So What Club

Starter: Kitase Line Railway: a rural line's loss nearly doubled

Worked case with 11 questions and 2 exhibits

Case

The Kitase Line is a 40-kilometer rural railway in Japan. Its yearly loss has nearly doubled in five years, and the prefecture that covers the loss asks what it should do. The exhibit shows the key figures.

Difficulty: Starter. Format: interviewer-led, with an exhibit. Industry: Public transport. Region: Japan. Interview length: about 25 minutes. The company is fictional and all figures are illustrative.

The companies and figures in this case are made up for practice, unless a source is named.

Questions to ask

Situation

  • Who owns the line?

    What the interviewer says

    A company owned jointly by the prefecture, the towns along the line and local businesses. The prefecture covers the loss each year.

History

  • How have passengers changed?

    What the interviewer says

    They fell steadily from 2.0 million a year five years ago to 1.6 million this year. The second exhibit shows each year.

Objective

  • What does the prefecture want?

    What the interviewer says

    Stop the loss from growing, keep public transport for students and older residents, and decide within a year.

Financials

  • What do passengers pay, and what does the line cost?

    What the interviewer says

    The average fare is JPY 400 a trip. Operating cost is about JPY 1 billion a year.

Market

  • Why are passengers falling?

    What the interviewer says

    The towns are losing population. Most remaining riders are high-school students and older people.

Customers

  • When do people ride?

    What the interviewer says

    About 60 percent of trips are in school travel hours, 7 to 9 in the morning and 3 to 6 in the afternoon.

  • Do tourists use the line?

    What the interviewer says

    A few come in autumn to see the leaves, about 2 percent of trips.

Competitors

  • What other transport is there?

    What the interviewer says

    A road runs alongside the line, and most working adults drive. A private bus runs twice a day.

Operations

  • Can costs be cut on the railway itself?

    What the interviewer says

    Only a little. Most of the JPY 1 billion is track, signals and staff needed whatever the number of passengers. Most stations are already unstaffed.

  • What state is the track in?

    What the interviewer says

    Bridges and track need about JPY 3 billion of renewal within ten years.

Constraints

  • Is outside funding available?

    What the interviewer says

    Assume national and prefectural grants may cover part of the cost of changing how the service is run.

Exhibits

Exhibit 1

Kitase Line, five years ago and this year (illustrative)
Kitase Line, five years ago and this year (illustrative)
MeasureFive years agoThis year
Passengers a year (millions)21.6
Average fare per trip (JPY)400400
Operating cost (JPY billion a year)11

Exhibit 2

Kitase Line passengers a year, millions (illustrative)(million passengers)

Line chart: Kitase Line passengers a year, millions (illustrative). Values in million passengers. Five years ago: 2; Four years ago: 1.92; Three years ago: 1.84; Two years ago: 1.76; Last year: 1.68; This year: 1.6.

Source: illustrative figures for practice.

Solution

Show the solution

Hypothesis

Costs are mostly fixed and passengers are falling, so my hypothesis is that fare rises cannot close the gap and the prefecture will need to change how the service is run.

Structure

  • Loss = passengers x fare - operating cost
    • Key: Passengers: population and who rides
    • Fare
    • Operating cost, mostly fixed
    • Other ways to run the service

Analysis

  1. 1. Revenue five years ago

    2.0 million passengers at JPY 400.

    Revenue five years ago (JPY): 2,000,000 × 400 = 800,000,000

  2. 2. Revenue this year

    1.6 million passengers at JPY 400, 20 percent fewer.

    Revenue this year (JPY): 1,600,000 × 400 = 640,000,000

  3. 3. Loss this year

    Revenue minus JPY 1 billion of operating cost. Five years ago the loss was JPY 200 million.

    Result this year (JPY): 1,600,000 × 400 - 1,000,000,000 = -360,000,000

  4. 4. Cost per passenger

    Each trip now costs this much to provide, against a JPY 400 fare.

    Cost per passenger (JPY): 1,000,000,000 ÷ 1,600,000 = 625

  5. 5. Raise fares 10 percent

    Interviewer: "The line expects 3 percent fewer passengers after a 10 percent fare rise." Revenue becomes:

    Revenue after the fare rise (JPY): 1,600,000 × (1 - 0.03) × 400 × 1.1 = 682,880,000

  6. 6. Curveball: switch to buses

    Interviewer: "The prefecture could turn the track bed into a road only for buses, called bus rapid transit, a model some regional lines in Japan have used. It would cost JPY 550 million a year to run, and passengers would fall a further 10 percent."

    Result with bus rapid transit (JPY): 1,600,000 × 0.9 × 400 - 550,000,000 = 26,000,000

  7. 7. Improvement against the railway

    The bus result minus the railway result.

    Yearly improvement (JPY): (1,600,000 × 0.9 × 400 - 550,000,000) - (1,600,000 × 400 - 1,000,000,000) = 386,000,000

  8. 8. Payback of the conversion

    Interviewer: "Converting the track bed would cost about JPY 2 billion once." Payback on the yearly improvement:

    Payback (years): 2,000,000,000 ÷ ((1,600,000 × 0.9 × 400 - 550,000,000) - (1,600,000 × 400 - 1,000,000,000)) = 5.18

  9. 9. Cost per passenger with buses

    With buses, each trip costs this much to provide, now below the JPY 400 fare:

    Cost per passenger with bus rapid transit (JPY): 550,000,000 ÷ (1,600,000 × 0.9) = 382

  • Exhibit 1: Costs stayed the same while passengers fell by a fifth, so every lost passenger adds to the loss.
  • Exhibit 2: Passengers fall by about 80,000 every year, so the loss will keep growing without a change.

Recommendation

The prefecture should study turning the line into bus rapid transit, rather than rely on fare rises. First, the loss grew from JPY 200 million to JPY 360 million a year because passengers fell 20 percent while costs stayed fixed. Each trip now costs JPY 625 to provide against a JPY 400 fare. Second, a 10 percent fare rise adds only about JPY 43 million of revenue and hits students and older riders hardest. Third, bus rapid transit would turn the loss into a small surplus of about JPY 26 million, an improvement of about JPY 386 million a year. It would repay a JPY 2 billion conversion in about 5 years, even with 10 percent fewer riders. The economics of rural rail explain why: almost all cost is fixed, so falling ridership raises the cost of every trip. Buses bring the cost per trip to about JPY 382, below the fare, and avoid about JPY 3 billion of track and bridge renewal due within ten years. The strategic move is to change the service model while keeping the route and the stations people know. Hold public meetings early, because many residents see the railway as part of their town, and set bus times around school hours.

Risks

  • Residents may oppose losing the railway
  • Passengers could fall by more than 10 percent after the switch

Next steps

  • Count passengers by station and hour to design the bus timetable
  • Ask national and prefectural offices which grants could fund the conversion

Strong and weak answers

A strong candidate

Showed that costs are fixed, compared the fare rise with a change in the service model, and thought about residents and students.

A weak candidate

Recommended a large fare rise to close the gap, without asking who the riders are or how many would stop riding.

Sources
Facts checked against sources on

Spotted something wrong or out of date? Report a mistake. We check every report and correct the page.