data centres' share of world electricity use
- about 1.5 percent in 2024 (about 415 TWh), heading for about 945 TWh by 2030(source 1)
- Data centres' share of Ireland's metered electricity
- 23 percent in 2025, up from 5 percent in 2015(source 15)
In a case
First questions to ask
When a case lands in this industry, these get you to the numbers that matter.
- How much power is available, when can the grid deliver it, at what price, and how clean is it?
- How much capacity is already signed with customers, for how long, and with whom?
- Is this colocation (rent for space and power) or compute (renting chips by the hour)?
- What is the utilisation or leased share today, and what happens if prices fall by a third?
- Over how many years are the chips written off, and how is the investment funded?
Common traps
Mistakes candidates make in this industry, and what to do instead.
- Starting a site case with land price or tax. Start with power: amount, date, price and source.
- Treating the building and the chips as one asset. The building lasts decades; the chips a few years.
- Assuming electricity is the colocation operator's main cost. Customers usually pay for their own power on top of rent.
- Assuming today's GPU prices last. Prices fell sharply after 2024 on many platforms, and newer chips keep arriving.
- Counting announced capacity as if it were built, powered and leased.
- Reaching for a generic framework instead of the real driver of this industry. Instead, start from power: megawatts secured, the date and the price. Then look at rent per kW and utilization.
Typical case prompts in this industry
- Where should we build a 300 MW AI data centre campus?
- Should a telecom operator in Southeast Asia enter the colocation business?
- Our GPU cloud is growing fast but losing money. What should we do?
- Should a Gulf government fund a national AI compute cluster, and how?
- A private equity fund wants to buy a data centre developer. Is it a good investment?
- How should we price GPU capacity: on demand, or on multi-year contracts?
- Should a hyperscaler build its own sites or lease from colocation developers?
Go further
Optional. Open what you need.
Players by region
Well-known companies in each region. You do not need to learn them by heart; they help you picture the market.
- Global
- Amazon Web Services, Microsoft Azure, Google Cloud, Oracle, Equinix and Digital Realty (colocation), Nvidia (AI chips)
- United States
- CoreWeave, Lambda and Crusoe (GPU clouds), Meta (builds for its own use), Vantage and QTS (hyperscale developers)
- Europe
- Nebius (Netherlands, GPU cloud), Data4 (France), atNorth (Nordics), Mistral AI compute (France)
- Middle East
- G42 and Khazna (UAE), Humain (Saudi Arabia, owned by the Public Investment Fund), center3 (stc, Saudi Arabia)
- India
- Yotta, CtrlS, Sify, AdaniConneX, Reliance Jio
- Southeast Asia
- STT GDC and Keppel (Singapore), Princeton Digital Group, AirTrunk, large campuses in Johor (Malaysia) and Batam (Indonesia)
- China
- Alibaba Cloud, Tencent Cloud, Huawei Cloud, GDS
What changed, 2024 to 2026
- Cloud demand accelerated: cloud infrastructure spending reached about USD 143 billion in the second quarter of 2026, up about 43 percent on a year earlier, with Amazon at about 28 percent share, Microsoft about 20 percent and Google about 15 percent.(source 9)
- Record capital spending: for 2026 Amazon guided to about USD 200 billion, Alphabet to about USD 195 to 205 billion and Microsoft to about USD 175 billion (after a lease accounting change; about USD 190 billion on the old basis), much of it for AI data centres, and investors are asking when it will pay back.(source 10)
- Capacity ran short: primary North American vacancy fell to a record low of about 1.4 percent in the first half of 2026, with a record 7,481 MW under construction, and rents kept rising.(source 3)
- GPU prices fell from their 2024 peak on many platforms; AWS cut on-demand H100 instance prices by up to about 45 percent in June 2025, which squeezed smaller GPU clouds.(source 8)
- Sovereign AI: India's IndiaAI Mission offers more than 38,000 GPUs at about INR 65 per GPU hour to startups and researchers; the EU plans EUR 20 billion for AI gigafactories; the UAE's Stargate UAE targets a first 200 MW phase in 2026.(source 16)
- Power became the limit: the IEA expects data centre electricity use to roughly double from 2024 to 2030, so sites now follow available power, not just customers.(source 1)
Words to know
Linked words have a fuller entry in the glossary.
- Data centre
- A secure building full of servers, with power supply, cooling and network connections.
- MW of IT load
- Megawatts of power the servers can draw; how data centres are sized and sold.
- Colocation
- Renting space, power and cooling in a shared data centre for your own servers.
- Hyperscaler
- A very large cloud company, such as Amazon, Microsoft or Google, that builds huge data centres.
- Neocloud (GPU cloud)
- A newer company that rents out AI chips by the hour, such as CoreWeave or Lambda.
- GPU
- Graphics processing unit: a chip that does many small calculations at once, used for AI.
- Training and inference
- Training builds an AI model on huge data; inference uses the model to answer each question.
- PUE (glossary entry)
- Power usage effectiveness: total site power divided by server power; lower is better.
- Rack density
- Power drawn by one cabinet of servers, in kW.
- Sovereign AI
- AI computing built and controlled inside a country for security and independence.
- Power purchase agreement (PPA) (glossary entry)
- A long contract to buy electricity from a producer at an agreed price.
- EBITDA (glossary entry)
- Profit before interest, tax, depreciation and amortisation: a rough measure of cash profit from operations.
Sources
Facts checked on . Worked numbers are illustrative, shaped by these sources rather than one company's figures.
- International Energy Agency: Energy and AI, executive summary (official, April 2025) (opens in a new tab)
- Business Wire: Uptime Institute 15th annual Global Data Center Survey, average PUE 1.54 (July 2025) (opens in a new tab)
- CBRE: North America Data Center Trends H1 2026 (September 2026) (opens in a new tab)
- CBRE press release: Silicon Valley data center market in the second half of 2025, asking rents USD 180 to 275 per kW per month (26 February 2026) (opens in a new tab)
- CRE Daily: data center construction costs jump 21 percent since 2024, USD 8.9 million to 23.3 million per MW, with the cost split (citing Cushman & Wakefield) (opens in a new tab)
- Supermicro: SuperServer SRS-GB200-NVL72 rack specification, power supplies rated at a total of 132 kW (official product page) (opens in a new tab)
- Lambda: GPU cloud on-demand pricing page (official price list, checked September 2026) (opens in a new tab)
- AWS News Blog: up to 45 percent price reduction for Amazon EC2 NVIDIA GPU-accelerated instances (June 2025, official) (opens in a new tab)
- Synergy Research Group: Q2 cloud market passes USD 143 billion, highest growth rate in eight years (2026) (opens in a new tab)
- CNBC: hyperscalers face capex scrutiny after the Alphabet report (July 2026) (opens in a new tab)
- CoreWeave: second quarter 2026 results, revenue, margins and backlog (official) (opens in a new tab)
- Equinix: fourth quarter and full year 2025 results and 2026 guidance (February 2026, official press release filed with the SEC) (opens in a new tab)
- NVIDIA: financial results for the fourth quarter and fiscal 2026 (official) (opens in a new tab)
- Let's Data Science: Microsoft keeps its AI infrastructure plan as reported 2026 capex falls to about USD 175 billion after a lease accounting change (29 July 2026) (opens in a new tab)
- Central Statistics Office Ireland: Data Centres Metered Electricity Consumption 2025 (official, July 2026) (opens in a new tab)
- Press Information Bureau, Government of India: IndiaAI Mission expands AI ecosystem with affordable compute (official) (opens in a new tab)
- European Commission: EU launches InvestAI to mobilise EUR 200 billion of investment in AI, with EUR 20 billion for AI gigafactories (February 2025, official) (opens in a new tab)
- The National: Stargate UAE first phase to be completed in the third quarter of 2026 (December 2025) (opens in a new tab)
- Semiconductor Industry Association: 2026 State of the Industry Report, chips are more than half of AI data centre capital spending (July 2026, official) (opens in a new tab)
- US Bureau of Industry and Security: Commerce revises license review policy for semiconductors exported to China (January 2026, official) (opens in a new tab)
Next industry