Where a bread line in Cairo loses its minutes

Worked case with 14 questions and 2 exhibits

Case

A bread line at a bakery in Cairo, Egypt is planned to run 600 minutes a day. At full speed it bakes 2 trays a minute (0.5 minutes a tray). Yesterday it stopped for 60 minutes (a breakdown and a change of recipe), baked 900 trays and threw away 60 burnt or broken ones. The owner is thinking about a second oven to meet new orders. What is its OEE, and where do the minutes go? (Fictional bakery, illustrative figures.)

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • What does the line make, and for whom?

    What the interviewer says

    Flat bread and rolls, sold by the tray to 40 shops, cafes and two hotels in Cairo. Bread is baked and delivered the same day.

History

  • Has anyone measured the line before?

    What the interviewer says

    No. It was installed 6 years ago, and the owner tracks only trays baked each day.

Objective

  • Why does the owner care now?

    What the interviewer says

    A hotel group wants 160 more good trays a day from next quarter. That would take the line to 1,000 good trays a day.

Financials

  • What is a good tray worth?

    What the interviewer says

    Each good tray earns about EGP 150 of contribution. A burnt or broken tray earns nothing, and its dough is lost.

  • What would a second oven cost?

    What the interviewer says

    A second oven line costs about EGP 4 million installed. It needs 3 more staff on each shift.

Market

  • Is demand for bread growing?

    What the interviewer says

    Orders from shops are flat. Orders from hotels and cafes grow about 10 percent a year.

Customers

  • What do the hotels care about?

    What the interviewer says

    Delivery before 6 in the morning and even browning. They send back trays that look burnt.

Competitors

  • Who else could supply the hotels?

    What the interviewer says

    Two industrial bakeries in Giza. One of them installed a new oven line last year.

Operations

  • What were the 60 minutes of stops?

    What the interviewer says

    40 minutes when the oven conveyor jammed, and 20 minutes to change from bread to rolls.

  • How fast did the line actually run?

    What the interviewer says

    It is designed for 2 trays a minute. Yesterday it baked 900 trays in 540 running minutes.

  • Why were trays thrown away?

    What the interviewer says

    45 trays were burnt in the oven and 15 broke when they were unloaded.

  • Has anything changed in the ingredients?

    What the interviewer says

    The bakery changed flour supplier last month. Flour now costs 10 percent more.

Constraints

  • Can the line run longer than 600 minutes?

    What the interviewer says

    No. The rest of the day goes to cleaning, maintenance and staff rest.

  • Is there room for a second oven?

    What the interviewer says

    Only by giving up the flour store. Installing it would take about 4 months.

Exhibits

Exhibit 1

From planned minutes to good minutes on the bread line (minutes)

Waterfall chart: From planned minutes to good minutes on the bread line (minutes). Values in minutes. Planned minutes, total: 600; Stops, change: -60; Slow running, change: -90; Defects, change: -30; Good minutes, total: 420.

Source: illustrative.

Exhibit 2

Minutes lost yesterday by cause (minutes)

Bar chart: Minutes lost yesterday by cause (minutes). Values in minutes. Conveyor jam: 40; Recipe change: 20; Slow running: 90; Burnt trays: 22.5; Broken trays: 7.5.

Source: illustrative shift log.

Solution

Show the solution

Structure

  • OEE = good minutes / planned minutes
    • Stops: planned minutes minus running minutes
    • Key: Slow running: running minutes minus the minutes the trays should have taken
    • Defects: minutes spent on trays that were thrown away

Analysis

  1. 1. Running minutes

    Planned 600 minus 60 minutes of stops.

    Running minutes: 600 - 60 = 540

  2. 2. Minutes the trays should take

    900 trays at the ideal 0.5 minutes each.

    Ideal minutes for 900 trays: 900 × 0.5 = 450

  3. 3. Slow running

    The line ran 540 minutes but did only 450 minutes of full-speed work.

    Minutes lost to slow running: 540 - 900 × 0.5 = 90

  4. 4. Defects

    60 thrown-away trays used 0.5 minutes each.

    Minutes lost to defects: 60 × 0.5 = 30

  5. 5. Good minutes

    840 good trays at 0.5 minutes each.

    Good minutes: (900 - 60) × 0.5 = 420

  6. 6. OEE

    Good minutes divided by planned minutes.

    OEE (fraction): 420 ÷ 600 = 0.7

  7. 7. The same answer from the three rates

    Availability 540/600, performance 450/540, quality 840/900, multiplied together.

    OEE from the three rates (fraction): (540 ÷ 600) × (450 ÷ 540) × (840 ÷ 900) = 0.7

  8. 8. Good trays today

    900 trays baked minus 60 thrown away.

    Good trays a day: 900 - 60 = 840

  9. 9. OEE the hotel order needs

    The hotel order takes the target to 1,000 good trays a day, which is 500 good minutes out of 600.

    OEE needed (fraction): 1,000 × 0.5 ÷ 600 = 0.8333

  10. 10. Trays hidden in slow running

    At full speed, the 90 slow minutes would bake more trays.

    Extra trays from the slow minutes: 90 ÷ 0.5 = 180

  11. 11. Good trays with no slow running

    Today's 840 good trays plus the 180 hidden in slow running, if those trays are all good.

    Good trays a day without slow running: (900 - 60) + 90 ÷ 0.5 = 1,020

  12. 12. What the slow minutes are worth

    180 trays a day at EGP 150 of contribution each.

    Contribution in the slow minutes a day (EGP): 90 ÷ 0.5 × 150 = 27,000

  • Exhibit 1: Slow running, not breakdowns, is the biggest loss: 90 of the 180 lost minutes.
  • Exhibit 2: Slow running is one cause but loses more minutes than the jam and the recipe change together.

Recommendation

OEE is 70 percent: of 600 planned minutes, only 420 made good bread. Start with slow running, which loses 90 minutes, more than stops (60) or defects (30). Find out why the line runs below 2 trays a minute. Possible causes: dough not ready, an oven set cooler to avoid burning, or too few staff at the start of the shift. Then cut the recipe change time. Every minute won back here is extra bread with no new oven. The 90 slow minutes hide about 180 trays a day, worth about EGP 27,000. That is more than the 160 extra trays the hotel wants, so improve the line before spending EGP 4 million on a second oven. Bread cannot be baked ahead and stored, so a bakery earns its margin from oven minutes on the day. The main risk is that the line cannot really hold 2 trays a minute, so test full speed for a week first.

Risks

  • The rated speed of 2 trays a minute may be too high for the current oven, so part of the slow running may not be recoverable
  • Running faster may raise the number of burnt trays and eat into the gain
  • If hotel orders keep growing about 10 percent a year, a second oven may still be needed later

Next steps

  • Log speed, stops and thrown-away trays every shift for two weeks, split by cause
  • Watch the first two hours of a shift to see why the line runs below full speed
  • Plan the recipe change for a quiet hour and cut its 20 minutes with prepared trays
  • Revisit the second oven only if OEE is still below 83 percent after three months