Case
Tlhakodi Chrome runs a chrome mine in South Africa and buys all its power from the national utility. The mine's power bill has risen sharply over the past decade, and outages on the local network still stop production on some days. The company is considering building its own solar plant with batteries. Should it?
Difficulty: Standard. Format: candidate-led, with interviewer dialogue. Industry: Mining and energy. Region: South Africa. Interview length: about 30 minutes. The company is fictional and all figures are illustrative.
The companies and figures in this case are made up for practice, unless a source is named.
Questions to ask
Situation
What does the mine produce?
What the interviewer says
About 1.2 million tonnes of chrome ore a year, sold to ferrochrome smelters.
History
How have outages changed?
What the interviewer says
National load-shedding has become rare, but outages on the local network still stop production. The exhibit shows days lost each year.
Objective
What does the board want?
What the interviewer says
Lower and more predictable power bills and fewer production stops, while keeping capital for a planned mine expansion.
Financials
How much power does the mine use, and at what price?
What the interviewer says
About 200 GWh a year, bought from the national utility at about ZAR 2.00 per kWh.
How much does an outage cost?
What the interviewer says
Outages stopped production for about 10 days last year (illustrative). Each lost day costs about ZAR 5 million of margin.
What would the solar plant cost and produce?
What the interviewer says
A 50 MW solar plant with batteries costs ZAR 1.2 billion (ZAR 1,200 million), produces about 100 GWh a year and costs ZAR 20 million a year to run. It would avoid about 60 percent of the lost days.
How should I compare options over time?
What the interviewer says
Use 15 years and 10 percent. At 10 percent, ZAR 1 a year for 15 years is worth about ZAR 7.606 today.
Market
Are there other ways to buy clean power?
What the interviewer says
Private developers now sell solar power to mines through the national grid (illustrative).
Customers
Who buys the ore?
What the interviewer says
Smelters in South Africa and China, at monthly prices.
Operations
When does the mine use power?
What the interviewer says
It runs 24 hours a day, and about half of its load is at night. There are about 100 hectares of land next to the mine.
Constraints
How much capital is available?
What the interviewer says
About ZAR 2 billion over three years, and the mine expansion competes for it.
Exhibit
Exhibit 1
Line chart: Production days lost to power outages a year (illustrative). Values in days. Five years ago: 30; Four years ago: 45; Three years ago: 25; Two years ago: 18; Last year: 10.
Source: illustrative figures for practice.
Solution
Show the solutionHide the solution
Hypothesis
The plant saves on the power bill and on lost production. My hypothesis is that it pays back well within its life, but that a cheaper option without an upfront cost may exist.
Structure
- Compare the value of each power option over 15 years
- Today: the power bill and the cost of outages
- Key: Own plant: savings, running cost, investment
- Other options: buying solar power from a developer
- How many outage days change the answer
Analysis
1. Power bill today
Candidate: "200 GWh is 200 million kWh, so at ZAR 2.00 the bill is, in ZAR million:"
Power bill (ZAR million a year): 200 × 2 = 400
2. Cost of outages
Candidate: "10 lost days at ZAR 5 million each."
Outage cost (ZAR million a year): 10 × 5 = 50
3. Yearly benefit of the own plant
Candidate: "100 GWh no longer bought, plus 60 percent of outage costs avoided, minus running costs."
Yearly benefit (ZAR million): 100 × 2 + 0.6 × 10 × 5 - 20 = 210
4. Payback
Candidate: "ZAR 1,200 million divided by the yearly benefit."
Payback (years): 1,200 ÷ (100 × 2 + 0.6 × 10 × 5 - 20) = 5.71
5. NPV of the own plant
Candidate: "Yearly benefit times 7.606, minus the investment."
NPV own plant (ZAR million): (100 × 2 + 0.6 × 10 × 5 - 20) × 7.606 - 1,200 = 397
6. Curveball: a power purchase agreement
Interviewer: "A private developer offers to sell the mine 100 GWh a year of solar power through the national grid at ZAR 1.40 per kWh, with no upfront cost. Because the power comes through the grid, it does not help during outages. The mine can use only about 100 GWh of solar power a year, because much of its load is at night, so it is one option or the other." Candidate: "The yearly saving is:"
Yearly saving (ZAR million): 100 × (2 - 1.4) = 60
7. NPV of the agreement
Candidate: "No investment, so the value is the saving times 7.606."
NPV of the agreement (ZAR million): 100 × (2 - 1.4) × 7.606 = 456
8. Outage days that make the own plant win
Candidate: "The own plant wins only if the outage savings close the gap. Each lost day avoided is worth 60 percent of ZAR 5 million."
Break-even outage days a year: (100 × (2 - 1.4) + 1,200 ÷ 7.606 - 100 × 2 + 20) ÷ (0.6 × 5) = 12.59
9. The gap between the options
Candidate: "The agreement is worth more than the own plant by, in ZAR million:"
Agreement minus own plant (ZAR million): 100 × (2 - 1.4) × 7.606 - ((100 × 2 + 0.6 × 10 × 5 - 20) × 7.606 - 1,200) = 59.1
- The exhibit: Outages have fallen a lot but swing widely, so the value of protection against them is uncertain.
Recommendation
Sign the power purchase agreement unless outages are expected to rise above about 12.6 days a year. First, the own plant is a good project on its own. It saves about ZAR 210 million a year, pays back in under 6 years, and has an NPV of about ZAR 397 million over 15 years. Second, the agreement is worth more, about ZAR 456 million, because it needs no upfront capital, even though it does not protect the mine during outages. Third, the own plant wins only if outages cost more than about 12.6 days of production a year, against 10 days last year. The mine should sign the agreement, keep its ZAR 1.2 billion for mining, and buy a smaller battery or backup system sized only for critical equipment during outages. This is a make or buy choice for power, and capital allocation decides it. The agreement is worth about ZAR 59 million more and leaves capital free for the expansion, which competes for the same ZAR 2 billion. The exhibit shows why outage protection alone does not justify the plant: lost days fell from 45 to 10 in four years, but they swing widely. Revisit the own plant only if outages climb back above about 13 days a year.
Risks
- Grid charges for moving power through the network could rise
- Outages could return at a higher level than expected
Next steps
- Check the grid and network charges in the developer's offer
- Price a smaller backup system for critical equipment
Strong and weak answers
A strong candidate
Valued both options over the same period, saw that the agreement does not help during outages, and found the outage level that changes the answer.
A weak candidate
Chose the own plant because its payback is short, without comparing it with an option that needs no capital.
Sources