Profit per GPU for a GPU cloud in Singapore
Worked case with 12 questions and 2 exhibits
Case
A GPU cloud (a neocloud) in Singapore rents out AI GPUs by the hour and reports in USD. Each GPU costs USD 35,000 all in, including its share of the server and network, and is written off over five years. It sells GPU time at USD 2.50 an hour and expects the GPUs to be busy 70 percent of the 8,760 hours in a year. Each GPU draws 1.25 kW including cooling, at USD 0.10 per kWh, around the clock. Colocation rent and support cost USD 2,000 per GPU a year. What is yearly profit per GPU before interest and tax, and at what utilisation does it break even? (Figures are illustrative.)
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
How big is the GPU cloud?
What the interviewer says
It runs about 4,000 GPUs in a rented hall in a Singapore data centre and sells GPU time by the hour.
History
How have GPU prices moved?
What the interviewer says
AWS cut its H100 on-demand prices by up to about 45 percent in June 2025. Specialist clouds such as Lambda listed H100s at about USD 4 an hour in September 2026.
Objective
What are investors asking?
What the interviewer says
Whether each GPU earns enough to justify buying 2,000 more.
Financials
What does a GPU cost, and how long is it written off over?
What the interviewer says
USD 35,000 all in, including its share of servers and network. It is written off over five years.
What does it sell for, and how busy are the GPUs?
What the interviewer says
USD 2.50 an hour on average, after discounts. GPUs are busy about 70 percent of the 8,760 hours in a year.
What are the running costs?
What the interviewer says
Each GPU draws 1.25 kW including cooling, at USD 0.10 per kWh. Rent and support cost USD 2,000 per GPU a year.
How were the GPUs paid for?
What the interviewer says
Loans cover 70 percent of the cost at 9 percent a year. The rest came from investors.
Customers
Who are the customers?
What the interviewer says
Mostly AI start-ups on monthly contracts. The largest customer buys about 25 percent of all hours.
Competitors
Who does it compete with?
What the interviewer says
Large cloud providers and other specialist GPU clouds in Asia, several of which offer discounts for one-year commitments.
Operations
How steady is utilisation?
What the interviewer says
It ranged from 55 to 80 percent by month over the last year.
Anything else in the plan?
What the interviewer says
The firm is trialling liquid cooling on one row of racks and moving its office to a new building.
Constraints
Is power a limit?
What the interviewer says
Yes. The hall has power for about 6,500 GPUs in total, and extra power in Singapore is hard to get.
Exhibits
Exhibit 1
Waterfall chart: Yearly profit per GPU before interest and tax (USD). Values in USD. Revenue, total: 15,330; Depreciation, change: -7,000; Power, change: -1,095; Rent and support, change: -2,000; Profit, total: 5,235.
Illustrative figures.
Exhibit 2
Bar chart: Yearly profit per GPU under each change (USD). Values in USD. Base case: 5,235; Utilisation 50 percent: 855; Price USD 1.80: 942.6; Three-year chip life: 568.33.
Illustrative. One change at a time from the base case.
Solution
Show the solutionHide the solution
Structure
- Profit per GPU = hours sold x price minus (depreciation + power + facility)
- Hours sold = 8,760 x utilisation
- Depreciation = GPU cost / useful life
- Power = kW x 8,760 hours x price per kWh
- Break-even utilisation = total costs / (8,760 x price)
Analysis
1. Hours sold
70 percent of 8,760 hours.
GPU hours sold a year: 8,760 × 0.7 = 6,132
2. Revenue
6,132 hours at USD 2.50.
Revenue per GPU a year (USD): 8,760 × 0.7 × 2.5 = 15,330
3. Depreciation
USD 35,000 over five years.
Depreciation per GPU a year (USD): 35,000 ÷ 5 = 7,000
4. Power
1.25 kW for 8,760 hours at USD 0.10 per kWh (power is drawn even when idle, a simplification).
Power cost per GPU a year (USD): 1.25 × 8,760 × 0.1 = 1,095
5. Profit per GPU
Revenue minus depreciation, power and USD 2,000 of facility costs.
Profit per GPU a year before interest and tax (USD): 15,330 - 7,000 - 1,095 - 2,000 = 5,235
6. Break-even utilisation
Total costs of USD 10,095 divided by the revenue at full use, 8,760 hours at USD 2.50.
Break-even utilisation (percent): (7,000 + 1,095 + 2,000) ÷ (8,760 × 2.5) × 100 = 46.1
7. Profit at a three-year chip life
Depreciation rises to USD 35,000 over three years.
Profit per GPU, three-year life (USD): 15,330 - 35,000 ÷ 3 - 1,095 - 2,000 = 568
8. Break-even price at 70 percent utilisation
Yearly costs of USD 10,095 over 6,132 hours sold.
Break-even price per GPU hour (USD): 10,095 ÷ (8,760 × 0.7) = 1.65
9. Interest on the GPU loan
Loans cover 70 percent of the GPU cost at 9 percent a year, in the first year.
Profit per GPU after first-year interest (USD): 5,235 - 35,000 × 0.7 × 0.09 = 3,030
- Exhibit 1: Depreciation is the largest cost, so the assumed chip life matters as much as the price.
- Exhibit 2: Any one of three plausible changes wipes out most of the profit.
Recommendation
The GPU cloud makes money at these numbers, about USD 5,235 per GPU a year. But it should lock in long contracts, because profit is very sensitive to price and chip life. First, it breaks even at about 46 percent utilisation, so a fall in demand hurts quickly. Second, if the price drops to USD 1.80 an hour at the same 70 percent utilisation, profit falls to under USD 1,000 per GPU. If the chips must be written off over three years instead of five, depreciation rises to about USD 11,700 and profit falls to under USD 600. The break-even price is only about USD 1.65 an hour. Third, after interest on the GPU loans, first-year profit is about USD 3,030 per GPU. This business is a bet on utilisation and price over the chip's life, so the move is to match contract length to that life. The risk is that newer chips make these GPUs cheaper to rent within two or three years. As a next step, compare the length of customer contracts with the life assumed for the chips.
Risks
- Newer, faster chips push down the price customers will pay for older GPUs
- Interest on the debt used to buy GPUs is not in this profit figure
- A single large customer leaving would cut utilisation sharply
Next steps
- Offer a discount for two- and three-year reserved contracts and measure take-up
- Hold off buying 2,000 more GPUs until reserved contracts cover at least half the hours
- Review the five-year chip life with the auditors against resale prices for older GPUs
Sources
Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.