Safety stock for a spare part in Dubai
Worked case with 11 questions and 1 exhibit
Case
A fictional distributor in Dubai sells a fast-moving air-conditioner part, bought from a factory in China and shipped by sea. Its sales team wants fewer stock-outs before summer, while the finance team wants less cash tied up in stock. A supplier in the region has also offered a much shorter lead time. How much safety stock should the distributor hold, and is the nearer supplier worth a look?
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the distributor sell?
What the interviewer says
A fictional distributor in Dubai selling spare parts for air conditioners to repair firms. This part is one of its fastest movers.
History
How has stock performed?
What the interviewer says
It ran out twice last summer, each time for about a week, while other parts sat on the shelf for months.
Objective
What service level does it target today?
What the interviewer says
95 percent: a 95 percent chance of not running out before the next delivery arrives.
Financials
What does a unit cost to hold?
What the interviewer says
Each unit costs AED 150, and holding stock costs 25 percent of its value a year.
Market
How much does the part sell?
What the interviewer says
400 units a day on average, with a standard deviation of 120 units a day.
Customers
Who buys the part, and would they pay for better service?
What the interviewer says
Repair firms. A few large ones have said they would pay a little more for guaranteed stock in summer.
Competitors
What do rival distributors do?
What the interviewer says
Two rivals buy from the same factory region. One keeps a small stock in Jebel Ali for emergencies.
Operations
Where does it buy from, and how long does it take?
What the interviewer says
A factory in China, with a lead time of 25 days by sea. The distributor pays for the goods when they ship.
What is the regional supplier offering?
What the interviewer says
A lead time of 9 days. It has not yet quoted a price.
Is anything else changing in the warehouse?
What the interviewer says
The distributor is replacing its forklifts and adding a new barcode system this year.
Constraints
Is there a limit on cash for stock?
What the interviewer says
The bank limits stock financing, so the finance team wants stock to fall, not rise.
Exhibit
Exhibit 1
Bar chart: Daily sales of the part over a typical month (units). Values in units a day. Lowest day: 180; Typical low day: 280; Average day: 400; Typical high day: 520; Highest day: 650.
Illustrative. Most days fall between 280 and 520 units, a standard deviation of about 120.
Solution
Show the solutionHide the solution
Structure
- Safety stock = z x daily standard deviation x square root of lead time
- Variation over the lead time
- Safety stock at 95 and 99 percent
- Holding cost of the difference
- Key: Effect of a shorter lead time
Analysis
1. Variation over 25 days
The square root of 25 is 5.
Standard deviation over the lead time (units): 120 × 5 = 600
2. Safety stock at 95 percent
z is 1.65.
Safety stock at 95 percent (units): 1.65 × 600 = 990
3. Safety stock at 99 percent
z is 2.33.
Safety stock at 99 percent (units): 2.33 × 600 = 1,398
4. Cost of the extra reliability
The extra units, times AED 150, times 25 percent a year.
Extra holding cost for 99 percent (AED a year): (1,398 - 990) × 150 × 0.25 = 15,300
5. Reorder point at 95 percent
25 days of average demand plus safety stock.
Reorder point at 95 percent (units): 400 × 25 + 990 = 10,990
6. Safety stock with a 9-day lead time
The square root of 9 is 3.
Safety stock at 95 percent, 9-day lead time (units): 1.65 × 120 × 3 = 594
7. Stock in transit saved
16 fewer days on the water at 400 units a day, valued at AED 150 and 25 percent a year.
Holding cost saved on goods in transit (AED a year): (25 - 9) × 400 × 150 × 0.25 = 240,000
8. Most the nearer supplier can charge extra
Transit savings plus the smaller safety stock, spread over 146,000 units a year.
Break-even price premium for the 9-day supplier (AED per unit): ((25 - 9) × 400 × 150 × 0.25 + (990 - 594) × 150 × 0.25) ÷ (400 × 365) = 1.75
- The exhibit: Daily sales swing widely around 400, so stock must cover the swings over the whole lead time.
Recommendation
The distributor should stay at 95 percent service unless customers will pay for more, and should seriously price a nearer supplier. Lead time is the hidden inventory lever, so this is a nearshoring question as much as a stock question. First, moving from 95 to 99 percent needs 408 more units, costing about AED 15,300 a year. Second, a 9-day supplier would cut safety stock from 990 to 594 units. Much more important, it would remove 6,400 units from the sea. That saves about AED 240,000 a year in holding cost. Third, those savings mean the nearer supplier can charge up to about AED 1.75 more per unit, about 1.2 percent, and still win. The risk is that a nearer supplier charges more per unit than that, so compare the full landed cost. As a next step, ask for quotes from suppliers in India or the Gulf and compare landed cost per unit.
Risks
- A nearer supplier may charge more than AED 1.75 extra per unit, which removes the saving
- Summer demand may swing more than the 120 units a day used here, so 95 percent service may slip
- A new supplier needs time to prove its quality on a part customers rely on
Next steps
- Ask suppliers in India and the Gulf for landed quotes per unit
- Measure the standard deviation of demand separately for summer months
- Offer 99 percent service only to customers who will pay for it